Before placing the bond coat the existing pavement surface, including
joints, cracks and edges, shall be thoroughly cleaned to a minimum
depth of one inch with compressed air, vac-all type equipment, or
other approved mechanical or hand methods, to remove all dirt, debris,
and all foreign material.