If approved by the Department, a simplified delineation, a concept
plan or plat, preliminary plat or plan, sediment control plan, or
other appropriate document, verified by a site visit, if appropriate,
may substitute for the forest stand delineation if:
(1) No forest cover is disturbed during a construction activity; and
(2) Designated to be under a long-term protective agreement.