Prior to the issuance of a permit for the demolition of any structure pursuant to N.J.A.C. 5:23-2.17 or other applicable regulation, the person, firm or entity making such application shall post with the Construction Official security in the form of cash, certified check, irrevocable letter of credit or surety bond issued by a surety company authorized to do business in New Jersey. Such security shall be in the amount of $10,000 for one- and two-family homes and accessory buildings and $25,000 for all other buildings. The purpose of the security or condition of the bond shall be to ensure that demolition shall have been performed in a good and workmanlike manner as well as to guarantee compliance with §
179-3 of this chapter, in addition to all other regulations governing demolition. In the event that a bond is posted, the beneficiary of the security or obligee shall be the owner or owners of the land, and any persons having an interest in the realty involved on which the demolition is taking place, and the term of any security, be it cash, certified check, irrevocable letter of credit or surety bond, shall terminate no earlier than the expiration date of the demolition permit, plus an additional 30 days.
[Added 6-20-1989 by Ord. No. 931-89; amended 11-13-1990 by Ord. No.
959-90]
This chapter shall be applicable to the demolition of any structure
and shall include, but not be limited to, construction debris, demolition
debris, roofing debris, trees, including stumps, branches and shrubbery,
excavations such as water main and gas line pipes, ferrous or wood
railroad and trolley tracks, pilings of all kinds, houseboats, docks
and piers.
[Amended 6-20-1989 by Ord. No. 931-89]
Within five days after completion of demolition of any building
or structure, the applicant shall cause to be filed with the Recycling
Official of the Borough a municipal recycling tonnage application
commercial business form and accompanying documentation. Such form
shall be available from the Construction Official and shall be filed
with the Recycling Official of the Borough. In the event that any
person, including an owner, contractor or builder, during the course
of a demolition activity shall discover the existence of recyclable
items, the same shall be reported and duly documented in accordance
with this section, and the Recycling Coordinator shall be notified.
In the event that, within 30 days after demolition of the building or structure, the Recycling Official has not received the required documentation pursuant to §
179-3 of this chapter, and the Construction Official has been notified in writing of the commencement of litigation and the court in which such litigation has commenced, and that said litigation alleges a violation of the purpose or condition of the security or bond posted herewith, the Construction Official shall forthwith transmit such security or bond to the Clerk of the court involved for disposition of the matter.
[Added 10-15-2007 by Ord. No. 1374-2007]
The following shall be required prior to the issuance of a permit
for the demolition of any structure pursuant to N.J.A.C. 5:23-2.17
or other applicable regulation.
A. Certificate of extermination: A certificate of extermination shall
be furnished to the Construction Official from a recognized or acceptable
extermination contractor that the structure to be demolished has been
rodent and vermin exterminated within one week prior to the demolition
of the structure.
B. Continued trapping of vermin: Following the demolition of any structure
pursuant to N.J.A.C. 5:23-2.17 or other applicable regulation, the
owner of the property shall be required to continue trapping for rats,
rodents and other vermin within a perimeter of 50 feet from the demolition
site or the perimeter of the property boundary lines, whichever is
closer to the demolition site, until such time as all demolition debris
have been cleared from the site.
Any person, corporation, partnership, or other entity found to have violated the provisions of this chapter shall be subject to the penalties set forth in Chapter
1, Article
II, General Penalty. All such penalties so imposed shall be enforceable as a lien against the property on which the demolition occurred or was intended to occur. In addition, no permits, certificates of occupancy or other municipal approvals shall issue while any such lien remains outstanding.