As used in this article, the following terms shall have the
meanings indicated:
COVERED PROJECT
A construction, renovation or demolition project for which
a building permit or a demolition permit is required, and for which
a dumpster or roll-off container shall be placed on premises for the
purpose of placement of solid waste materials.
A debris recovery plan shall be filed with the Borough Recycling
Coordinator prior to the commencement of any activity for which municipal
approval is requested as further identified above. The debris recovery
plan shall identify the types and estimated quantities of construction
and demolition debris to be generated from the project, how each material
will be managed, and the name of each facility or service provider
that the entity will use to manage each material. The plan shall further
detail how the applicant shall ensure that a minimum of 50% of the
materials to be generated will be separated and recycled.
Upon completion of the covered project, but before the final
inspection, the owner of the entity carrying out a covered project
shall submit in person or by certified mail to the Borough Recycling
Coordinator the documentation required to demonstrate that the applicant
has met the diversion requirement. The required documentation shall
include the following:
A. A completed debris recovery report, signed by the owner of the entity
carrying out a covered project, indicating the quantity of each material
generated during the covered project diverted or disposed;
B. Receipts from all facilities or service providers utilized to divert
and dispose materials generated during the covered project; and
C. Any additional information that the owner of the entity carrying
out the covered project believes is relevant to determining compliance
with the diversion requirement.
The Borough Recycling Coordinator shall review the information
submitted pursuant to this article and determine whether the owner
of the entity carrying out the covered project has complied, or failed
to comply, with the diversion requirement. The determination regarding
compliance will be provided to the owner of the entity carrying out
the covered project in writing.
An owner of the entity carrying out the covered project may
appeal a determination of failure to comply under this article to
the Borough Construction Official within 30 days of the decision or
determination. The appeal shall be in writing and shall state the
facts and basis for the appeal. A decision by the Construction Official
shall be final.
The Code Enforcement Official, the Police Department, the Department
of Health, the Borough Recycling Coordinator, the Property Maintenance
Official, and the Housing Officer are hereby individually and severally
empowered to enforce the provisions of this article. The respective
enforcing official may, in his or her discretion, post warning stickers
for a first offense. An inspection may consist of dumping and opening
of solid waste bags of containers to detect, by sound or sight, the
presence of any recyclable material.
Any person, corporation, occupant or entity that violates or
fails to comply with any provision of this article or any of the rules
and regulations promulgated hereunder shall, upon conviction thereof,
be punishable by a fine not less than $100, nor more than $1,000.