General. The subdivider shall pay the City of Prescott all fees as
hereinafter required and at the times specified before being entitled
to recording of a plat or certified survey map according to a developer
agreement.
Engineering fee. The subdivider shall pay a fee equal to the actual cost to the City for all engineering work incurred by the City in connection with the plat or certified survey map, including inspections required by the City pursuant to § 510-23C. The subdivider shall pay a fee equal to the actual cost to the City for such engineering work and inspection as the Common Council and/or City Engineer deems necessary to assure that the construction of the required improvements is in compliance with the plans, specifications and ordinances of the City or any other governmental authority. Engineering work shall include the preparation of construction plans, review of preliminary plat, final plat, construction plans, standard specifications and inspection of construction.
Administrative fee. The subdivider shall pay a fee to the City equal
to the cost of any legal, administrative or fiscal work which may
be undertaken by the City in connection with the plat or certified
survey map.
Concept plan. There shall be no fee for the City's review of a concept
or sketch plan of a proposed land division. However, such reviews
shall be conducted only as staff time permits.
A subdivider who submits a preliminary plat for the City Plan Commission
and the Common Council shall file said preliminary plat with the City
Clerk and shall deposit with the City Treasurer a fee to cover the
costs of reviewing said application. The fee for a preliminary plat
shall be as prescribed in the City's fee schedule. If the plat is
rejected, no part of the fee shall be returned to the petitioner.
A reapplication fee as prescribed in the City's fee schedule shall
be paid to the City Clerk at the time of reapplication for approval
or amendment of any preliminary plat which has previously been reviewed.
The subdivider shall pay a fee as prescribed in the City's fee schedule
to the City Clerk at the time of first application for final plat
approval of said plat to assist in defraying the cost of review.
A reapplication fee as prescribed in the City's fee schedule shall
be paid to the City Clerk at the time of a reapplication for approval
or amendment of any final plat which has previously been reviewed.
Should the subdivider submit an amended or revised certified survey,
the resubmittal fee shall be as prescribed in the City's fee schedule
for each amended or revised certified survey.
Objecting agency review fees. The subdivider shall transmit all fees
required for state agency review to the City Clerk at the time of
application. Said review fees shall be retransmitted to the proper
state review agency by the City Clerk. Said fees shall be applicable,
where appropriate, to review fees required by the Wisconsin Department
of Administration, Wisconsin Department of Transportation, Wisconsin
Department of Safety and Professional Services and the Wisconsin Department
of Natural Resources.[4]
Public site fee. If the subdivision does not contain lands to be dedicated as required in this chapter, the City Clerk shall require a fee pursuant to § 510-47 for the acquisition and development of public sites to serve the future inhabitants of the proposed subdivision.
Assessments. All outstanding special charges (including, without
limitation, charges for engineering, legal fees, taxes, public works
fees, etc.) due to the City shall be due prior to the signing of the
final plat or certified survey by the City.