[Adopted 6-5-1956 (Ch. 96, Art. II, of the 1982 Code)]
As used in this article, unless a different meaning clearly appears from the context, the following words shall have the following meanings:
BUILDING
Any building or structure heretofore or hereafter constructed and designed or used for dwelling purposes or for temporary or permanent occupancy by persons.
CONNECTION DATE
With respect to any building, the 90th day after the later of the two following dates: the date of completion of construction or the date of initial occupancy of such building, whichever of said dates shall be the earlier in point of time, and the date of initial operation, as a part of any publicly owned sewage treatment and disposal system in the Borough, of a sewer in the street upon which such building is located.
SEWER
Any publicly owned sewer or main designed for collection or disposal of sanitary sewage and located in any public street in the Borough.
The owner of any building located upon any street in the Borough in which a sewer is now constructed or shall be hereafter constructed shall, prior to the connection date with respect to such building, install a toilet in such building, unless a toilet is installed therein, and shall connect such building and the toilet therein with such sewer.[1]
[1]
Editor's Note: Original Sec. 3, which immediately followed this section and provided for material specifications for connections, was repealed 2-15-1982.
[Amended 3-6-2017 by Ord. No. 1-2017]
If the owner of any property shall fail to make any connection or installation required by this article within the time herein required, the Borough may proceed to make such connection or installation or cause the same to be made and charge and assess the cost thereof against such property pursuant to 40A:26A-1 to 40A:26A-22.