All waste material from any construction project (commercial
or residential) shall be disposed of in a timely and safe manner.
When hazardous materials are involved, the disposal shall be in accordance
with all state and federal laws, statutes, and/or local regulations.
All waste and/or hazardous materials shall be contained in a
proper dumpster/container or within the structure. It shall not be
left to accumulate on the site.
Once a dumpster is full, it shall be emptied within seven days.
If an appropriate dumpster/container is not provided on site, the
contractor/owner will remove the waste on a daily basis.
The person(s) responsible for making sure there is an appropriate
dumpster/container or other means to collect debris on site is the
person(s) who applied for the required building permit.