Curbs shall be installed on both sides of all streets in subdivisions
and land developments as herein specified. Curbs shall be concrete.
Curbs and gutters are to be constructed within the right-of-way.
Sidewalks shall be installed on both sides of all streets in subdivisions and land developments as herein specified. Sidewalks shall be located, if possible, within the street right-of-way line and shall be in accordance with §
430-23 of this chapter.
The land development shall be provided with street name signs
at all intersections. Such signs shall conform to City specifications
and shall be installed by the developer.
Lighting is required at all intersections from the terminus
of the cul-de-sac and at any other intersection deemed necessary.
An adequate storm sewer system, consisting of inlets and other
underground drainage structures and approved outlets, shall be constructed
where the runoff of stormwater and the prevention of erosion cannot
be accomplished satisfactorily by surface drainage facilities. The
system shall be designed by a registered professional engineer.
The plan for the installation of a water supply system must
be prepared for the development. Upon completion of the water supply
system, a reproducible as-built plan of the system must be filed with
the City.
Fire hydrants shall be installed in accordance with the local
fire authority.
All erosion and sediment control measures shall be designed
to minimize impact. The erosion and sediment control plan must be
reviewed by the Luzerne Soil Conservation District.
Compliance with the Americans With Disabilities Act will be required where appropriate.