Add new subsections to Section R306 as follows:
Section R306.5 New single-family dwellings toilet facilities.
Toilet facilities shall be provided within five hundred (500) feet
(measured from the property line adjacent to the street for platted
subdivisions along the public way) for all new single-family dwellings
starting from the time of the first footing inspection until facilities
are available in the dwelling. If the facilities are not located on
the job site, the location of the required facilities shall be posted
on the job site or other certification provided to the Building Code
Official to verify the availability of toilet facilities. The facilities
on the site shall be removed prior to issuance of a temporary certificate
of occupancy.
R306.6 New single-family dwellings construction site maintenance.
All construction sites shall be maintained in a good, clean, and safe
condition, including, but not limited to, the following minimum requirements:
1. Construction materials shall be stored, maintained, and secured
so as to prevent safety risk or danger. Accumulated construction debris
shall be hauled away and disposed of at an approved landfill. Dumpsters
shall be emptied or removed when full and may be used only for construction
debris. Construction materials shall not be stored in a public right-of-way.
2. All mud, dirt, or debris deposited on any street, crosswalk,
sidewalk, or other public property as a result of excavation, construction,
or demolition shall be immediately broom cleaned to the extent possible
and disposed of in an acceptable manner.
3. It shall be unlawful to intentionally place, deposit, or
otherwise dispose of construction debris in any public or private
sewer.
4. Airborne particles shall be controlled on the property at
all times during work by means of a water truck and/or spraying equipment,
or other water sources capable of spraying and thoroughly saturating
all portions of the structure and surrounding property affected by
the work. Spraying shall be undertaken at all times necessary to thoroughly
control the creation and migration of airborne particles, including,
without limitation, dust, from the subject property.
5. Every contractor shall be responsible for all actions of
their employees, agents, and subcontractors under this Subsection,
and shall be responsible for all violations of the provisions of this
Subsection committed by such employees, agents, or subcontractors.