The notice by this Township to make a connection to a sewer
shall consist of a written or printed document requiring such connection
in accordance with the provisions of this chapter and specifying that
such connection shall be made within 60 days from the date such notice
is given. Such notice may be given at any time after a sewer is in
place which can receive and convey sanitary sewage and industrial
wastes for treatment and disposal from the particular improved property.
Such notice shall be served upon the owner either by personal service
or by registered or certified mail or by such other method as at the
time may be provided by law.
No person shall uncover, connect with, make any opening into or use, alter or disturb, in any manner, any sewer or the sewer system without first making application for and securing a permit, in writing, from this Township. Application for a permit required under Code §
200-3.2 shall be made by the owner of the improved property to be served or his/her duly authorized agent.
No connection shall be made to the sewer system unless the manner
in which the connection is made and the material and workmanship employed
in effecting such connection shall comply with the requirements of
the Township's Standard Construction and Material Specifications for
the Sanitary Sewer System.
Whenever the surface of any public street, sidewalk or cartway
is disturbed by construction of the building sewer, the surfacing
material must be restored in kind and maintained to the satisfaction
of the Township. Any and all construction in a public street of the
Township shall be in compliance with the ordinances of the Township,
and any and all construction in a state highway shall be in compliance
with Pennsylvania Department of Transportation requirements and specifications,
and all necessary permits shall be obtained from the Township before
construction is commenced, including the permit required for opening
or disturbing the surface of a street.
No person shall make or cause to be made any change or repair
to or disconnection of the building sewer of any building until he
has fulfilled all of the following conditions:
A. He shall notify the Sewer Department Secretary of his desire and
intention to make such building sewer change, repair or disconnection.
B. He shall apply for and obtain a permit to make such building sewer
change, repair or disconnection. Copies of the required application
and permit are available at the Township Sewer Department office.
C. He shall pay a building sewer inspection fee to cover the cost of
observation by an authorized representative of the Township to insure
that proper materials and installation procedures are utilized to
prevent infiltration or inflow from entering the sewer system. The
inspection fee shall be as set forth from time to time by resolution
of the Board of Commissioners of Upper Allen Township.
D. He shall give the Sewer Department Secretary at least 24 hours' notice
of the time at which such work shall be performed, in order that the
Township's authorized representative may observe the work. Shorter
notice may be acceptable in the event of an emergency.
Whenever this Township has reason to believe any building sewer
has become defective, such building sewer shall be subject to test
and inspection. Defects found upon such test and inspection shall
be corrected, as required by this Township, in writing, at the cost
and expense of the owner of the improved property served through such
building sewer.
A. This Township shall observe the installation and testing of a building
sewer. All equipment and material required for testing shall be furnished
by the owner of the improved property to be connected to a sewer.
An initial inspection fee, as set forth from time to time by resolution
of the Board of Commissioners of Upper Allen Township, will be charged
to the property owner having said building sewer installed, repaired
or replaced.
B. In the event that a building sewer is not approved by this Township,
further test or tests shall be made following completion of necessary
corrections. An additional fee as shall be set from time to time by
resolution of the Board of Commissioners will be charged by the Township
for observation of each test or inspection subsequent to the initial
test or inspection.
C. Building sewers shall be tested in a manner acceptable to the Township.
D. Upon approval of the test of a building sewer by this Township, a
certificate of approval will be issued to the owner of the improved
property to be connected to a sewer by way of a field observation
report, copies of which are available at the Township Sewer Department
office.
Every building sewer of any improved property shall be maintained
in a sanitary and safe operating condition by the owner of such improved
property. Responsibility for the maintenance of building sewers and
service laterals shall be as provided herein.
A. Where the owner's efforts to maintain or restore service establishes
that there is a blockage in or structural failure of the service lateral,
which requires excavation of the service lateral to effect repair
and/or restoration of service, the Township will bear the cost of
such excavation and subsequent repair of the service lateral.
B. When it is determined by the Township that a building sewer is in
need of repair and/or modification, either to remove a blockage, to
repair a structural failure, to eliminate the entry of groundwater,
or to eliminate an illegal discharge, the Township shall notify the
owner and specify a period of time within which the repair must be
made. If the owner does not make the repair or modification within
the specified period of time, the Township may complete the work and
assess the cost of the work, plus 10% for administrative costs, to
the owner.
C. Any building sewer repair or replacement initiated by the owner that
occurs at or within three feet of the point of connection with the
Township sewer lateral shall require the installation of a new six-inch
two-way cleanout at the owner's expense.
D. Replacement of building sewers and appurtenances shall be in accordance
with the Township's Standard Construction and Material Specifications
for the Sanitary Sewer System.
E. If any person shall fail or refuse, upon receipt of a notice of this
Township, in writing, to remedy any unsatisfactory condition with
respect to a building sewer within 60 days of receipt of such notice,
this Township may refuse to permit such person to discharge sanitary
sewage and industrial wastes into the sewer system until such unsatisfactory
condition shall have been remedied to the satisfaction of this Township.
No roof drainage, cellar, surface water, waste from hydrants
or groundwater from underground drainage fields shall be permitted
to drain into the sewer system. The sewer system is intended to convey
sanitary sewage and liquid wastes only.