[R.O. 2016 § 705.100; CC 1994 § 32.300; Ord. No. 1297-19, 6-11-2019]
A. An Article establishing a user charge system
in the City of Park Hills, County of St. Francois, State of Missouri,
to provide funds needed to pay for all expenses associated with the
Mineral Belt Area Wastewater Treatment Works and to pay for upgrades
and extensions of the treatments works, except for and excluding the
treatment plant.
B. The City of Park Hills, Missouri, has constructed
wastewater treatment works to serve the Mineral Belt Area.
C. The City of Park Hills must pay its share
of expenses for operation and maintenance of said treatment works,
including replacement and debt service, and charge all users of said
treatment works accordingly. The City of Park Hills also needs funds
to upgrade and extend the treatment works within the City, except
for and excluding the treatment plant, and these funds are to be collected
from users only within the City limits of Park Hills.
[R.O. 2016 § 705.110; CC 1994 § 32.305; Ord. No. 1297-19, 6-11-2019]
A. It is determined and declared to be necessary
and conducive to the protection of the public health, safety, welfare
and convenience of the City of Park Hills to collect charges from
all users who contribute wastewater to the Mineral Belt Area's treatment
works. The proceeds of such charges so derived will be used for the
operation and maintenance, including replacement and debt service,
for the Mineral Belt Area Wastewater Treatment Works.
B. It is also determined and declared to be
necessary and conducive to the protection of the public health, safety,
welfare and convenience of the City of Park Hills to collect additional
charges from all users within the City limits of Park Hills who contribute
wastewater to the Mineral Belt Area's treatment works. The proceeds
of such charges so derived will be used to pay for upgrades and extensions
of the treatment works within the City limits of Park Hills, except
for and excluding the treatment plant.
[R.O. 2016 § 705.120; CC 1994 § 32.310; Ord. No. 95-96 § 1, 3-12-1996; Ord. No. 295-99 §§ 1
— 2, 9-14-1999; Ord. No. 385-01 § 1, 10-9-2001; Ord. No. 414-02 §§ 1
— 2, 6-11-2002]
A. Each user shall pay for the services provided
by the City based on his/her use of the treatment works as determined
by water meter(s) acceptable to the City.
B. If a residential, commercial or industrial
contributor uses water which is not supplied by the City, the user
charge for that contributor may be based on a wastewater meter(s)
or separate meter(s) installed and maintained at the contributor's
expense and in a manner approved by the City. If a residential contributor
installs no wastewater meter(s) or separate meter(s), the monthly
user charge for that contributor may be based on an estimate determined
by U.S. Census of average household size and a sixty (60) gallons
per day, per person usage plus ten percent (10%) of the estimated
average charge.
C. The minimum charge per month inside the
City limits of Park Hills shall be ten dollars and fifty cents ($10.50).
Of this amount, seven dollars and fifty cents ($7.50) shall be used
for operation and maintenance of the treatment works, including replacement
and debt service, and three dollars ($3.00) shall be used for upgrading
and extending the treatment works within the City, except for and
excluding the treatment plant. The minimum charge per month outside
the City limits of Park Hills shall be seven dollars and fifty cents
($7.50) which shall be used for operation and maintenance, including
replacement and debt service, of the treatment works. In addition,
each contributor both inside and outside the City limits of Park Hills
shall pay a user charge rate for operation and maintenance including
replacement of two dollars and thirty nine cents ($2.39) for each
one thousand (1,000) gallons of water or wastewater as determined
in the preceding Section.
[Ord. No.
1049-13 § 1, 9-24-2013; Ord. No. 1297-19, 6-11-2019; Ord.
No. 1474-22, 6-14-2022]
D. For those contributors who contribute wastewater,
the strength of which is greater than normal domestic sewage, a surcharge
in addition to the normal user charge will be collected. The surcharge
for operation and maintenance including replacement is:
$0.1052
|
per pound BOD
|
0.0894
|
per pound SS
|
See Appendix C
|
per pound other pollutant(s) specify
|
E. Any user which discharges any toxic pollutants
which cause an increase in the cost of managing the effluent or the
sludge from the City's treatment works, or any user which discharges
any substance which singly or by interaction with other substances
causes identifiable increases in the cost of operation, maintenance,
or replacement of the treatment works shall pay for such increased
costs. The charge to each such user shall be as determined by the
responsible plant operating personnel and approved by the City Council.
F. Leaks. Whenever a residential user has
a leak and the circumstances indicate that the loss of water was not
discharged into the sanitary sewer system, the current monthly charge
for sewer service shall be based on the average water consumption
of that account.
G. Industrial Processing Waters. Accounts
with water consumed during industrial processing (not discharged into
the sanitary sewer system) may be adjusted by one of the following
methods:
1.
By use of separate metering devices
and accounts which separate consumption on the basis of sewerage and
non-sewered water. The account indicating water consumption which
is not discharged into the sanitary sewer system shall not be charged
the sewer user charge.
2.
By assessment of the sewer user charge
on the basis of forty (40) gallons per employee per shift per operating
day within the billing period.
[R.O. 2016 § 705.130; CC 1994 § 32.315; Ord. No. 679-06 §§ 1 — 2, 4-11-2006]
A. All users shall be billed monthly. Billings
for any particular month shall be made within thirty (30) days after
the end of that month. Payments are due when the billings are made.
Any payment not received within thirty (30) days after the billing
is made shall be delinquent.
B. When any bill is thirty (30) days in default,
rendition of water and/or sewer service to such premises shall be
discontinued until such bill is paid following due notice and opportunity
for hearing.
C. Discontinued services shall be restored
upon arrangement for the payment of the delinquent bill in full, and
there shall be a reconnect charge of one hundred fifty dollars ($150.00).
[R.O. 2016 § 705.140; CC 1994 § 32.320; Ord. No. 1297-19, 6-11-2019]
The City will review annually that
part of the user charge system which is for operation and maintenance
of the treatment works, including replacement and debt service, whether
inside or outside of the City limits of Park Hills, and revise user
charge rates as necessary to insure that the system generates adequate
revenues to pay the costs of operation and maintenance, including
replacement and debt service, and that the system continues to provide
for the proportional distribution of operation and maintenance costs,
including replacement and debt service, among users.