[R.O. 2003 §415.210; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
The Board of Zoning Adjustment as established by the City of Buckner shall hear and decide appeals and requests for variances from the floodplain management requirements of this Chapter.
[R.O. 2003 §415.220; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
Where an application for a floodplain development permit or request for a variance from the floodplain management regulations is denied by the Public Works Superintendent, the applicant may apply for such floodplain development permit or variance directly to the Board of Zoning Adjustment, as defined in Article V, Section 415.190. The Board of Zoning Adjustment shall hear and decide appeals when it is alleged that there is an error in any requirement, decision, or determination made by the Public Works Superintendent in the enforcement or administration of this Chapter.
[R.O. 2003 §415.230; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
Any person aggrieved by the decision of the Board of Zoning Adjustment or any taxpayer may appeal such decision to the Jackson County Circuit Court as provided in Section 89.110, RSMo.
[R.O. 2003 §415.240; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
A. 
In passing upon such applications for variances, the Board of Zoning Adjustment shall consider all technical data and evaluations, all relevant factors, standards specified in other Sections of this Chapter and the following criteria:
1. 
The danger to life and property due to flood damage;
2. 
The danger that materials may be swept onto other lands to the injury of others;
3. 
The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner;
4. 
The importance of the services provided by the proposed facility to the community;
5. 
The necessity to the facility of a waterfront location, where applicable;
6. 
The availability of alternative locations, not subject to flood damage, for the proposed use;
7. 
The compatibility of the proposed use with existing and anticipated development;
8. 
The relationship of the proposed use to the Comprehensive Plan and floodplain management program for that area;
9. 
The safety of access to the property in times of flood for ordinary and emergency vehicles;
10. 
The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters, if applicable, expected at the site; and
11. 
The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems; streets; and bridges.
[R.O. 2003 §415.250; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
A. 
Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of one-half (1/2) acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, providing Subsections (B) through (F) below have been fully considered. As the lot size increases beyond the one-half (1/2) acre, the technical justification required for issuing the variance increases.
B. 
Variances may be issued for the reconstruction, rehabilitation or restoration of structures listed on the National Register of Historic Places, the State inventory of historic places or local inventory of historic places upon determination, provided the proposed activity will not preclude the structure's continued historic designation.
C. 
Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
D. 
Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.
E. 
Variances shall only be issued upon:
1. 
A showing of good and sufficient cause;
2. 
A determination that failure to grant the variance would result in exceptional hardship to the applicant; and
3. 
A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
F. 
A community shall notify the applicant in writing over the signature of a community official that the issuance of a variance to construct a structure below base flood level will result in increased premium rates for flood insurance up to amounts as high as twenty-five dollars ($25.00) for one hundred dollars ($100.00) of insurance coverage; and such construction below the base flood level increases risks to life and property. Such notification shall be maintained with the record of all variance actions as required by this Chapter.
[R.O. 2003 §415.260; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015; Ord. No. 992, 12-1-2016]
A. 
Any variance granted for an accessory structure shall be decided individually based on a case by case analysis of the buil¬ding's unique circumstances. Variances granted shall meet the following conditions as well as those criteria and conditions set forth in Article V, Sections 415.220 and 415.230 of this Chapter.
B. 
In order to minimize flood damages during the one-hundred-year flood and the threat to public health and safety, the following conditions shall be included for any variance issued for accessory structures that are constructed at grade and wet-floodproofed.
1. 
Use of the accessory structures must be solely for parking and limited storage purposes in Zone A only as identified on the community's Flood Insurance Rate Map (FIRM).
2. 
For any new or substantially damaged accessory structures, the exteri¬or and interior building components and elements (i.e., foundation, wall framing, exterior and interior finishes, flooring, etc.) below the base flood elevation, must be built with flood-resistant materials in accordance with Article IV, Section 415.140(D)(2) of this Chapter.
3. 
The accessory structures must be adequately anchored to prevent flotation, collapse, or lateral movement of the structure in accordance with Article IV, Section 415.140(D)(1) of this Chapter. All of the building's structural components must be capable of resisting specific flood-related forces including hydrostatic, buoyancy, and hydrodynamic and debris impact forces.
4. 
Any mechanical, electrical, or other utility equipment must be located above the base flood elevation or floodproofed so that they are contained within a watertight, floodproofed enclosure that is capable of resisting damage during flood conditions in accordance with Article IV, Section 415.140(D)(4) of this Chapter.
5. 
The accessory structures must meet all National Flood Insurance Program (NFIP) opening requirements. The NFIP requires that enclosure or foundation walls, subject to the one-hundred-year flood, contain openings that will permit the automatic entry and exit of floodwaters in accordance with Article IV, Section 415.150(A)(3) of this Chapter.
6. 
The accessory structures must comply with the floodplain management floodway encroachment provisions of Article IV, Section 415.170(A)(2) of this Chapter. No variances may be issued for accessory structures within any designated floodway, if any increase in flood levels would result during the one-hundred-year flood.
7. 
Equipment, machinery, or other contents must be protected from any flood damage.
8. 
No disaster relief assistance under any program administered by any Federal agency shall be paid for any repair or restoration costs of the accessory structures.
9. 
A community shall notify the applicant in writing over the signature of a community official that: (1) the issuance of a variance to construct a structure below base flood level will result in increased premium rates for flood insurance up to amounts as high as twenty-five dollars ($25.00) for one hundred dollars ($100.00) of insurance coverage, and (2) such construction below the base flood level increases risks to life and property. Such notification shall be maintained with the record of all variance actions as required by this Chapter.
10. 
Wet-floodproofing construction techniques must be reviewed and approved by the community and registered professional engineer or architect prior to the issuance of any floodplain development permit for construction.
[R.O. 2003 §415.270; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
Violation of the provisions of this Chapter or failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with granting of variances) shall constitute a misdemeanor. Any person who violates this Chapter or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than five hundred dollars ($500.00) and, in addition, shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent the City of Buckner or other appropriate authority from taking such other lawful action as is necessary to prevent or remedy any violation.
[R.O. 2003 §415.280; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
The regulations, restrictions and boundaries set forth in this Chapter may from time to time be amended, supplemented, changed or appealed to reflect any and all changes in the National Flood Disaster Protection Act of 1973; provided, however, that no such action may be taken until after a public hearing in relation thereto, at which parties of interest and citizens shall have an opportunity to be heard. Notice of the time and place of such hearing shall be published in a newspaper of general circulation in the City of Buckner. At least twenty (20) days shall elapse between the date of this publication and the public hearing. A copy of such amendments will be provided to the Region VII office of the Federal Emergency Management Agency (FEMA). The regulations of this Chapter are in compliance with the National Flood Insurance Program (NFIP) regulations.
[R.O. 2003 §415.290; Ord. No. 659 §1, 4-4-2002; Ord. No. 970, 7-16-2015]
Unless specifically defined below, words or phrases used in this Chapter shall be interpreted so as to give them the same meanings they have in common usage and to give this Chapter its most reasonable application.
ACCESSORY STRUCTURE
The same as "appurtenant structure."
ACTUARIAL RATES
See "risk premium rates."
ADMINISTRATOR
The Federal Insurance Administrator.
AGENCY
The Federal Emergency Management Agency (FEMA).
AGRICULTURAL COMMODITIES
Agricultural products and livestock.
AGRICULTURAL STRUCTURE
Any structure used exclusively in connection with the production, harvesting, storage, drying, or raising of agricultural commodities.
APPEAL
A request for review of the Floodplain Administrator's interpretation of any provision of this Chapter or a request for a variance.
APPURTENANT STRUCTURE
A structure that is on the same parcel of property as the principal structure to be insured and the use of which is incidental to the use of the principal structure.
AREA OF SPECIAL FLOOD HAZARD
The land in the floodplain within a community subject to a one-percent (1%) or greater chance of flooding in any given year.
BASE FLOOD
The flood having a one-percent (1%) chance of being equaled or exceeded in any given year.
BASEMENT
Any area of the structure having its floor subgrade (below ground level) on all sides.
BUILDING
See "structure."
CHIEF EXECUTIVE OFFICER or CHIEF ELECTED OFFICIAL
The official of the community who is charged with the authority to implement and administer laws, ordinances and regulations for that community.
COMMUNITY
Any State or area or political subdivision thereof which has authority to adopt and enforce floodplain management regulations for the areas within its jurisdiction.
DEVELOPMENT
Any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, levees, levee systems, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials.
ELEVATED BUILDING
For insurance purposes, a non-basement building which has its lowest elevated floor raised above ground level by foundation walls, shear walls, posts, piers, pilings or columns.
ELIGIBLE COMMUNITY or PARTICIPATING COMMUNITY
A community for which the Administrator has authorized the sale of flood insurance under the National Flood Insurance Program (NFIP).
EXISTING CONSTRUCTION
For the purposes of determining rates, structures for which the start of construction commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs effective before that date. "Existing construction" may also be referred to as "existing structures."
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community.
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
FLOOD or FLOODING
A general and temporary condition of partial or complete inundation of normally dry land areas from:
1. 
The overflow of inland and/or tidal waters;
2. 
The unusual and rapid accumulation or runoff of surface waters from any source.
FLOOD BOUNDARY AND FLOODWAY MAP (FBFM)
An official map of a community on which the Administrator has delineated both special flood hazard areas and the designated regulatory floodway.
FLOOD ELEVATION DETERMINATION
A determination by the Administrator of the water surface elevations of the base flood, that is, the flood level that has a one-percent or greater chance of occurrence in any given year.
FLOOD ELEVATION STUDY
An examination, evaluation and determination of flood hazards.
FLOOD FRINGE
The area outside the floodway encroachment lines, but still subject to inundation by the regulatory flood.
FLOOD HAZARD BOUNDARY MAP (FHBM)
An official map of a community, issued by the Administrator, where the boundaries of the flood areas having special flood hazards have been designated as (unnumbered or numbered) A Zones.
FLOOD INSURANCE RATE MAP (FIRM)
An official map of a community on which the Administrator has delineated both the special flood hazard areas and the risk premium zones applicable to the community.
FLOOD INSURANCE STUDY (FIS)
An examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations.
FLOODPLAIN or FLOOD-PRONE AREA
Any land area susceptible to being inundated by water from any source. (See "flooding.")
FLOODPLAIN MANAGEMENT
The operation of an overall program of corrective and preventive measures for reducing flood damage including, but not limited to, emergency preparedness plans, flood control works and floodplain management regulations.
FLOODPLAIN MANAGEMENT REGULATIONS
Zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as floodplain and grading ordinances) and other applications of police power. The term describes such state or local regulations, in any combination thereof, that provide standards for the purpose of flood damage prevention and reduction.
FLOODPROOFING
Any combination of structural and nonstructural additions, changes or adjustments to structures that reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, or structures and their contents.
FLOODWAY or REGULATORY FLOODWAY
The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one (1) foot.
FLOODWAY ENCROACHMENT LINES
The lines marking the limits of floodways on Federal, State and local floodplain maps.
FREEBOARD
A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. Freeboard tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as bridge openings and the hydrological effect of urbanization of the watershed.
FUNCTIONALLY DEPENDENT USE
A use that cannot perform its intended purpose unless it is located or carried out in close proximity to water. This term includes only docking facilities and facilities that are necessary for the loading and unloading of cargo or passengers, but does not include long-term storage or related manufacturing facilities.
HIGHEST ADJACENT GRADE
The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
HISTORIC STRUCTURE
Any structure that is:
1. 
Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
2. 
Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
3. 
Individually listed on a State inventory of historic places in States with historic preservation programs which have been approved by the Secretary of the Interior; or
4. 
Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either:
a. 
By an approved State program as determined by the Secretary of the Interior; or
b. 
Directly by the Secretary of the Interior in States without approved programs.
LOWEST FLOOR
The lowest floor of the lowest enclosed area, including basement. An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage, in an area other than a basement area, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable floodproofing design requirements of this Chapter.
MANUFACTURED HOME
A structure, transportable in one (1) or more sections, that is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term "manufactured home" does not include a recreational vehicle.
MANUFACTURED HOME PARK OR SUBDIVISION
A parcel (or contiguous parcels) of land divided into two (2) or more manufactured home lots for rent or sale.
MAP
The Flood Hazard Boundary Map (FHBM), Flood Insurance Rate Map (FIRM) or the Flood Boundary and Floodway Map (FBFM) for a community issued by the Federal Emergency Management Agency (FEMA).
MARKET VALUE or FAIR MARKET VALUE
An estimate of what is fair, economic, just and equitable value under normal local market conditions.
MEAN SEA LEVEL
For purposes of the National Flood Insurance Program (NFIP), the National Geodetic Vertical Datum (NGVD) of 1929 or other datum to which base flood elevations shown on a community's Flood Insurance Rate Map (FIRM) are referenced.
NEW CONSTRUCTION
For the purposes of determining insurance rates, structures for which the start of construction commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the start of construction commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.
NEW MANUFACTURED HOME PARK OR SUBDIVISION
A manufactured home park or subdivision for which the construction of facilities for servicing the lot on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by the community.
NFIP
The National Flood Insurance Program.
ONE-HUNDRED-YEAR FLOOD
See "base flood."
PARTICIPATING COMMUNITY
Also known as an "eligible community"; means a community in which the Administrator has authorized the sale of flood insurance.
PERSON
Any individual or group of individuals, corporation, partnership, association or any other entity, including Federal, State and local governments and agencies.
PRINCIPALLY ABOVE GROUND
At least fifty-one percent (51%) of the actual cash value of the structure, less land value, is above ground.
RECREATIONAL VEHICLE
A vehicle which is:
1. 
Built on a single chassis;
2. 
Four hundred (400) square feet or less when measured at the largest horizontal projections;
3. 
Designed to be self-propelled or permanently towable by a light-duty truck; and
4. 
Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel or seasonal use.
REMEDY A VIOLATION
To bring the structure or other development into compliance with Federal, State or local floodplain management regulations or, if this is not possible, to reduce the impacts of its noncompliance.
REPETITIVE LOSS
Flood-related damages sustained by a structure on two separate occasions during a ten-year period for which the cost of repairs at the time of each such flood event equals or exceeds twenty-five percent (25%) of the market value of the structure before the damage occurred.
RISK PREMIUM RATES
Those rates established by the Administrator pursuant to individual community studies and investigations which are undertaken to provide flood insurance in accordance with Section 1307 of the National Flood Disaster Protection Act of 1973 and the accepted actuarial principles. Risk premium rates include provisions for operating costs and allowances.
SPECIAL FLOOD HAZARD AREA
See "area of special flood hazard."
SPECIAL HAZARD AREA
An area having special flood hazards and shown on an FHBM, FIRM or FBFM as Zones (unnumbered or numbered) A and AE.
START OF CONSTRUCTION
Includes substantial improvements and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement or other improvements were within one hundred eighty (180) days of the permit date. The "actual start" means either the first placement of permanent construction of a structure on a site, such as the pouring of slabs or footings, the installation of piles, the construction of columns, any work beyond the stage of excavation, or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling, the installation of streets and/or walkways, excavation for a basement, footings, piers, foundations, the erection of temporary forms, nor installation on the property of accessory structures, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the "actual start of construction" means the first alteration of any wall, ceiling, floor or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
STATE COORDINATING AGENCY
That agency of the State Government or other office designated by the Governor of the State or by State Statute at the request of the Administrator to assist in the implementation of the National Flood Insurance Program (NFIP) in that State.
STRUCTURE
For floodplain management purposes, a walled and roofed building including a gas or liquid storage tank that is principally above ground, as well as a manufactured home. "Structure," for insurance purposes, means a walled and roofed building other than a gas or liquid storage tank that is principally above ground and affixed to a permanent site, as well as a manufactured home on a permanent foundation. For the latter purpose, the term includes a building while in the course of construction, alteration or repair but does not include building materials or supplies intended for use in such construction, alteration or repair, unless such materials or supplies are within an enclosed building on the premises.
SUBSTANTIAL DAMAGE
Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred. The term includes repetitive loss buildings (see definition).
1. 
For the purposes of this definition, repair is considered to occur when the first repair or reconstruction of any wall, ceiling, floor, or other structural part of the building commences.
2. 
The term does not apply to:
a. 
Any project for improvement of a building required to comply with existing health, sanitary, or safety code specifications which have been identified by the Code Enforcement Official and which are solely necessary to assure safe living conditions; or
b. 
Any alteration of an historic structure, provided that the alteration will not preclude the structure’s continued designation as an historic structure; or
c. 
Any improvement to a building.
SUBSTANTIAL IMPROVEMENT
Any combination of reconstruction, alteration, or improvement to a building, taking place during a ten-year period, in which the cumulative percentage of improvement equals or exceeds fifty percent (50%) of the current market value of the building. For the purposes of this definition, an improvement occurs when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building. This term includes structures which have incurred repetitive loss or substantial damage, regardless of the actual repair work done. The term does not apply to:
1. 
Any project for improvement of a building required to comply with existing health, sanitary, or safety code specifications which have been identified by the Code Enforcement Official and which are solely necessary to assure safe living conditions; or
2. 
Any alteration of an historic structure, provided that the alteration will not preclude the structure's continued designation as an historic structure; or
3. 
Any building that has been damaged from any source or is categorized as repetitive loss.
SUBSTANTIALLY IMPROVED EXISTING MANUFACTURED HOME PARKS OR SUBDIVISIONS
Where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds fifty percent (50%) of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
VARIANCE
A grant of relief by the community from the terms of a floodplain management regulation. Flood insurance requirements remain in place for any varied use or structure and cannot be varied by the community.
VIOLATION
The failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications or other evidence of compliance required by this Chapter is presumed to be in violation until such time as that documentation is provided.
WATER SURFACE ELEVATION
The height in relation to the National Geodetic Vertical Datum (NGVD) of 1929 (or other datum where specified) of floods of various magnitudes and frequencies in the floodplain.