A. 
The Township may inspect all phases of the installation of the best management practices (BMPs) and/or stormwater management facilities as deemed appropriate by the Township.
B. 
During any stage of the work, if the Township determines that the BMPs and/or stormwater management (SWM) facilities are not being installed in accordance with the approved SWM plan, the Township may suspend or revoke, in whole or in part, any existing permits or other approvals and issue a cease and desist order until a revised SWM site plan is submitted and approved, as specified in this chapter, and until the deficiencies are corrected.
C. 
A final inspection of all BMPs and/or SWM facilities may be conducted by the Township to confirm compliance with the approved stormwater management site plan prior to the issuance of any occupancy permit.
D. 
The developer shall be responsible for providing as-built plans of all SWM BMPs included in the approved SWM site plan. The as-built plans and an explanation of any discrepancies, which were reviewed and received approval by the Township, shall be submitted to the Township.
E. 
The as-built submission shall include a certification of completion signed and sealed by a qualified professional verifying that all permanent SWM BMPs have been constructed according to the approved plans and specifications. If any licensed qualified persons contributed to the construction plans, they must sign and seal the completion certificate.
F. 
Final plans based upon the as-builts (record drawings) must be received by the Township prior to the issuance of the certificate of occupancy.