[HISTORY: Adopted by the Town Board of the Town of Cobleskill 11-10-2014 by L.L. No.
6-2014.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Flood damage prevention — See Ch. 81.
Sewers — See Ch. 109
Streets and sidewalks — See Ch. 116.
Subdivision of land — See Ch. 120.
Zoning — See Ch. 140.
[1]
Editor’s Note: This local law was amended 11-13-2018
by L.L. No. 3-2018, solely for the purpose of extending the date by
which the Town Clerk is directed to file the statement of unpaid charges
until November 1.
A.
Statutory authority. The Town Board of the Town of Cobleskill, in
the County of Schoharie and the State of New York, under authority
of Article 16 of the Town Law and the Municipal Home Rule Law of the
State of New York, hereby ordains, enacts and publishes the following.
B.
Purpose and intent; intermunicipal agreement with Village. The Village
and Town of Cobleskill have entered into an intermunicipal agreement
which stipulates among other things that the Village will oversee
day-to-day operations, maintenance and administrative matters of the
Town Water District and future extensions, in order to assure a safe,
reliable source of water for those residents and businesses located
within district boundaries. This chapter supplements the existing
Village of Cobleskill Code Chapter 154, Water.[1]
[1]
Editor's Note: A copy of the Village Water Code Ch. 154 is included as an attachment to this chapter. Note also that any references in the Index of this Code that refer to sections in Ch. 154 refer to the chapter from the Village Code attached to this Ch. 134.
C.
This chapter shall apply to all areas contained within the boundaries
of the Water District, Town of Cobleskill, Schoharie County, New York.
The rules and regulations contained herein shall be equally applicable
to all outside users, except to the extent that any provision of this
document is specifically altered or amended by the outside user agreement.
D.
No water mains, water services, or appurtenances shall be installed
within the district except in conformance with these standards, except
as specifically herein provided. The following specifications apply
to all water mains and services installed on public or private property
that are connected or intended to be connected directly or indirectly
to the Town of Cobleskill Water District System. All plans and specifications
for such water mains and appurtenances shall be reviewed and approved
in writing by the Village of Cobleskill prior to construction.
A.
ANSI
AWWA
CONTRACTOR
DESIGNATED REPRESENTATIVE
ENGINEER
OWNER
TOWN
TOWN ENGINEER
WATER MAIN
WATER SERVICES
As used in this chapter, the following words are defined:
American National Standards Institute.
American Water Works Association.
The party who is employed by the owner to actually construct
the water distribution system.
The Town Board as Commissioner of the District, can designate,
as its representative, the Village of Cobleskill Water Department
to carry out the day-to-day operations of the district.
The licensed engineer, architect or surveyor who is employed
by the owner to design the water distribution system and review material
submittals.
The party, such as a developer, who initiates and installs
the water distribution system. In the case of water services, the
"owner" shall mean the applicant who applies for water service.
The Town of Cobleskill Water District, Town of Cobleskill,
New York. Whenever the words "ordered," "directed," "required," "approved,"
or "accepted" or variations thereof are used, they shall refer to
action by the Town Board, the Town Engineer, or their designated representative(s),
unless otherwise specified.
The party retained by the Town to review plans and observe
the installation of water mains built by an owner and his contractor.
Shall generally mean pipe six inches diameter or larger supplying
water as part of a system to one or more buildings.
Shall generally mean pipe smaller than six inches in diameter
supplying water to one or more buildings.
B.
When ANSI or AWWA standards are referenced to in these standards,
the date of the standard shall be that in effect at the time of plan
approval by the Water District.
A.
Written application required.
(1)
Any property owner within the boundaries of the Water District wishing
to obtain water from the district should contact the Village Clerk's
office to obtain an application for service. The application should
be completed by the applicant and returned with the required deposit.
No person shall use water without approval of the district. The Village
will issue the water permits necessary for hookup between the curb
stop and the real property, including the supply of meters, and inspection
services for the installation of this equipment.
(2)
A property that is partially within and partially outside the boundaries
of the Water District is considered an inside user candidate for water
if that portion of the property which fronts on a street, road, or
avenue is within the district and service connection is being made
at a point on the main that is within the district and provided that
the property has been included on the Water District rolls and paying
water charges on the property.
B.
Examination of premises. The approval of applications for service
is subject to an inspection of the premises by the designated representative
of the Water District to verify information contained therein.
C.
Applications not accepted from applicants or premises in arrears.
No agreement will be entered into by the district with any applicant
for water service until all arrears and charges due from the applicant
to the district for service at any premises now or heretofore owned
or occupied by him in the territory supplied by the district, including
all outside users, shall have been paid in full. The same provisions
shall apply with the respect to any premises against which any charges
are in arrears.
A.
General.
(1)
All water main, services and appurtenances within the public right-of-way
are the property of the district after installation, and the district
will be responsible for maintenance of these facilities.
(2)
The Village water tap permit fee for existing residential units in the Town Water District shall not be required to pay the Village water tap permit fee. Existing residential units in the Town Water District shall be required to pay the water meter and body permit fee at the Village cost, or as stipulated in the Village of Cobleskill fee schedule. Should a residential unit convert to a commercial unit, then a connection fee, at the-then Village connection cost, shall be assessed and paid by the commercial unit as set forth in § 134-14 of these regulations. Notwithstanding the foregoing, commercial units shall be charged a water tap permit fee and water meter and body fee as stipulated in the current Village of Cobleskill fee schedule. The water tap permit fee shall be waived for commercial units that obtain their permit and make the connection within 18 months of the Town Water District start-up. It is mandatory for commercial units to connect into the Town Water District within two years of start-up. Conversion of vacant property to an improved use, whether residential or commercial, shall require the payment of the connection fee at the-then Village connection fee if the improvement occurs after the Town Water District is created and operating.
(3)
Property owners within the district that desire to connect after the initial construction shall be responsible for all costs of the service installation, in addition to the connection (only after 18 months) and meter fees listed in § 134-14.
(4)
A separate application must be made and a separate service installed
for each premises.
(5)
The word "premises" as used herein shall be restricted to the following:
(a)
A building under one roof and occupied as one residence or place
of business; or
(b)
A combination of buildings in one common enclosure occupied
by one family as a residence or one corporation or one firm as a place
of business; or
(c)
Each unit of a multiple house or building separated by a solid
vertical partition wall occupied by one family as a residence or one
corporation or one firm as a place of business, or occupied by more
than one family; or
(d)
A building having a number of apartments, offices, or lofts
which are rented to tenants using in common one hall and one or more
means of entrance; or
(e)
A building two or more stories high under one roof and having
an individual entrance for the ground floor occupants and one for
the occupants of the upper floors; or
(f)
A combination of buildings, such as a garden-type apartment,
in one common enclosure, none of the individual buildings of which
is adapted to separate ownership; or
(g)
A public building; or
(h)
A single plot such as a park or playground; or
(i)
A farm including the residence of the family operating the farm,
but excluding other residences, if any, on said farm; or
(j)
A building or a living unit in a building that is owned as a
condominium or as a cooperative.
B.
Service pipe materials. For sizes up to two inches, the service pipe
shall be copper tubing type "K" manufactured in accordance with ASTM
Specification B-88 or High-density polyethylene (HDPE 3608, CTS) potable
water tubing, manufactured in accordance with AWWA C901 and ASTM D2737.
The service pipe shall have a minimum diameter of one inch. For services
two inches or larger in diameter, HDPE, copper, ductile iron, or other
pipe of strength and quality approved by the district shall be used.
If using polyethylene pipe, tracer wire must be installed beside pipe
prior to placing bedding material. If using polyethylene pipe, insert
stiffeners must be used at all connections as recommended by manufacturer.
Polyethylene pipe must have a minimum 200 PSI rating (SDR 9).
(1)
Water services one inch through two inches in diameter shall be installed
on public property or right-of-way by the contractor, extending from
the water main to the property or right-of-way line.
(a)
Water services of one inch through two inches shall be connected
to the main through the use of service clamps or tapped tees in accordance
with manufacturer's recommendation.
(b)
Methods used for service connections to existing mains in the
water system shall be approved in advance by the Village.
(2)
Water services larger than two inches in diameter in any location
shall be furnished and installed by the owner completely at the owner's
own expense.
(a)
The complete larger than two-inch water service shall generally consist of a main line tee or tapping sleeve (Mueller H-615) and valve, ductile iron service pipe or PVC C-900 and fittings and standard gate valve and valve box. Such ductile iron service pipe and fitting shall meet the same specifications as given previously in § 134-3 for the main line pipe and fittings, and shall be installed in a trench that provides at least five feet of cover or more over the barrel of the pipe, all as measured from finished grade.
(b)
The standard gate valve and valve box shall be located on the property or right-of-way line or where required by the Village. The gate valve and valve box shall meet the same specifications as given previously in § 134-4 for main line valves and valve boxes.
(c)
The exact configuration of these water services larger than
two inches in diameter shall be reviewed and approved by the Village
prior to their construction.
(3)
The portion of a water service of any size on private property shall
be furnished and installed by the owner completely at his own expense.
All such services shall meet all the same material and installation
details as given in these specifications for other water services.
Installation details shall be reviewed and approved before the service
is installed.
(4)
Copper service pipe.
(a)
Copper service pipe shall have the following dimensions and
weights:
Nominal Pipe Size
(inches)
|
Outside Diameter
(inches)
|
Weight per Foot
(pounds)
| |
---|---|---|---|
1
|
1.125
|
0.839
| |
1 1/4
|
1.375
|
1.100
| |
1 1/2
|
1.626
|
1.360
| |
2
|
2.125
|
2.060
|
(b)
Fittings for one-inch copper service pipe shall have compression
connections. Three-part unions for copper-to-copper shall be Mueller
H-15403 or approved equal. Other fittings as required shall be Mueller
items of the same series or approved equal.
[1]
Fittings for one-and-one-half-inch and two-inch copper service
pipe shall have compression-type connections. Three-part unions for
copper-to-copper shall be Mueller H-15403 110 compression connections
or approved equal. Other fittings as required shall be Mueller items
of the same series or approved equal.
[2]
No soldered joints shall be permitted in copper underground
and no red or white lead or joint compound shall be used on joints
between the meter and the main.
(5)
High-density polyethylene pipe (SDR 9) 200 psi. HDPE service pipe
shall have the following dimensions and weights:
Nominal Pipe Size
(inches)
|
Outside Diameter
(inches)
|
Minimum Wall Thickness
(inches)
| |
---|---|---|---|
1
|
1.125
|
0.125
| |
1 1/4
|
1.375
|
0.153
| |
1 1/2
|
1.626
|
0.181
| |
2
|
2.125
|
0.236
|
(a)
Plastic pipe meeting the following requirements shall be permitted
to be installed. HDPE pressure pipe and tubing meeting AWWA C901 requirements
including pressure class rating of 200 psi min (SDR 9).
(b)
Plastic pipe shall be installed in continuous lengths, with
as few intermediate joints as possible. Where it is necessary to join
two pipes, a stainless steel connector with double SS clamps shall
be used.
(c)
Fittings for one-inch HDPE service pipe shall have compression-type
connections with thaw nuts and screws for conductivity. Three-part
unions for HDPE to HDPE shall be Mueller H-15403. Other fittings as
required shall be Mueller of the same series.
(d)
Fittings for one-and-one-fourth-inch, one-and-one-half-inch
and two-inch HDPE service pipe shall have compression-type connections
with thaw nuts and screws for conductivity. Three-part unions for
HDPE to HDPE shall be Mueller H-15403 110 compression connections.
Other fittings as required shall be Mueller of the same series.
(6)
Services shall be installed to conform to:
(a)
The rules and regulations of the Water District.
(b)
In the event of any ambiguity in the specifications, an interpretation
of the designated representative shall be obtained by the applicant,
and his decision shall be final and conclusive, subject to the rights
inherent in the Town Board to review the action of the designated
representative or promulgate such further rules and regulations as
they deem to be in the interest of the district.
C.
Minimum depth of service pipes. Minimum depth of service pipes from
main to premises shall be five feet below the surface of the ground,
and in no case shall a service pipe be permitted to be laid in the
same trench with a gas, steam, electrical or other conduit.
D.
Installation of services to the property line.
(1)
Upon receipt and approval of the permit application for a service,
the owner will contact the designated representative to schedule necessary
inspections with the homeowner/contractor.
(2)
The applicant shall be responsible for all cost required to establish
service to his/her premises from the main, including the meter and
tapping the main, if a service line has not already been provided.
After the installation is complete, the district will assume ownership
of the portion of the service from the main to the upstream side of
the curb stop and be responsible for maintenance of the service on
public land.
E.
Leakage from property owner's facilities. Whenever leakage occurs
on pipes and facilities owned by the property owner, the property
owner shall make the necessary repairs without delay. If the property
owner fails to make said repairs, the district reserves the right
to discontinue the supply until such time as the leak is repaired
and all costs incurred by the district are paid.
F.
Construction or blasting near gas mains. No construction or excavation
shall be done within 100 feet of any existing street, highway, or
public place in which there is a gas main unless seventy-two-hour
advance notice of such work shall have been given in writing to the
person, corporation, or municipality engaged in the distribution of
gas in such territory. The applicant for water service shall, therefore,
ascertain for himself if there are any gas mains in any street or
highway within 100 feet of his excavation or within 200 feet of any
proposed blasting and shall provide written seventy-two-hour, advance
notice in accordance with all governmental and utility regulations.
The district bears no responsibility or liability for any failure
on the part of an applicant or the contractor to fully comply with
the foregoing terms.
G.
Installation of water services beyond the property line. Installation
of services from the property line to the residence or establishment
shall be made in accordance with the above standards and Village of
Cobleskill Code Chapter 154, Water.[1] It will be the responsibility of the user to obtain a
contractor and have this work performed at his own expense.
(1)
No work shall be performed by the applicant or his contractor within
the limits of any street, avenue, road or right-of-way used for highway
purposes without first obtaining the approval and necessary permits
of the designated representative in charge of the street, avenue,
road or right-of-way.
(2)
The applicant shall notify the designated representative and obtain
approval of the installation before backfilling any trenches. No attachment
to the water service shall be made between the main and the water
meter.
[1]
Editor's Note: A copy of the Village Water Code Ch. 154 is included as an attachment to this chapter. Note also that any references in the Index of this Code that refer to sections in Ch. 154 refer to the chapter from the Village Code attached to this Ch. 134.
H.
Corporation stops, curb stops and boxes. All corporation stops, curb
stops and boxes used in any service connection will be manufactured
by Mueller unless otherwise approved by the designated representative.
I.
Corporation stops.
(1)
One-inch corporation stops shall have compression connections, and
shall be Mueller H-15008 or approved equal, both with AWWA inlet threads
for copper services and Mueller B-2500807 or McDonald 4701BQA for
HDPE services.
(2)
One-and-one-half-inch and two-inch corporation stops shall have compression
connections, and shall be Mueller H-15013 with Mueller H-15071 for
copper services and Mueller B-2500807 or McDonald 4701BQA for HDPE
services 110 compression connection straight coupling attached, or
approved equal with integral outlet connection. Both corporation stops
have AWWA inlet threads.
(3)
When tapped tees are used that have iron pipe thread taps, Mueller
H-15025 or approved equal corporation stops with iron pipe inlet threads
may be used for one-inch size. For one-and-one-half-inch and two-inch
sizes, Mueller H-15025 corporation stops with iron pipe inlet threads
with Mueller H-15071 110 compression connection straight couplings
attached may be used or approved equal.
(4)
Whether tapped in or used with tapped tees, corporation stops shall
be installed tilted up at about 15° from horizontal so that a
partial loop can be formed in the copper service pipe to allow for
possible differential movement of the service pipe and main. A minimum
of 4 1/2 feet of cover below finished grade shall be maintained
over the top of the partial loop in the copper service pipe.
(5)
Multiple corporation stops for use with branch connections shall
be installed in accordance with AWWA Standards and as approved by
the designated representative.
(6)
Corporation stop taps larger than the maximum tap size allowable
in the main shall not be made. AWWA and DIPRA (Ductile Iron Pipe Research
Association) recommendations shall be followed. Consideration shall
be given to minimum pipe wall thickness required for each tap size
to insure a serviceable threaded connection. Service conditions should
indicate the extent of full-thread engagement necessary. As a guide,
tap size should be limited so that at least three full threads of
the corporation stop are engaged in the pipe wall for ductile iron
pipe.
(7)
A double strap, nylon-coated iron tapping saddle rated for 150 psi
minimum by Smith Blair Model No. 317 or otherwise approved by the
Town Engineer shall be used on PVC mains and when the maximum tap
size is exceeded on DIP.
J.
Branch connections. Any and all branch connections, which may be
necessary to supply adequate water supply to large-than-normal house
connections will be approved by the engineer individually as their
need arises.
K.
Curb stops and boxes.
(1)
Curb stops for one-inch through two-inch copper service pipe shall
be full port ball type, tee handle non-draining curb stops Mueller
H-15209 Mark II Oriseal or approved equal. The curb stops shall be
set on a solid concrete block. Curb boxes for these curb stops shall
be of the extension type with a stationary rod and arch pattern base
suitable for a five-foot deep trench and having a one-inch inside
diameter upper section. Curb boxes shall be with foot piece as manufactured
by Mueller H-10314, or approved equal, 5 1/2 feet extended length
telescoping 4 1/2 feet, with matching stationary rods and lids.
Mueller Curb B25172 is a compression (main side) female iron pipe
(house side) stop which when combined with a service fitting at the
curb stop will allow connection to be different sizes and types of
existing service piping.
(2)
When either these Mueller or approved equal curb boxes for one-inch
services are installed in concrete or paved surfaces, cast-iron curb
box sleeves shall be installed to allow freedom of movement of the
ground key lid. Curb box sleeves shall be Mueller H-10342 or approved
equal.
L.
Service pipe sizing.
(1)
As a general rule of thumb, the following table can be considered
a guide in the selection of service pipe size.
Pipe Size
(inches)
|
Service Length
(feet)
| |
---|---|---|
1
|
1 to 150
| |
1 1/4
|
150 to 300
| |
1 1/2
|
300 to 500
| |
2
|
500 to 1,000
| |
Consult engineer
|
>1,000
|
(2)
Other factors such as building elevation and static pressure in the
main affect pipe sizing and should be factored into the sizing calculations.
M.
Service trench backfill.
(1)
Bedding sand shall consist of soil materials with a maximum size
of 1/2 inch, more than 50% passing the No. 4 sieve and less than 10%
passing the No. 200 sieve.
(2)
Compaction: Bedding sand shall form a complete envelope around the
service pipe, six-inch minimum on bottom and sides and twelve-inch
minimum on top. A vibratory plate compactor or other approved method
shall be used to compact this material with a minimum of five passes
per lift.
A.
In addition to the various miscellaneous installation requirements
given in preceding sections of this specification, all water distribution
system installation shall be done in accordance with AWWA Standard
C600-64 and accordance with the material manufacturer's recommendations.
Also, all work shall be done in accordance with the requirements of
the Water District. The owner's contractor shall be responsible
to contact underground utility companies prior to any digging.
B.
Trenches shall be open cut from the surface deep enough to provide
a minimum of five feet of cover over the barrel of the pipe from finished
grade. Trenches should be wide enough to provide at least six inches
of clearance on each side of the bell of the pipe. The maximum trench
width at the top of the pipe shall be no greater than the nominal
pipe size or diameter plus 24 inches.
C.
All pipe and fittings shall be laid on good foundations trimmed to
shape and, where required, secured against settlement, all in a manner
to provide full support for the entire length of pipe. Sufficient
selected bedding and backfill shall be placed or other precautions
taken to prevent flotation, movement, or damage to the pipe, fittings
and coating.
D.
Standard pipe installation in trench in earth shall conform to AWWA
Laying Condition B with the pipe laid on a flat or slightly shaped
natural trench bottom. Excavation to grade shall be in accordance
with Section 6.5 of AWWA Standard C600-64. Backfilling shall be in
accordance with Section 14 of AWWA Standard C690-64 using satisfactory
excavated material, or sand, gravel or other special trench backfill
as required by the engineer. The backfill shall be brought by hand
or approved mechanical means to a depth of one foot over the pipe
to provide a cushion and prevent movement and damage to the pipe during
subsequent backfilling with equipment. The trench must also be mechanically
tamped.
E.
Alternate pipe installation in trench in earth, when ordered by the
engineer shall conform to appropriate AWWA laying conditions with
the pipe laid in tamped and shaped select bedding material. This installation
method shall be used to secure better support for the pipe and/or
to replace unstable trench bottoms with sound material. Excavation
below grade and bedding shall be in accordance with Sections 6.6 and
6.7 of AWWA Standard C600-64. Select bedding material shall consist
of compacted crushed stone or sand depending on conditions. Backfilling
shall be the same as given above for the standard trench in earth.
F.
Standard pipe installation in trench in rock shall conform to appropriate
AWWA laying conditions with the pipe laid in tamped and shaped select
bedding material. Rock excavation below grade and bedding shall be
in accordance with Section 6.9 of AWWA Standard C600-64. Ledge rock,
boulders and large stones shall be removed to provide a clearance
of at least six inches below and on each side of all pipe, valves,
and fittings. Such excavated rock shall be replaced with select compacted
bedding material, generally sand or crushed stone, as required by
the engineer or Water District representative. Backfilling shall be
the same as given above for trenches in earth.
G.
All trench excavation and any required sheeting and shoring shall
be done in accordance with the latest revisions of the following codes:
Subpart 23-4 "Excavation Operations" of the New York State Department
of Labor Industrial Code Rule 23 and Subpart P, "Excavations. Trenching
and Shoring" of the United States Department of Labor OSHA Regulations
for Construction. The more stringent requirement in each code or other
applicable codes shall apply.
H.
Proper and suitable tools and equipment for convenient and proper
handling and laying of pipe and fittings shall be used. Great care
shall be taken to prevent entrance of dirt or foreign matter into
the pipe and to prevent damage of pipe lining and coating. Open ends
of pipes shall be kept plugged or bulk headed during construction.
I.
All material shall be carefully examined for defect, and no piece
shall be laid which is known to be defective. If any defective piece
shall be discovered after having been laid, it shall be removed and
replaced with a sound piece in a satisfactory manner.
J.
In order to be accepted by the Water District, all valve boxes and
curb boxes shall be clean, shall be set squarely down on the valve
or curb stop, shall be centered and plumb over the wrench nut of the
valve or operating rod of the curb stop, and shall not be overextended.
All valves and curb stops shall be suitably marked and adequately
protected during construction.
K.
When making plain end connections with a sleeve on six-inch-or-greater
diameter pipe, ends shall butt together or a filler piece or pipe
stop shall be installed between the ends.
L.
In order to be accepted by the Village, all valve boxes and curb
boxes shall be clean, shall be set squarely down on the valve or curb
stoop, shall be centered and plumb over the wrench nut of the valve
or operating rod of the curb stop, and shall not be overextended.
All valves and curb stops shall be suitably marked and adequately
protected during construction.
M.
Water mains and service lines shall be installed at least 10 feet
horizontally from any existing or proposed sanitary sewer or septic
system. The distance shall be measured from edge to edge. In cases
where it is not practical to maintain a ten-foot separation, the water
main may be installed closer to the sanitary sewer, provided that
the water main is laid in a separate trench or on an undisturbed earth
shelf located on one side of the sanitary sewer at such an elevation
that the bottom of the water main is at least 18 inches above the
top of the sanitary sewer. Water mains crossing sanitary sewers shall
be installed to provide a minimum vertical distance of 18 inches between
the outside of the water main and the outside of the sanitary sewer.
This shall apply whether the water main crosses above or below the
sanitary sewer. For all crossings, one full length of water main pipe
shall be located so that each joint shall be as far away as possible
from the sanitary sewer. Special structural support of the water main
and sanitary sewer may be required as conditions dictate.
N.
In order to control dust conditions during the water main construction,
the contractor shall furnish and apply either water or calcium chloride.
When water is used on streets or roads, it shall be applied uniformly
with a pressure distributor spray bar or by other approved equipment.
When water is used on areas that shall be sodded or seeded later,
it shall be free from acids, oils, salts, or any other substances
injurious to plant growth. Calcium chloride shall be in accordance
with ASTM Standard D98 and shall be delivered in unopened, waterproof
bags. It shall be applied uniformly after the surface has been thoroughly
watered as specified above.
O.
All plugs, caps, tees, bends and other fittings shall be provided
with concrete thrust blocking to resist test pressures or shall be
prevented from moving by using suitable metal rods or clamps. All
concrete to be 3,000 psi and shall be placed around the fittings to
completely fill the space between the fittings and the undisturbed
walls of the trench. Concrete shall not overlap any joint and shall
be placed so as not to interfere with removing or installing any of
the jointing hardware. Other means of thrust restraint utilizing anchoring
fittings and retainer glands may be used where appropriate and approved
by the designated representative.
P.
Pipelines constructed of ductile iron pipe and fittings shall be
protected from external corrosion, where applicable, through the use
of polyethylene encasement. Polyethylene encasement shall be used
whenever its use is so indicated through testing procedures developed
by the Ductile Iron Pipe Research Association. The owner shall be
required to prove to the Village that the polyethylene encasement
is not required whenever the installation of pipelines is contemplated.
Q.
Connections to existing systems shall be reviewed and considered
on an individual basis with the Village. In general, connections shall
be made with a minimum of, or no disruption to, water service in the
existing system.
R.
At times when pipe laying is not actually in progress, the open ends
of the pipes shall be closed temporarily with pipe plugs or by other
means. If water is in the trench when work is resumed, the trench
shall be dewatered and the plugs shall not be removed until all danger
of water entering the pipe is past.
S.
At the conclusion of the work, the contractor shall thoroughly clean
all new pipes by flushing with water or other means to remove all
dirt, stones, pieces of wood, etc., which may have entered during
the construction periods. If, after this cleaning, any obstructions
remain, they shall be removed to the satisfaction of the engineer
and the Village. Pipes shall be flushed at a rate of 2.5 feet per
second for a duration suitable to the engineer and the Village. The
rates of flow required to produce 2.5 feet per second flushing velocity
in different sizes of pipe are as shown in the following table:
Pipe Size
(inches)
|
Flow Required to Produce 2.5 FPS Velocity
(gallons per minute)
|
Hydrant Opening Required at 40 PSI Residual
(inches)
| |
---|---|---|---|
4
|
100
|
1 to 2 1/2
| |
6
|
220
|
1 to 2 1/2
| |
8
|
390
|
1 to 2 1/2
| |
10
|
610
|
1 to 2 1/2
| |
12
|
880
|
1 to 2 1/2
|
T.
Hydrostatic testing. (Testing shall be done within 72 hours of conclusion
of installation.)
(1)
Hydrostatic acceptance tests, consisting of a pressure test and a
leakage test, shall be performed on all sections of all water systems
installed after the trench has been backfilled. Hydrostatic presumptive
tests may be performed when the system is partially backfilled to
simply check the work, but acceptance of the system after it is completely
backfilled. All hydrostatic tests shall be performed in accordance
with Section 4 of ANSI/AWWA C600, latest version.
(2)
For the pressure test, the system shall be pressure tested by pressurizing
to a minimum of 150 pounds per square inch, based on the elevation
of the lowest point in the section under test and corrected to the
elevation of the gauge. Provisions shall be made to relieve air trapped
at high points in the system through adjacent hydrants or through
taps and corporation stops installed for this purpose by the contractor.
After this pressure has been maintained successfully, with further
pumping as required, for a period of at least one hour, the section
under test shall be considered to have passed the pressure test and
leakage tests shall then be performed.
(3)
Leakage tests shall be performed under a minimum test pressure of
150 pounds per square inch, based on the elevation of the lowest point
of the section under test and corrected to the elevation of the gauge.
The test section should be limited to a maximum length of about 2,000
feet. The leakage test duration shall be a minimum of two hours after
the leakage rate has stabilized.
(4)
The maximum allowable leakage for a two-hour test per 1,000 feet
length of different sizes and nominal laying lengths of pipe shall
be as shown in the following table:
Pipe Size
(inches)
|
Allowable Leakage at 150 PSI
(gallons per two hours per 1,000 feet of pipe)
| |
---|---|---|
3
|
0.56
| |
4
|
0.74
| |
6
|
1.10
| |
8
|
1.48
| |
10
|
1.84
| |
12
|
2.20
|
U.
All water for tests shall be furnished and disposed of by the contractor
at his own expense. Source and/or quality of the water, which the
contractor proposed to use in testing the lines shall be acceptable
to the engineer and the Village.
V.
Sterilization.
(1)
All pipes and fittings connected to and forming a portion of a potable
water supply shall be sterilized and flushed in a manner acceptable
to the Town Engineer. Sterilization shall be accomplished after the
pipe has passed the pressure and leakage tests.
(2)
Sterilization shall be performed in accordance with ANSI/AWWA C656
(excluding Section 5.1 covering the tablet method). Sterilization
shall be accomplished by applying a chlorine solution that will give
a 50 ppm chlorine residual throughout the main being disinfected.
The chlorine solution shall remain in the water mains for a minimum
period of 24 hours. At the termination of this period, the chlorine
residual shall be a minimum of 25 ppm. If the residual is less than
25 ppm, the entire procedure shall be repeated. The chlorine solution
shall be thoroughly flushed out prior to placing the new section of
the main in service. The chlorine solution shall be disposed of in
a manner that will in no detrimental way affect fish, plant, or animal
life.
(3)
After the water mains have been flushed with potable water to the
satisfaction of the engineer, the Village samples of water from the
mains shall be taken by the owner for bacteriological analysis.
(4)
The number of samples and their collection points shall be reviewed
with and be acceptable to the Village. Also, the testing laboratory
that will do the bacteriological analysis shall be as designated by
the Village. The water samples shall test bacteriologically safe before
the water mains are placed in service.
W.
Time of construction. Unless specifically approved by the Town in
writing, no water distribution system installation and construction
shall take place during the winter months from November 1 through
April 1.
X.
Record map and certification.
(1)
At the conclusion of the water system installation, the engineer
shall prepare detailed record maps of the completed water distribution
system. These record maps shall be of a form acceptable to the Village.
The Engineer shall furnish at least three complete sets of twenty-two-inch-by-thirty-four-inch
prints of these record drawings to the Village.
(2)
A water service location sheet shall be filled out with all pertinent
information for each service installed. This form is available at
the Village Clerk's office.
(3)
Also at the conclusion of the water system installation, the engineer
is required to furnish to the Village an engineer's certification
stating that the water system is complete and was installed in accordance
with the previously submitted and approved plans and specifications.
The Village will submit a copy of the engineer's certification
and a copy of the laboratory bacteriological analysis to the regional
office of the New York State Department of Health.
(4)
As an alternate, the Village may have the Village's Engineer
observe construction and prepare record maps, at the owner's
cost.
Y.
Water District control.
(1)
Installation and construction of all water mains and services installed
in public or private property that are connected directly or indirectly
to the Town system shall be subject to the control of the Village.
(2)
Operation of all valves and hydrants under pressure shall be done
only by representatives of the Village or by such responsible person
approved by the Village.
(3)
The Village shall be notified at least 24 hours prior to the start
of making connections to the existing systems. Also, the Village shall
be notified at least 24 hours prior to the start of pressure testing,
leakage testing and sterilization.
(4)
The Village will not authorize any meter installations, in any subdivision,
prior to receipt and approval of record drawings and certifications.
(5)
Fire Department personnel may operate hydrants in emergency situations,
during drills and during training exercises. The Authority shall be
notified 48 hours in advance of all nonemergency use and as soon as
possible when hydrants are used in an emergency.
Z.
Fees for review and construction observation. The owner shall be
responsible for all costs associated with plan review and construction
observation by the Town's Engineer.
AA.
Materials.
(1)
Water mains and fittings.
(a)
All pipe for water mains six inches through 24 inches in diameter
shall be ductile iron pipe (DIP), Class 52, AWWA C151 or Polyvinyl
Chloride (PVC), AWWA C-900, DR 18. HDPE, SDR-11 DIPS, AWWA C-906,
blues stripe, with heat-fused butt joints shall be used for directional
drilling.
(b)
All ductile iron pipe shall be centrifugally cast in metal molds
or sand-lined molds with all details of manufacture and supply in
substantial conformance with ANSI/AWWA C151/A21.51. All ductile iron
pipe shall be designed and selected in accordance with ANSI/AWWA C150/A21.50.
All ductile iron pipe up through 12 inches in diameter shall be minimum
pipe wall thickness Class 52 per ANSI/AWWA C150/A21.50. In other sizes,
pipe shall be designed for 250 psi working pressure.
(c)
All PVC pipe shall meet the requirements of AWWA Standard C900,
"Polyvinyl Chloride (PVC) Water Distribution Pipe." All pipe shall
be made from quality PVC resin, compounded to provide physical and
mechanical properties that equal or exceed cell class 12454 as defined
in AST M D1784. All pipe shall meet the requirements of AWWA C-900,
UL 1285, FM 1612, CAN/CSA-B137.3 and BNQ NQ3624-250 Standards, as
indicated, for potable water transmission mains and for fire protection
systems. The gasketed joint shall meet the requirements of ASTM D-3139,
and the joint gasket shall conform to ASTM F-477.
(d)
Pipelines constructed of PVC and HDPE shall include buried pipeline
location tape and tracer wire. Location tape shall be a metallic blue
plastic strip six inches wide with the following words imprinted in
large black letters in continuously repetitive elements along the
tape: "CAUTION: WATER MAIN BELOW" or a variation of those words. Tracer
wire shall be multi-strand 14 gauge stainless steel wire with a 45
mil polyethylene jacket. Splice fitting shall be noncorrosive (not
brass).
(e)
All pipe shall have push-on joints in complete conformance with
ANSI/AWWA C111/A 21.11. The pipe manufacturer shall furnish the required
rubber joint gaskets and joint lubricant.
(f)
All ductile iron pipe for hydrant connections, minimum six inches
in diameter, shall conform to the same specifications as given previously
for mainline ductile iron pipe; except that hydrant connection pipe
shall have mechanical joints in complete conformance with ANSI/AWWA
C111/A21.11. The pipe manufacturer shall furnish the required joint
accessories consisting of ductile iron retainer glands, high-strength
low-allow steel tee bolts and nuts, plain backed rubber gaskets and
required joint lubricant.
(g)
All pipe fittings shall be standard or compact ductile iron,
and shall be short body in complete conformance with ANSI/AWWA C110/A21.10.
All fittings shall have a minimum pressure rating of 250 pounds per
square inch (psi). All fittings shall have mechanical joints in complete
conformance with ANSI/AWWA C111/A21.11. The pipe manufacturer shall
furnish the required joint accessories consisting of ductile iron
glands, high-strength low-allow steel tee bolts and nuts, plain backed
rubber gaskets, and required joint lubricant.
(h)
All ductile iron pipe and ductile iron fittings shall be cement
mortar lined and paint seal coated in conformance with ANSI/AWWA C104/A21.4.
The thickness of the lining shall be twice the standard and shall
be not less than 1/8 inch thick for all pipe three inches through
12 inches in diameter.
(i)
Mechanical restraints shall be used for all types of water mains.
Restraint for DIP shall be conventional retainer gland, wedge action
retainer gland or Anchor Pipe (hydrant lead). Restraints for PVC shall
be three-hundred-sixty-degree grip-ring style restraint, PVC Ring
Lock Series 3500 by Star Pipe Products or approved equivalent.
(j)
Transition from HDPE pipe to DIP fittings shall be Plexico HDPE
MJ Adapter, or approved equal.
(k)
Ductile iron water main may be installed by directional drilling
or within a casing boring when conventional excavation techniques
for installation are not allowed (i.e., county and state road crossings
for example) or where ground conditions are difficult (i.e., open
water, wetland areas).
(l)
Either method may be used, but the requirements of this section
must be followed at a minimum.
(m)
For directional drilling HDPE, SDR-11 DIPS, AWWA C-906, blues
stripe or equal shall be used.
(n)
For ductile iron pipe installation within cased bores plans
and details showing the location of the boring pits, receiving parts
and cased bored shall be submitted to the Village Engineer for review
and approval. The following material and installation requirements
shall apply.
[1]
Casing pipe shall be seamless steel pipe per ANSI/ASTM A252
with continuous butt-welded pipe seams.
[2]
Casing pipe shall have a thickness equal to or greater than
the minimum required by the regulatory Authority governing the installation.
The minimum casing pipe size and thickness allowed for use with ductile
iron carrier pipe is as follows:
Water Main Diameter
(inches)
|
Maximum Casing Diameter
(inches)
|
Casing Wall Thickness
(inches)
| |
---|---|---|---|
4 to 12
|
24
|
1/4
| |
16
|
30
|
5/8
| |
20
|
36
|
4/16
| |
24
|
42
|
1/2
|
[3]
The carrier pipe shall be supported on two sets of skids strapped
to the pipe for each length of pipe.
[4]
Casing pipes shall be installed a minimum of five feet below
the top of the road surface.
[5]
Casings shall be filled with pea stone and shall be bricked
up at each end with weep holes, after the pipe is installed.
(2)
Gate valves and valve boxes.
(a)
All gate valves and valve boxes for water mains six inches through
12 inches in diameter, including those for hydrant connections, and
for water services larger than two inches in diameter shall meet the
same specifications as set forth in this section. All such gate valves
three inches through 12 inches shall conform to ANSI/AWWA C509 and
shall be suitable for a minimum working pressure of 200 psi after
having been hydrostatically tested to 400 psi after manufacture. All
valves shall open left with a standard two-inch square operating nut.
All valves shall be furnished with mechanical joint ends complete
with ductile iron glands, high-strength low-allow steel tee bolts
and nuts, plain backed rubber gaskets, and required joint lubricant.
(b)
All gate valves three inches through 12 inches shall be AWWA
C-509, resilient wedge, iron body, bronze mounted, non-rising stem,
open left and shall be furnished with double O-Ring packings. Valves
above twelve-inch diameter shall be butterfly valves, AWWA C504, Class
150.
(c)
All gate valves shall be by the Mueller Company, Model A-2360
or approved equivalent.
(d)
All valve boxes shall be of cast iron, telescopic pattern, and
5 1/4 inches in diameter. Valve boxes for valves three inches
through eight inches shall have a twenty-six-inch top section and
a thirty-six-inch bottom section, but in all cases and for valves
larger than eight inches, the valve shall be furnished to match the
specific valve dimensions and trench depth involved.
(e)
All valve boxes shall be furnished with a cast-iron cover, drop
style, with both the word "WATER" and an arrow indicating the direction
of the valve opening (open left) cast on the cover in raised characters.
Valve boxes shall be Statewide Model SI 2PC VBX TF, Clow 6855 Series
Model 664-A with a five-and-one-fourth-inch standard drop lid, or
approved equal.
(f)
Gate valve and valve box installation shall conform to the requirements
on Sheet 1 of the Standard Detail Sheets. All hydrant leads shall
incorporate a gate valve which, in general, shall be located as far
from the hydrant and as close to the main as possible. Gate valves
at main line junctions shall be located 4± feet away measured
center of the valve to center of the junction or fitting. Gate valves
on ductile iron water services shall generally be located on the street
line or property line or where required by the Water District. All
gate valve locations shall be reviewed and approved by the Village
prior to installation and preferably during the design of the system.
Tops of the valve boxes shall be set flush with grade in paved areas
and set one inch above grade in grassed areas.
(g)
All valves and valve boxes larger than 12 inches in diameter
shall be of a type approved by the Village.
A.
An individual meter shall be required for each premises and for each
separate service connection. If a separate fire service connection
is proposed to be installed as part of a commercial or industrial
project, a fire service water meter is not required unless directed
by the Village.
B.
The owner will furnish the residential meter and the meter couplings,
and the cost of the meter and the meter couplings at the owner's
cost. The owner will maintain meters as stated insofar as ordinary
wear and tear is concerned. In case of damage by freezing, hot water
or external damage, the property owner shall be liable for cost of
repairs.
C.
Backflow of water, which may cause contamination of the water supply,
must be prevented by the installation of an approved backflow prevention
device on the outlet side of the meter when the designated representative
determines that a risk is present. All backflow devices shall be in
compliance with NYSDOH standards and be tested on an annual basis
at the cost of the owner. Test results shall be certified in accordance
with NYSDOH standards and be submitted to the Village. NOTE: Safety
Warning: Hot-Water System Relief. All hot-water tanks and hot-water
heating systems shall be provided with pressure-relief valves. Existing
relief valves shall be in working condition.
D.
Location of meter. The property owner shall provide a place acceptable
to the district for the location of the meter.
(1)
Meters should be installed inside buildings, unless otherwise required
or agreed to by the district. They are usually located in basements
or utility rooms and should be placed in a clean, dry, safe place
at or near the front wall, as close as possible to the point of entrance
of the connecting pipe. Any customer not having a year-round heated
area for the meter will be required to install a meter pit, as approved
the designated representative.
(2)
At start-up, only representatives of the Water District are authorized
to open the curb stop. Once the service is approved, the curb stop
will be opened and line flushed for a minimum of five minutes, to
remove any residual high levels of chlorine and any debris. After
the line is cleaned, the meter will be installed by the owner.
(3)
Meters should be supported firmly, not less than 24 inches or more
than 36 inches above the floor level and should be readily accessible
at all reasonable times for inspection, reading or changing by employees
of the district. A meter setting will not be required if the meter
is properly plumbed and supported soundly. In locations where the
building ground system relies on continuity of water piping, the customer
will install a bonding jumper with UL listed ground clamps around
meter.
(4)
All meters shall be installed with a ball valve before and after
the meter. Ball valves shall be full port, quarter-turn to close/open.
Water meters shall be Invensys SR-EBII, or approved equal displacement
type meters, frost-proof, straight reading in gallons and manufactured
in accordance with AWWA C700.
(5)
Where it is necessary to set the meter outside the building such
as with a building constructed on a slab or a mobile home, or the
service line is installed with less than five feet, zero inches, cover,
increasing the risk of line breakage due to freezing, the meter shall
be installed, at the expense of the property owner, in a pit which
is watertight and frost-proof. The cover of the pit shall be fastened
with a convenient locking device. The meter pit shall be located as
close as possible to the curb stop, on the owner's side, and
be subject to the designated representative's approval.
(a)
For one-inch meter: eighteen-inch diameter Mueller/McCullough
thermal-coil meter box. Box depth shall be 60 inches deep. The box
shall include inlet lock wing angle meter stop, outlet dual check
valve. A full port quarter-turn ball valve shall also be required
where the service enters the building. The box shall have no bottom
and four-inch thick closed cell insulation pad to be placed over the
meter. The top shall be Mueller flat lid with side-mounted standard
water works pentagon nut lock and touch read feature compatible with
Schlumberger ProRead pit reading device.
(b)
For larger than one-inch meter: forty-eight-inch diameter traffic
rated precast concrete manhole with precast top and twenty-four-inch
diameter cast-iron frame and cover. Piping at the meter pit shall
include Water Department approved shutoff valve, DOH approved backflow
prevention device (if required) and a second approved shutoff valve.
Manhole shall be seven feet deep to meet five feet, zero inches, cover
over service, allowing meter to be set one foot, six inches, above
manhole floor. Manhole shall have cast-in-place poly steps 12 inches
on center. All manhole joints shall be made watertight with two rows
of butyl mastic sealant. Manhole wall pipe penetration shall be sealed
with non-shrink waterproof grout. Frame and cover shall be mortared
in place so that cover is one inch high in grassed areas and flush
in paved areas. Remote reading device shall be mounted in the pit
cover.
[1]
Manhole shall be set on six-inch lift of No. 2 crushed stone
and backfilled with clean (maximum size four-inch). Manhole shall
have a three-inch diameter hole in its base to allow water to drain
out of the structure where it is not subject to groundwater influence.
(6)
All meters will have a remote meter reading device which will allow
the district to read the meter without entering the house or business.
Remote reading device will be installed by the owner in an easily
accessible location (not blocked by bushes, snow piles, etc.) approximately
four feet above finished ground level, as approved by the district.
E.
Reading of meters. Meters will be read and inspected periodically by the district. If property owners find that the meter registers an unusual increase over the average amount or water used, which cannot be accounted for, they should inform the district immediately. (See also Subsection G, Testing of meters.)
F.
Right to remove and test meters.
(1)
The district reserves the right to remove and test any meters at
any reasonable time and to substitute another meter in its place.
For two-inch meters or larger, the owner shall be responsible for
the costs of testing, calibration and certification of meter accuracy.
(2)
The property owner shall be given an opportunity to obtain a reading,
and the substitute meter will be read and recorded.
G.
Testing of meters.
(1)
In case of a disputed account involving the accuracy of a meter, the district will test the meter upon the request of the property owner. A meter testing fee, payable in advance of the test, is required. See § 134-14 for fees.
(2)
In the event that the meter is found to over-register in excess of
4% at any flow within the normal test flow limits, the fee will be
returned to the property owner; otherwise, it will be retained.
H.
Replacement of defective meters. In all cases where a meter is found to be defective, it will be replaced by the owner as soon as practicable by a meter that has been tested and properly adjusted under the supervision of the district. In the event the owner does not replace a defective meter, the designated representative is authorized to replace the meter, and charge the owner the meter replacement charge as listed in § 134-14.
I.
Seals. All meters must be sealed. No seal placed by the district
for the protection of any meter, valve or other water connection shall
be tampered with or defaced. If the seal is broken, the district reserves
the right to remove and test the meter at the customer's expense.
A.
General billing procedure.
(1)
Properties within the district shall be billed quarterly by the Village
for water usage, and system operation and maintenance.
(2)
Water usage shall be the number of gallons (or cubic feet) consumed
during the quarter as measured by the difference in water meter readings
taken between subsequent quarters. The water meter rate shall be set
to cover the water meter charge established by the Village of Cobleskill
and as per the intermunicipal agreement between the Village and the
Town.
B.
Billing.
(1)
All administrative services, including billing for water charges,
will be provided by the Village. Those units connected to the water
system shall be billed at a rate equal to 1.5 times the established
sewer rate for properties within the Village. All units within the
Town Water District connected to the system shall be individually
billed by the Village based on usage measured through the unit's
water meter. Billing shall occur quarterly through the Village.
(2)
Bills will show the dates on which the meter readings were taken
and will show the reading at the beginning and end of the period for
which they are rendered. Except in cases where an inaccuracy has been
established by the district, a bill based on the reading of the meter
is deemed conclusive and must be paid.
(3)
In the event that a user does not receive a quarterly bill, it shall
be his/her obligation to so notify the district so that appropriate
measures may be taken by the district. The user will have 30 days
to pay the water bill or shall be subject to a penalty in the amount
of 10% of the amount due. Any such unpaid water charges shall be a
lien upon the real property upon which or in connection with which
the water was used.
C.
Property owner's responsibility for payment. A property owner's
responsibility to pay for water service continues from the time service
is commenced, pursuant to his application, until 10 day's written
notice is received by the district of a change of ownership or occupancy
of the premises or 10 day's written notice is received by the
district to discontinue the applicable service. Upon receipt of such
notice, the district will arrange for a final meter reading and billing.
The property owner will be given an opportunity to be present at the
final meter reading. No allowance will be made in cases of non-occupancy,
unless the district is notified in writing, as stated above. Should
the premises change ownership, all open charges shall be charged against
the premises, payable on billing, by the new owner to the extent that
the prior owner fails to pay for the same.
D.
Estimated bills.
(1)
Where access to a meter cannot be had, the district may bill the
amount charged for the corresponding period of the preceding year,
and in such cases the amount paid will be treated as credit, the amount
due being determined by the next meter reading.
(2)
In cases where it is found that a meter has ceased to register or
has registered inaccurately and the percentage of inaccuracy cannot
be determined by reasonable test, an estimated bill for the billing
period immediately preceding the date when such meter was found defective,
and for the period from said date to the date of replacement of the
meter, may be rendered to the property owner by the district.
(3)
The estimated bill will be based on the amount of water consumed
in the corresponding period of prior years, except where it appears
that there has been a change in the occupancy of the premises or in
the use of water, in which case an equitable adjustment will be made.
E.
Other fees and service charges. (Reserved)
F.
Users without meters.
(1)
Unmetered use of water from the district is in violation of the regulations
of the district.
(2)
In the event that water is being used but no meter has been installed,
or in the case of a nonoperating meter, an estimated bill will be
sent to the user.
(3)
Those properties which have tapped into the main but do not yet have
a meter installed, because they have not installed the service line
into their house, will not be billed for water use.
G.
Nonpayment of water rent. All bills are due and payable within 30 days following the issuance of the bill. If the bill is not paid by the due date, a penalty fee (See § 134-14 for penalty fee.) will be added and the total will be applied to the Village and county tax bill.
H.
Private fire service. Property owners desiring service connections
of reasonable size to the mains of the district, for private fire
protection on their premises, shall make it known, at time of application
for such service, in writing. Such installations shall be in accordance
with this schedule, particularly the rules regarding the installation
of service pipes, connecting pipes and facilities.
I.
Liability of district. The district shall not in any way or under
any circumstances be held liable or responsible to any party for any
losses or damage resulting from fire or water or other causes which
may occur, due to the installation or presence of a private fire service
connection or any pipe or fixture connected therewith or for any losses
or damage resulting from any excess or deficiency in pressure or supply
of water due to any cause whatsoever.
A.
Installation of fire hydrant.
(1)
Fire hydrants are installed by the district on its system for purpose
of public fire protection only. They are owned by the district and
subject to regular inspection and maintenance by the district.
(2)
Hydrants may not be used for street sprinkling, flushing of streets
and sewers, catch basins, stormwater drains, demonstrations, test,
fire drills or similar purposes, or for filling swimming or wading
pools or areas set aside for ice skating, without the written permission
of the district.
B.
Use of hydrants in emergency.
(1)
Where it is necessary to use hydrants for any purpose other than
for public fire protection in an emergency or where no other source
of water supply is available, a special permit is required, issued
by the district, under restrictions imposed in the interest of the
public. The applicant for such permit shall notify the local Fire
Department of the intended use of a hydrant.
(2)
Fire Departments should inform the district promptly of any hydrant
which has been used, or which is leaking, or in need of attention,
so that such hydrants may be placed in readiness for instant operation.
This is particularly important during the winter months.
C.
Fire hydrant specification.
(1)
All fire hydrants shall conform to ANSI/AWWA C502 with five-inch
minimum main valve opening and six-inch minimum mechanical joint inlet
connection furnished complete with ductile iron glands, high-strength
low-alloy steel tee bolts and nuts, plain backed rubber gaskets, and
required joint lubricant. Hydrants shall be suitable for a five-foot
deep trench. Each hydrant shall have two-and-one-half-inch hose connections
and one four-and-one-half-inch pumper connection, all with national
standard hose threads and with outlet nozzle caps and cap chains.
All hydrants shall have double O-Ring packing, and shall open left
with a national standard five-sided operating nut measuring 1 1/2
inches flat to point. The outlet nozzle cap nuts shall be the same
as the operating nut.
(2)
All fire hydrants shall be of break flange construction with a frangible
break flange located slightly above the ground line and a cast-iron
break coupling on the stem at the same location, which shall be so
designed that, in case of breakage, only the break flange and cast-iron
coupling need be replaced to complete repair.
(3)
All hydrants shall receive a factory prime and a finish coat of paint.
Paint shall be weather-resistant Sherwin Williams enamel, or approved
equal. Hydrants shall be painted fire red.
(4)
All fire hydrants shall be Mueller Super Centurion, Model A-423,
as specified by Village resolution. No substitutions or equals.
(5)
Hydrant installation shall conform to the requirements of the manufacturer's
installation instructions. The type of hydrant installation shall
be installed truly vertical at the locations set by the Village and
shall be carefully plumbed before the connection is made. Hydrant
shall be set on a solid precast concrete slab at least 12 inches square
and four inches thick; the concrete slab to be supported by firm undisturbed
material or well-consolidated fill. Crushed stone to a minimum depth
and thickness of 12 inches shall be placed around the drain up to
a level at least six inches above the drain to provide for hydrant
drainage in pervious soil, such as sand or gravel. In impervious soil,
such as clay, a drainage pit two feet in diameter and three feet deep
shall be excavated below each hydrant and filled completely with crushed
stone under and around the bottom of the hydrant up to a level at
least six inches above drain. In both cases, the top of crushed stone
shall be completely covered with polyethylene or building paper to
prevent the backfill from sifting down into the crushed stone drain.
When required by the Village because of evidence of high groundwater,
the hydrant drain opening shall be plugged to prevent the entrance
of groundwater. Hydrants with drain hole plugged shall have a field-stenciled
letter "D" painted on it. In this case, no crushed stone need be placed
under the hydrant.
(6)
All hydrants leads shall include a gate valve located as far from
the hydrant and as close to the main as possible. Separate mechanical
restraint shall be used to secure the hydrant to the valve and then
the valve to the main line tee or other fitting. An anchoring fitting,
Clow F-1217 Tee or F-1218 Elbow with Roto-Ring glands, or approved
equal, shall be the standard installation method used to restrain
the hydrant valve to the main. From the valve to the hydrant, various
means of hydrant restraint may be required. A mechanical joint anchoring
pipe, Clow F-1216 with Roto-Ring gland, or approved equal shall be
the normal method of hydrant restraint. Other types of hydrant restraint,
when required by the Village, will be used to suit the specific installation.
Retainer glands may be required. Mechanical joint retainer glands
shall be ductile iron Clow F-1058, or approved equal.
(7)
All hydrant-lead-valve assemblies shall be blocked against movement
with solid precast concrete blocks both behind the hydrant and behind
the tee as shown on Sheet 1 of the Standard Detail Sheets. These blocks
shall bear against undisturbed material.
(8)
When required by the engineer and/or Village, hydrant guard posts
shall be installed around hydrants meeting AWWA Standards or as approved
by the Village. These posts shall consist of a six-inch diameter piece
of ductile iron pipe set vertically plumb four feet in the ground
with its tip extending six inches above the top of the adjacent hydrant.
The pipe shall be filled with crushed stone with the top 12 inches
of the pipe neatly capped with concrete. After installation, the portion
of the guard posts above the ground line shall be painted in alternating
six-inch wide red and white strips starting with red on top. Paint
shall consist of a double coat of weather-resistant enamel paint matching
in type and color the finish paint coat on the hydrant.
A.
Supply and pressure. The district will use reasonable care and diligence
to provide a constant supply of water at a reasonable pressure but
reserves the right, at any time, after due notice (unless an emergency
occurs) to shut off the water in its mains for the purpose of making
repairs and extensions.
B.
Emergency water use restrictions, sprinkling, irrigation or filling
swimming pool. There may be times when, in the opinion of the district,
it may be necessary to restrict the use of this service to certain
definite periods or to prohibit it entirely. In this event, every
endeavor will be made to notify property owners in advance by appropriate
notice. During emergency situations or as recommended by the designated
representative, the Town Board reserves the right to restrict or curtail
outdoor water use so that potable water fire protection is maintained.
This will be accomplished by Town Board resolution. Public notification
through local media will be arranged by the Town Clerk.
C.
Special quality of water. The district does not undertake to supply
any special quality of water for purposes such as swimming pools,
bleaching or dyeing plants, or laundries. Property owners requiring
water of special quality, or water free from discoloration at all
times, are required to provide their own means of filtering the water,
or provide such other protection as may be deemed necessary for the
purposes required.
D.
Liability of district. The district will not be liable for any injury,
casualty or damage resulting in any way from the supply or use of
water service or from the presence or operation of the devices on
the property owner's premises or from the use of any equipment
or materials installed in conformity with the district's requirements
or recommendations, except injuries or damages resulting from the
negligence of the district.
E.
Adequacy of property owner's facilities. Neither by inspection
nor acceptance nor in any other way does the district give any warranty,
expressed or implied, as to the adequacy, safety or characteristics
of any structures, equipment, pipes, appliances or devices owned,
installed or maintained by the property owner, or leased by the property
owner from third parties.
F.
Cross-connection to other sources prohibited.
(1)
No pipe or fixtures connected with the mains of the district shall
be connected with pipes or fixtures supplied with water from any other
source whatsoever, or any apparatus which may endanger the quality
of the district's water supply.
(2)
Homes with an automatic lawn sprinkler system will be required to
install a NYSDOH approved backflow prevention device after the meter.
It is also recommended in this case that an expansion tank will be
installed near the hot-water heater to prevent any unwanted operation
of the pressure relief valve.
(3)
Backflow-prevention devices shall be double-check valves for residential
services.
(4)
All commercial/industrial services shall be protected with NYSDOH
approved devices.
G.
Interference with district property prohibited. No person is permitted
to turn the water on or off at any street valve, corporation stop
and curb stop, other street reducing valve or check valve, without
the consent of the district.
H.
Frost provision. Extension of pipeline facilities not normally made
when the ground, in which such pipes and connections are required
to be laid, shall be frozen or shall otherwise present serious obstacles
to laying the same.
I.
Discontinuance of service for violation of rules. Service may be
discontinued, after complying with the requirements of law, for any
one of the following reasons:
(1)
Use of water other than represented in the permit.
(2)
Willful waste to the detriment of the Water District, or use of water
through improper and imperfect pipes, or by any other means including
violation of sprinkling or irrigation restrictions imposed by the
district.
(3)
Tampering with any service pipe, seal, meter or any other appliance
owned by the district.
(4)
Nonpayment of bills for water or service rendered by the district
in accordance with this schedule.
(5)
Cross-connecting pipes carrying water supplies by the district with
any other source of supply whatsoever or with any apparatus, which
may endanger the quality of the district's water supply.
(6)
Refusal of reasonable access to the property for the purposes of
inspecting fixtures or piping or for reading, repairing, testing or
removing meters.
(7)
Sub-metering or reselling water. Sub-metering may only occur after
the master meter to the property. The Village will not be responsible
for any submeters, as they will be the responsibility of the property
owner.
(8)
Failure to maintain, in good order, connecting pipes, connections
or fixtures owned by the property owner.
(9)
Failure to properly construct and maintain meter pits or vaults.
(10)
In case of vacancy of premises.
(11)
Use of unmetered water without written consent of the district.
J.
Restoration of service charge.
(1)
When water service has been discontinued on written orders of the property owner or for nonpayment or for violation of these rules and service is again desired by the same property owner, including seasonal customers, the user will be charged a restoration of service charge. (See § 134-14.)
(2)
If, however, by the willful act of the property owner it becomes
necessary to shut off or disconnect the service pipe at the main,
the charge to the property owner for restoration of service will include
the actual cost incurred by the district incident to the disconnection
and restoration of the service pipe. This is in addition to the restoration
of service charge provided for above.
K.
Authority of agents or employees. No agent or employee of the district
shall have authority to bind it by any promise, agreement or representation
not provided in the rules and regulations of the district, or in any
way inconsistent therewith.
L.
Change in schedule for water service.
(1)
The district reserves the right to change, take from or add to this
schedule or its rules and regulations to the extent permitted by law,
or permitted by the applicable regulations of the state regulatory
body having jurisdiction.
(2)
Bills for all meter reading periods affected by a change in rates
will be prorated and computed on the basis of average daily use.
M.
Subdividers or developers to provide mains. For all installations
of waterlines and/or services and appurtenances in areas not included
within existing highways or streets, such as for developments where
roads are being prepared and offered for acceptance as public roads,
the following provisions shall apply:
(1)
Connections shall be made to the water system at a point designated
by duly authorized agent of the municipality.
(2)
Pipe, valves and hydrants shall be installed in accordance with a
plan approved by the district.
(3)
Service connections shall be made with copper tubing or approved
alternates as set forth in other sections.
(4)
Furnishing of materials and installation of all waterlines, valves,
hydrants, and services shall be in a manner satisfactory to the duly
authorized agent of the municipality.
(5)
All cost of materials and installation of water mains, valves, hydrants
and services shall be borne by the developer.
(6)
As a condition of obtaining services, all water mains, valves and
hydrants, plus water services to the limits of existing public highways
or to the outer limits of any proposed highways designed in accordance
with the Town's Street and Highway Law shall be deeded to the
municipality.
N.
Conformance with regulations. It is intended that these standard
specifications conform in all ways with the regulations and requirements
of the NYSDOH. In cases where discrepancies exist, the NYSDOH regulations
shall govern.
O.
Ownership of water distribution system. All water mains, fittings
and valves larger than six inches in diameter and all hydrants shall
be owned by the Town after their construction by the owner and their
inspection and acceptance by the Town. Such facilities shall be located
in public right-of-way or in easements granted to the Town.
An outside user or applicant is one whose premises, as defined in § 134-3A, is not included within the boundaries of the Water District as defined in the resolutions creating the Water District or its extension.
A.
Geographical limits. The legal boundary description of each district
on file at Town Hall to determine if the property is outside the district.
B.
Applying for water.
(1)
Anyone wishing to become an outside user must contact the designated
representative, in writing, so stating their desire and identifying
the premises to be served by section, block and lot. The Town Board
must approve all requests for outside user hookups.
(2)
The Town Board must first consider the request for an outside user
connection. The applicant shall also obtain approval from any state
agency as required by state law.
(3)
After all involved have reviewed and approved or denied the request,
the designated representative shall notify the applicant.
(4)
Upon receiving approval for connection as an outside user, the applicant must complete an application and return it to the district's designated representative with the required deposit. See § 134-14 for deposit requirements. No person shall use water without first filing with the district an application for service.
(5)
If the premises to be supplied with a meter has no service pipe connection
to the water main, an application must be made to the district for
the tapping of the main and installation of the service pipe from
main to property line.
(6)
The applicant shall be responsible for all cost required to establish
service to his/her premises from the main, including tapping the main.
After the installation is complete, the district will assume ownership
of the portion of the service from the main to, but not including,
the curb stop and be responsible for maintenance of the service on
public land.
C.
Extension and or contract. Outside users may be added, if approved
by the Town Board, individually by obtaining a written agreement between
the owner and the Water District, or as part of an extension involving
two or more users. An extension shall conform to state law for extensions
to water districts. The district prefers the formation of an extension
over the use of individual contracts and every effort should be made
to create an extension where appropriate. It is appropriate to form
an extension when there is more than one potential applicant. All
service connections shall be made in accordance with these rules and
regulations.
D.
Outside user connection fee. Prior to final inspection and activation of the service, the applicant must pay a one-time outside user connection fee. (See § 134-14 for fee.)
E.
Extensions to the water main outside the district. Additions to the
main are required when adding a service where the distance from an
existing main to the property line is greater than 35 feet. Any exceptions
must be approved by the designated representative after engineering
review. This applies to a service on an individual basis and for extensions.
The applicant for the extension is responsible for the cost or any
main extension and any other cost incurred by the district for the
sole benefit of the applicant or extension.
(1)
Plans for additions to the main outside the district. Plans for additions
to the main, prepared by applicants, their engineer or agent, must
be submitted to the district for engineering review prior to any work.
(2)
Hydrants outside the district. Hydrants must be included in a main
addition where the main is extended more than 500 feet from the nearest
existing hydrant.
(3)
Ownership of water main outside the district. After completion and
acceptance of all work, the district will assume the ownership of
all additions to the water main.
A.
Application for services. An application must be submitted to the
Town Clerk and approved by the designated representative prior to
the commencement of any work associated with the installation of water
pipes.
B.
Installation of services. The contractor shall not proceed with the
work until written authorization to do so is received from the designated
representative. In addition, the contractor will have the responsibility
of seeing that any and all necessary permits are obtained before work
begins.
C.
Inspection of service installation. The homeowner's contractor
will be required to notify the designated representative as to when
the service will be installed, so that the designated representative
or his representative can be present to inspect the work.
D.
Records. Copies of the application for service will be retained by
the designated representative and the Town offices. All pertinent
information will be recorded by the designated representative on the
user's master record sheet.
The Town of Cobleskill has entered into an intermunicipal agreement
with the Village of Cobleskill to provide complete operation, maintenance
and administration of the proposed Water District once construction
is completed.
A.
Users' meter cards. (Reserved)
B.
User record.
(1)
A user record sheet will be maintained by the Water Superintendent
for every user in the district and all user's application for
service that is submitted.
(2)
It will be the responsibility of the Water Superintendent to see
that the user records are kept up-to-date. The user records will be
kept in the Village Hall where they will be available to the mayor.
A duplicate of the user records will be kept by the Water Superintendent
for his own reference, but will at no time be a substitute for the
records kept at the Village Hall.
C.
Meters.
(1)
It will be the responsibility of the Water Superintendent to insure
that all water meters are operating properly.
(2)
Meters will be inspected visually at random. If there is evidence
of damage to the meter, or tampering, the Water Superintendent will
make arrangements to have the meter tested and repaired.
(3)
Meters will also be removed for inspection and repair if an inaccuracy
is suspected.
D.
Hydrants.
(1)
Hydrants should be inspected and tested at least once a year to see
that they are in proper operating condition.
(2)
The Water Superintendent will maintain a record of all inspections.
Included in this record will be the date of the inspection, the location
of the hydrant, its condition and a list of necessary repairs.
(3)
Should repairs be necessary, the Water Superintendent will make the
necessary arrangements to have the work done as soon as possible.
The Water Superintendent will also notify the Fire Department whenever
a hydrant is not functioning properly.
E.
Valves.
(1)
On a periodic basis, preferably once every two years, valves should
be checked to insure that they are operating properly.
(2)
Valve covers should be visible and flush with finished grade. Should
a street be repaved, it will be the responsibility of the Water Superintendent
to see that valve covers and valve boxes are raised to the new grade.
(3)
Valve boxes should be cleaned, if necessary, so that a wrench can
easily be positioned over wrench nut. The valves should be closed
a few turns, then reopened to their original position.
(4)
As with the hydrants, the Water Superintendent will maintain a record
of all inspections.
F.
Tank vault. The condition of the vault containing the tank level
control panel and pressure transmitter should be checked weekly, or
as conditions require, by the Superintendent.
G.
Storage tank.
(1)
The storage tank should be visually inspected at least once a year
by the Water Superintendent and should be carefully inspected prior
to repair, and at any time when leakage or some other apparent deterioration
is observed. In any event, the water tank should be thoroughly inspected
at intervals of not more than five years.
(2)
Inspection of the tank at five-year intervals should be done according
to the recommendations of the American Water Works Association, AWWA
0101-35.
H.
Booster pump station. The Superintendent shall log the run time reading
for each pump, determine hours of run time since last inspection and
take action when the run time indicates routine maintenance is due.
The Superintendent shall also record water tank level and insure that
the minimum and maximum are not exceeded.
I.
PRV vaults. The condition of the vault containing the system pressure
reducing valves (PRVs) on Route 7 at Rubin Road and one in the booster
pump station should be checked monthly, or as conditions require,
by the Superintendent. The Superintendent shall log the system pressure
on the upstream and downstream side of the valve, and make any adjustments
necessary to maintain the proper system pressure.
The right is reserved to change and amend these rules, regulations
and ordinances, to make special rates, variations and contracts in
all proper cases, or to turn off the water supply without notice in
case of extensions, repairs or other necessity, without liability
for damages for lack of water, or for any damage which may result
from the turning off of the water supply.
Fees: See Village of Cobleskill fee schedule (The Village fee
schedule is set by the Village Board on January 1 of each year). Those
connected to the sewer system shall pay a rate equal to 1.5 times
the established sewer rate for the properties within the Village.
A.
Penalties. Any person, firm, or corporation violating any of the
provisions of this chapter or any property owner permitting such a
violation to occur on their property shall be guilty of an offense
punishable by a fine as set forth in Table 15.1 and shall be assessed
reasonable attorney's fees for prosecuting such case on behalf
of the Village. For purposes of computing fines, each day's continued
violation shall constitute a separate offense. The Village shall also
have all such other remedies as are allowable by law including injunctive
relief.
B.
Enforcement actions. The Code Enforcement Officer shall serve written
notice, either by personal service or by certified mail, return receipt
requested, addressed to the premises of such violation, on the person
or persons committing the violation. The Town Board may also maintain
an action or proceeding in the name of the Town in a court of competent
jurisdiction to compel compliance with or to restrain by injunction
the violation of any such local law, rule or regulation, notwithstanding
that the local law rule or regulation may provide a penalty or other
punishment for such violation.
Table 15.1
Maximum Penalties for Violations
| ||
---|---|---|
First conviction
|
$500
| |
Second conviction
|
$1,000
| |
Third and subsequent convictions
|
$2,000
|
A.
Interpretation. In their interpretation and application, the provisions
of this chapter shall be held to be minimum requirements, adopted
for the promotion of the public health, safety, or the general welfare
of the Town.
B.
Conflict with other laws. Whenever the requirements of this chapter
are at variance with the requirements of any other lawfully adopted
rules, regulations, or local laws, the most restrictive, or that imposing
the higher standards, shall govern.
C.
Saving Clause. If any article, section, paragraph, clause or provision
of this chapter shall be held invalid by a court of competent jurisdiction,
the invalidity of such article, section, paragraph, clause or provisions
shall not affect any of the other articles, sections, paragraphs,
clauses, or provisions of this chapter.
D.
Professional services. During the administration of this chapter,
the Town Board, Planning Board, Zoning Board of Appeals and/or the
Code Enforcement Officer may engage the services of an engineer, architect,
surveyor, attorney, or other professional or expert as deemed necessary
to complete the review for a particular permit or project or to solve
a particular dispute. The fees for such services will be paid by the
Town and shall be reimbursed by the applicant or individual seeking
relief. Applicants shall be billed on a monthly basis for such charges
by the Town Clerk as invoices are received by the Town. No permit
or project approval shall be granted to any person for any proposal
until all outstanding fees owed to the Town are paid in full.