[Ord. No. 2206 §§1 —
2, 6-5-2000]
This Article sets forth wastes which are generally unacceptable
for discharge to the POTW, requirements for discharge of hauled wastes,
requirements for accidental discharge/slug control plans and requirements
for wastewater discharge monitoring facilities.
[Ord. No. 2206 §§1 —
2, 6-5-2000]
A. No
person shall cause, permit, or allow discharge to the POTW of the
following materials, substances, or wastes:
1. Any solid, liquid or gas which by reason of its nature and/or quantity
creates a fire or explosive hazard in the POTW including, but not
limited to, wastestreams with a closed cup flashpoint less than or
equal to one hundred fifty degrees Fahrenheit (150° F) using the
test method specified in 40 C.F.R. §261.21.
2. Any wastewater having a pH less than 6.0 or greater than 11.0.
3. Any garbage except properly shredded garbage.
4. Any solid or viscous materials in amounts or concentrations which
cause obstruction of the flow in the POTW, or solids greater than
one-half (½) inch in any dimension. Examples of such materials
include, but are not limited to, ashes, wax, paraffin, cinders, sand,
mud, straw, shavings, metal, glass, rags, lint, feathers, tars, plastics,
wood and sawdust, grass clippings, paunch manure, hair and fleshings,
entrails, lime slurries, beer and distillery slops, grain processing
wastes, grinding compounds, acetylene generation sludge, chemical
residues, asphalt residues, acid residues, residues from refining
or processing fuel or lubricating oil, and food processing bulk solids.
5. Any oil and grease of animal or vegetable origin in excess of one
hundred fifty (150) mg/l.
6. Any petroleum oil, non-biodegradable cutting oil, or products of
mineral oil origin in amounts that will cause interference or pass
through.
7. Any corrosive, noxious or malodorous material or substance which,
either singly or by reaction with other wastes, is capable of causing
damage to the POTW or creating a public nuisance or hazard, or preventing
entry into the POTW's facilities for maintenance and repair.
8. Any concentrated dyes or other materials which are either highly
colored or could become highly colored by reacting with other discharges.
9. Any material or substance not specifically mentioned in this Section
which is in itself corrosive, irritating to human beings or animals,
toxic or noxious, or which by interaction with other wastes could
produce undesirable effects, including deleterious action on the POTW's
facilities or operations, hazards to humans or animals, or adverse
effect(s) upon the receiving stream.
10. Any sludges, screenings, or other residues from the pretreatment
of industrial wastes.
11. Any medical wastes, except as specifically authorized by the Director.
12. Any wastewater having a temperature greater than one hundred fifty
degrees Fahrenheit (150° F) or which will inhibit biological activity
in the POTW or which will cause the temperature at the treatment plant
influent to exceed one hundred four degrees Fahrenheit (104° F).
13. Any septic tank sludge or any other trucked or hauled pollutants,
expect at facilities with an approved pretreatment permit.
14. Any wastewater containing any radioactive waste or isotopes except
as specifically approved by the Director in compliance with applicable
State and Federal Statutes and regulations.
15. Any storm water, surface water, ground water, artesian well water,
roof runoff, subsurface drainage, condensate, deionized water, non-contact
cooling water, or unpolluted industrial wastewater unless authorized
by the Director.
16. Any material or combination of materials which results in the presence
of toxic gases, vapors or fumes within the POTW in a quantity that
may cause worker health and/or safety problems.
17. Any discharge containing detergents, surface active agents, or other
substances which cause excessive foaming in the POTW.
18. Any discharge which alone or in combination with other discharges
causes pass through or interference. A discharge may not be considered
to have caused pass through or interference if it was otherwise in
compliance with this Chapter and any wastewater discharge permit issued
hereunder.
19. Any discharge which contains any of the following substances in excess
of the following daily maximum and/or instantaneous maximum total
concentrations. These restrictions apply at the point where the wastewater
is discharged to the POTW:
|
Arsenic*
|
1.80 mg/l
|
|
Benzene
|
0.50 mg/l
|
|
Cadmium*
|
1.00 mg/l
|
|
Chromium*
|
5.00 mg/l
|
|
Copper*
|
5.10 mg/l
|
|
Cyanide*
|
2.00 mg/l
|
|
Ethylbenzene
|
1.00 mg/l
|
|
Lead*
|
5.00 mg/l
|
|
Mercury*
|
0.05 mg/l
|
|
Nickel*
|
20.00 mg/l
|
|
Phenols
|
5.00 mg/l
|
|
Silver*
|
5.00 mg/l
|
|
Toluene
|
1.00 mg/l
|
|
Xylene
|
1.00 mg/l
|
|
Zinc*
|
10.10 mg/l
|
|
PCB's
|
0.01 mg/l
|
|
Total Toxic Organics (TTOs) as defined by 40 C.F.R. §433.11(e)
shall not exceed 5.0 mg/l at any time.
|
|
* All other provisions of this Chapter notwithstanding, no industrial
user shall discharge this pollutant in an amount exceeding five percent
(5%') of the average daily loading (in pounds per day) of this pollutant
at the receiving WWTP without the express written consent of the Director.
|
20. Any discharge or effluent which violates the limitations imposed
by a wastewater discharge permit issued under the provisions of this
Chapter, or categorical standard, including equivalent concentration
limits based on a mass- or production-based categorical standard and
concentration limits derived in accordance with the combined wastestream
formula.
[Ord. No. 2206 §§1 —
2, 6-5-2000]
A. When
necessary to protect or to prevent adverse effects on the POTW, its
treatment processes, receiving stream, sludge treatment or disposal
processes, to provide for worker health and safety, to impose categorical
standards, or to address similar concerns of other jurisdictions providing
sewer service to the City, the Director may:
1. Impose mass limitations in addition to or in place of concentration
limitations provided for in this Chapter or in any applicable categorical
pretreatment standards;
2. Establish more stringent standards or requirements for discharge
to the POTW in wastewater discharge permits;
3. Establish limits on the effluent from specific industrial processes
or pretreatment systems in wastewater discharge permits;
4. Issue wastewater discharge permits to industrial users setting out
special requirements for discharge to the POTW. In no case shall a
permit waive compliance with a categorical pretreatment standard or
allow any discharge which could cause pass through or interference,
except that the Director may establish a reasonable time frame for
compliance with this Chapter;
5. Require treatment to reduce the BOD, suspended solids, and/or oil
and grease concentrations in a discharge to levels more closely approaching
those of normal sewage; and/or
6. Establish additional temporary standards for substances not specifically mentioned in Section
705.110. Such temporary standards shall be effective for a period not to exceed one hundred twenty (120) days.
[Ord. No. 2206 §§1 —
2, 6-5-2000]
No industrial user shall ever increase the use of process water,
or in any way attempt to dilute a discharge, as a partial or complete
substitute for adequate treatment to achieve compliance with a pretreatment
standard unless expressly authorized by an applicable pretreatment
standard.
[Ord. No. 2206 §§1 —
2, 6-5-2000]
The Director may require any industrial user to undertake a
compatibility study for waste proposed for discharge to the POTW to
determine whether the waste may be accepted by the POTW.
[Ord. No. 2206 §§1 —
2, 6-5-2000]
Hauled wastes, including septic tank sludge, contents of cesspools
and privy vaults, and other non-hazardous wastes, shall not be introduced
or accepted into the City's sewers other than through a facility with
a wastewater discharge permit.
[Ord. No. 2206 §§1 —
2, 6-5-2000]
A. The
Director may require reasonable safeguards to prevent discharge or
leakage of any material stored in areas served by, or draining into,
the POTW which could create a fire or an explosion hazard in the POTW
or in any other way have a deleterious effect upon the POTW's facilities
or treatment processes, or constitute a hazard to human beings or
animals or the receiving stream.
B. The
Director may require any industrial user to develop and implement
an accidental/slug discharge control plan. This plan shall include
at least the following:
1. Description of discharge practices, including non-routine batch discharges;
2. Description and location of stored chemicals;
3. Procedures for immediately notifying the POTW of any accidental or slug discharge or any discharge which violates Section
705.110 and for providing a written report of such discharge within five (5) days of its occurrence. Such report shall be submitted in accordance with Section
705.420;
4. Procedures for permanently posting a notice in a conspicuous place in a common area of the industrial user's premises advising employees whom to call in the event of a discharge described in Subsection
(A) of this Section. Employers shall ensure that all employees who may cause or suffer such a discharge to occur are advised of the emergency notification procedure; and
5. Procedures to prevent adverse impact from any accidental or slug
discharge. Such procedures include, but are not limited to, inspection
and maintenance of storage areas, handling and transfer of materials,
loading and unloading operations, control of plant site runoff, worker
training, measures for containing materials, and/or measures and equipment
for emergency responses.
[Ord. No. 2206 §§1 —
2, 6-5-2000]
The Director may require the owner of any property occupied
by an industrial user to install and maintain at his own expense suitable
monitoring facilities to facilitate the City's and the industrial
user's observation, sampling and measurement of the discharge of the
building sewer and/or internal drainage systems and/or effluent from
specific processes.
Such facilities shall be easily accessible and safely located
and shall have ample room in or near said facilities to allow accurate
collection and preparation of samples for analysis. Such facilities
shall be constructed in accordance with plans approved by the Director
and shall be located so as to permit the gauging of flow and the collection
of samples truly representing the effluent from regulated processes
or the discharge from the property. The facilities and the sampling
and measuring equipment shall be maintained at all times in a safe
and proper condition at the expense of the industrial user.