Until a floodway is designated, no new construction, substantial
improvements or other development, including fill, shall be permitted
within any numbered A Zones or AE Zones on the community's FIRM, unless
it is demonstrated that the cumulative effect of the proposed development,
when combined with all other existing and anticipated development,
will not increase the water surface elevation of the base flood more
than one (1) foot at any point within the community.