The special flood hazard area shall be:
A. Any areas of Borough of Upland, classified as special flood hazard
areas (SFHAs) in the Flood Insurance Study (FIS) and the accompanying
Flood Insurance Rate Maps (FIRMs) dated November 18, 2009, and September
2, 2015, and issued by the Federal Emergency Management Agency (FEMA),
or the most recent revision thereof, including all digital data developed
as part of the Flood Insurance Study.
B. The above-referenced FIS and FIRMs, and any subsequent revisions
and amendments, are hereby adopted by the Borough of Upland and declared
to be a part of this chapter.
The special flood hazard area shall consist of the following
specific areas:
A. The Floodway Area shall be those areas identified in the FIS and
the FIRM as floodway and which represent the channel of a watercourse
and the adjacent land areas that must be reserved in order to discharge
the base flood without increasing the water surface elevation by more
than one foot at any point. This term shall also include floodway
areas which have been identified in other available studies or sources
of information for those special flood hazard areas where no floodway
has been identified in the FIS and FIRM.
(1) Within any floodway area, no encroachments, including fill, new construction,
substantial improvements, or other development shall be permitted
unless it has been demonstrated through hydrologic and hydraulic analysis
performed in accordance with standard engineering practice that the
proposed encroachment would not result in any increase in flood levels
within the community during the occurrence of the base flood discharge.
(2) Within any floodway area, no new construction or development shall
be allowed.
B. The AE Area/District shall be those areas identified as an AE Zone
on the FIRM included in the FIS prepared by FEMA for which base flood
elevations have been provided.
(1) The AE Area adjacent to the floodway shall be those areas identified
as an AE Zone on the FIRM included in the FIS prepared by FEMA for
which base flood elevations have been provided and a floodway has
been delineated.
C. The A Area/District shall be those areas identified as an A Zone
on the FIRM included in the FIS prepared by FEMA and for which no
base flood elevations have been provided. For these areas, elevation
and floodway information from other federal, state, or other acceptable
sources shall be used when available. Where other acceptable information
is not available, the base flood elevation shall be determined by
using the elevation of a point on the boundary of the special flood
hazard area which is nearest the construction site.
(1) In lieu of the above, the municipality may require the applicant
to determine the elevation with hydrologic and hydraulic engineering
techniques. Hydrologic and hydraulic analyses shall be undertaken
only by professional engineers or others of demonstrated qualifications,
who shall certify that the technical methods, used correctly, reflect
currently accepted technical concepts. Studies, analyses, computations,
etc., shall be submitted in sufficient detail to allow a thorough
technical review by the municipality.
The special flood hazard area may be revised or modified by the Borough of Upland where studies or information provided by a qualified agency or person documents the need for such revision. However, prior to any such change to the special flood hazard area, approval must be obtained from FEMA. Additionally, as soon as practicable, but not later than six months after the date such information becomes available, the Borough of Upland shall notify FEMA of the changes to the special flood hazard area by submitting technical or scientific data. See §
90-23B for situations where FEMA notification is required.
Should a dispute concerning any identified floodplain boundary
arise, an initial determination shall be made by the Floodplain Administrator
and the Borough Engineer, and any party aggrieved by this decision
or determination, may appeal to the Borough Zoning Hearing Board.
The burden of proof shall be on the appellant.
Prior to development occurring in areas where annexation or
other corporate boundary changes are proposed or have occurred, the
community shall review flood hazard data affecting the lands subject
to boundary changes. The community shall adopt and enforce floodplain
regulations in areas subject to annexation or corporate boundary changes
which meet or exceed those in 44 CFR 60.3.