[Ord. 1-2012, 9/19/2012, § 501]
1. The Township Engineer or his Township designee shall inspect all
phases of the installation of the permanent BMPs and/or stormwater
management facilities as deemed appropriate by the Township Engineer.
2. During any stage of the work, if the Township Engineer or his Township
designee determines that the permanent BMPs and/or stormwater management
facilities are not being installed in accordance with the approved
stormwater management plan, the Township may revoke any existing permits
or other approvals and issue a cease and desist order until a revised
SWM site plan is submitted and approved, as specified in this chapter,
and until the deficiencies are corrected.
3. A final inspection of all BMPs and/or stormwater management facilities
shall be conducted by the Township Engineer or his Township designee
to confirm compliance with the approved SWM site plan prior to the
issuance of any occupancy permit.
[Ord. 1-2012, 9/19/2012, § 502]
1. The developer shall be responsible for providing as-built plans of
all SWM BMPs included in the approved SWM site plan for activities
involving regulated impervious surfaces 2,000 square feet or greater
and for earth disturbances 5,000 square feet or greater. The Township
may waive this requirement and allow small projects as-builts to be
completed under the Simplified Approach. The as-built plans and all
explanation of any discrepancies with the construction plans shall
be submitted to Thornbury Township within three months of the completion
of construction of the SWM BMPs.
[Amended by Ord. No. 3-2022, 9/21/2022]
2. As-built plans shall show the location (including latitude and longitude
coordinates) and as-built conditions of all SWM BMPs and include the
following information: impervious surfaces included in the approved
SWM site plan; topographic contours; utility mains and service lines,
top and bottom of walls, spot elevations on ground, at building/structure
corners and along driveway, spot elevations on and within BMP structures,
foundation drain location, and existing, proposed, and built impervious
surfaces shown and tabulated in the as-built drawings.
[Amended by Ord. No. 3-2022, 9/21/2022]
3. The as-built submission shall include a certification of completion
signed by a Design Professional verifying that all permanent SWM BMPs
have been constructed according to the approved plans and specifications.
4. The Township will review the as-built submission for consistency
with the approved SWM site plan as well as actual conditions at the
project site. After receipt of the completion certification by the
Township, the Township may conduct a final inspection.
5. If an
NPDES permit for stormwater discharges associated with construction
activities was required for the regulated activity, a notice of termination
(NOT) approval must be obtained upon completion of construction prior
to final approval of the project by Thornbury Township.
[Added by Ord. No. 3-2022, 9/21/2022]