Ord./Res.
|
Date
|
Subject
|
---|---|---|
Res. 1-2006
|
1/18/2006
|
Approving the final subdivision application by OHB Homes, Inc.,
for Greenbriar Phase 5 (Dallett Property), consisting of 85 townhouses
on approximately 20.21 acres, with waivers and conditions
|
Res. 2-2006
|
2/1/2006
|
Approving the final land development application by Wawa, Inc.,
for construction of a Wawa Food Market on 2.27 acres, 0.17 acres located
in the Township, located along Route 202, with conditions
|
Res. 3-2006
|
2/1/2006
|
Approving final minor subdivision application by Jay Neilon,
to remove sheet 2 of 5 (additional dimensioning along Skyline Drive
right-of-way) of the final subdivision originally approved April 6,
2005
|
Res. 7-2006
|
5/15/2006
|
Approving preliminary subdivision application by NVS Custom
Homes, Inc., for Andover (a.k.a. Balderston), with waivers and conditions
|
Res. 10-2006
|
7/19/2006
|
Approving amendment to final land development application by
Cutler Group, Inc., for a minor lot line change (Lot 12)
|
Res. 14-2006
|
12/20/2006
|
Approving final subdivision application by NVS Custom Homes,
Inc., for Andover, with waivers and conditions
|
Res. 3-2007
|
1/17/2007
|
Approving final minor subdivision application by Allen McCann
for McCann Final Subdivision to subdivide 13.483-acre two lots into
three separate lots, with waivers and conditions
|
Res. 13-2009
|
8/5/2009
|
Approving the application made by William Burkholder for final
subdivision known as "Burkholder Subdivision" for the approval to
subdivide an existing 6-acre lot into 2 residential lots: Lot 1 consisting
of approximately 3,000 square feet with an existing house and Lot
2 consisting of approximately 3,000 square feet. The property is located
at 19 Tiffany Lane
|
Res. 15-2009
|
9/2/2009
|
Approving the application for Collins preliminary subdivision
|
Res. 16-2009
|
9/2/2009
|
Approving the land development application made by Joseph Horne
to construct a 4,500 (+/-) square feet garage located at 656 Cheyney
Road
|
Res. 22-2009
|
12/2/2009
|
Approving land development application made by Glen Mills Schools
to construct a laundry facilities building located at 179 Glen Mills
Road
|
Res. 2010-26
|
8/4/2010
|
Approving the final subdivision application made by C. Edward
Scheivert, Inc., to divide 18+/- acres into 6 lots
|
Res. 2010-27
|
8/4/2010
|
Approving the final land development application made by Carl
Williams, Inc., on behalf of Cheyney University for a new dormitory
at 740 Tanguy Road
|
Res. 2010-28
|
9/1/2010
|
Approving the application of Eric R. Miller for conditional
use design approval for 167 Locksley Road
|
Res. 2010-29
|
9/1/2010
|
Approving the application of Scott H. Cannon and Sarah K. Cannon
for amended conditional use design approval for Black Bell Farm
|
Res. 2010-30
|
9/15/2010
|
Approving the preliminary/final subdivision application made
by Eric R. Miller to divide 4.5 +/- acres into 2 lots
|
Res. 2010-32
|
11/3/2010
|
Approving the application of Geoffrey R. Carbutt and Karen Carbutt
for conditional use design approval for 373 Glen Mills Road
|
Res. 2010-33
|
11/3/2010
|
Approving the preliminary/final subdivision application made
by Geoffrey R. Carbutt to divide 1.60 +/- acres into 2 lots
|
Res. 2011-7
|
2/2/2011
|
Reapproving the Miller Subdivision Plans originally approved
by the Township Board of Supervisors, September 15, 2010
|
Res. 2011-9
|
3/2/2011
|
Approving the final subdivision application made by Scott and
Sarah Cannon, equitable owners
|
Res. 2011-10
|
3/2/2011
|
Approving the preliminary reverse subdivision plan and preliminary
subdivision application made by J. Ward and Chris P. Guilday
|
Res. 2011-13
|
6/1/2011
|
Approving the final minor subdivision application made by Thorkild
S. Paaby, Jr.
|
Res. 2012-11
|
3/21/2012
|
Approving the preliminary reverse subdivision plan and final
subdivision application made by J. Ward and Chris P. Guilday
|
Res. 2012-13
|
9/19/2012
|
Approving the amended subdivision plan application made by Joseph
Gricco
|
Res. 2012-14
|
11/28/2012
|
Approving the subdivision plan application made by 53 Sweetwater
Road Corp.
|
Res. 2014-8
|
5/21/2014
|
Approving the preliminary/final subdivision plan application
made by Eric and Linda Miller
|
Res. 2014-9
|
8/20/2014
|
Approving the preliminary/final subdivision plan application
made by Romill Associates, L.P.
|
Res. 2014-10
|
11/19/2014
|
Approving the final minor subdivision plan application made
by Megill Homes, LLC.
|
Res. 2015-10
|
11/4/2015
|
Approving the preliminary/final subdivision plan application
made by Michael R. and Mary A. Phillips
|
Res. 2016-6
|
2/17/2016
|
Denying approval of the sketch plan submitted by VMDT Partnership,
L.P.
|
Res. 2016-7
|
4/20/2016
|
Approving the Mettimano preliminary/final land development plan
for 19 Skyline Drive
|
Res. 2016-8
|
4/20/2016
|
Approving the Beard reverse subdivision/subdivision plan for
29 Stoney Bank Road
|
Res. 2016-9
|
5/4/2016
|
Approving the Black Bell Farm preliminary subdivision and land
development plan
|
Res. 2016-10
|
7/20/2016
|
Approving the Morgan preliminary/final subdivision plan for
19 Bennetts Lane and 23 Bennetts Lane
|
Res. 2016-11
|
7/20/2016
|
Approving the Daniels preliminary subdivision plan for 425 Thornton
Road
|
Res. 2017-8
|
3/1/2017
|
Approving the Crane preliminary subdivision plan for 105 Stony
Bank Road
|
Res. 2017-10
|
4/19/2017
|
Approving the Fraley final subdivision plan for 430 Glen Mills
Road
|
Res. 2017-11
|
5/3/2017
|
Approving the 53 Sweetwater Road Corporation final subdivision
plan for 53, 55 and 57 Sweetwater Road
|
Res. 2017-15
|
5/17/2017
|
Approving the Vaughan & Sautter final subdivision and land
development plans for 594 Cheyney Road
|
Res. 2017-16
|
7/19/2017
|
Conditionally approving the Donald A. Culp preliminary/final
subdivision plan for 420 Thornton Road
|
Res. 2017-19
|
10/4/2017
|
Approving the Toll PA, IV, LP, final major subdivision plan
for 105 Stony Bank Road
|
Res. 2018-4
|
1/17/2018
|
Approving the Pelura preliminary/final subdivision plan for
22 Natalie Road
|
Res. 2018-12
|
9/19/2018
|
Approving modification to the 53 Sweetwater Road Corporation
final subdivision plan for 53, 55 and 57 Sweetwater Road
|
Res. 2019-11
|
9/4/2019
|
Approving the G.D. Houtman & Son, Inc. preliminary/final
plan for 28 Gradyville Road
|
Res. 2019-12
|
10/16/2019
|
Approving the G.D. Houtman & Son, Inc. preliminary/final
plan for 87 Tanguy Road
|
Res. 2020-5
|
2/5/2020
|
Approving the Momenee, Inc. plan for 26 Westtown Road
|
Res. 2020-10
|
10/21/2020
|
Approving the Inland Design preliminary/final plan for 74 Locksley
Road
|
Res. 2020-11
|
10/21/2020
|
Approving the G.D. Houtman & Son, Inc. preliminary/final
plan for 1045 Valley Road
|
Res. 2021-5
|
3/17/2021
|
Approving the D. Christopher Le Vine preliminary/final plan
for 72 Sweetwater Road
|
Res. 2021-10
|
4/21/2021
|
Approving the Edward B. Walsh & Associates, Inc. plan for
1651 and 1661 Old Gradyville Road
|
Res .No. 2022-7
|
2/16/2022
|
Conditionally approving the preliminary/final grading plan for
15 Tanguy Road
|
Table of Contents
Table of Contents