[Ord. 421, 9/9/2014]
All subdivision proposals and development proposals containing
at least 50 lots or at least five acres, whichever is the lesser,
in identified floodplain areas where base flood elevation data are
not available shall be supported by hydrologic and hydraulic engineering
analyses that determine base flood elevations and floodway information.
The analyses shall be prepared by a licensed professional engineer
in a format required by FEMA for a conditional letter of map revision
and letter of map revision. Submittal requirements and processing
fees shall be the responsibility of the applicant.