[Res. 12-88-595, 12/8/1988; Ord. 7-89-312, 7/13/1989; Res. 3-90-658, 3/8/1990; by Ord. 10-92-362, 10/8/1992; Res. 8-93-787, 8/26/1993; Res. 2-97-919, 2/27/1997; Res. 6-97-935, 6/12/1997; Res. 12-97-956, 12/12/1997; Res. 12-10-1998, 12/10/1998; Res. 01-2002-1095, 1/7/2002; Res. 01-2002-1096, 1/7/2002; Res. 05-2003-1122, 5/22/2003; Res. 09-2003-1134, 9-25-2003; Res. 07-2004-1168; Res. 09-2005-1201, 9/8/2005; Res. 07-2007-1253, 7/12/2007; Res. 01-2008-1267, 1/17/2008; Res. 04-2009-1321, 4/23/2009; Res. 04-2012-1418, 4/26/2012; Res. 05-2012-1420, 5/24/2012; Res. 09-2012-1424, 9/27/2012; Res. 08-2014-1481, 8/14/2014; Res. 06-2015-1508; Res. 01-2016-1530; Res. No. 12-2017-1585, 12/28/2017; Res. No. 12-2017-1586, 12/28/2017, Res.Res. No. 03-2018-1605, 3/22/2018; by Ord. No. 06-2018-617, 6/14/2018; Res. No. 03-2019-1620, 3/14/2019; Res. No. 02-2020-1670, 2/13/2020; Res. No. 02-2021-1705, 2/25/2021; Res. No. 02-2022-1738, 2/10/2022; Res. No. 01-2023-1772, 1/26/2023; Res. No. 01-2024-1811, 1/26/2024; Res. No. 01-2025-1843, 1/23/2025; Res. No. 01-2026-1901, 1/22/2026]
It is hereby resolved by the Board of Commissioners of the Township that all fees are hereby fixed for 2026 as follows:
ALARMS, FALSE (§ 13-306) | |||
Fourth and each subsequent false alarm per calendar year | $25 | ||
EVENTS, SPECIAL | |||
Application fee | $150 | ||
FINANCE DEPARTMENT | |||
Certifications (Water/Sewer/Trash/Municipal Liens/Fines/Assessments) | $30 per property | ||
Lien Administrative Fee | $325 per lien filed | ||
FIRE SAFETY INSPECTION | |||
The fee for a fire safety inspection is based upon a fee schedule that takes into consideration the type of occupancy, the usage, and the square footage of the facility. | |||
Commercial Properties/Multi-Residential Buildings: | |||
0 to 2,999 square feet | $80 | ||
3,000 to 5,999 square feet | $120 | ||
6,000 to 9,999 square feet | $180 | ||
10,000 to 24,999 square feet | $300 | ||
25,000 to 49,999 square feet | $450 | ||
50,000 to 99,999 square feet | $550 | ||
100,000 to 499,999 square feet | $700 | ||
>500,000 square feet | $800 | ||
Based on the square footage for the occupancy, multiple buildings in the same complex constitute a separate fire inspection. | |||
Educational/Assembly Properties: | |||
0 to 500,000 square feet | $120 | ||
>500,000 square feet | $150 | ||
Reinspection Fee (2 or more reinspections): | $60 per reinspection | ||
Failure to Comply Fee | $60 | ||
Certificate of Operation/Initial Inspection Fee (New Business) Fire Code Inspection Fee | $60 | ||
GREASE TRAPS | |||
Industrial Waste Discharge Permit | $300 | ||
Industrial Waste Permit Transfer Fee | $300 | ||
Grease Trap Installation/Repair | $50, plus state surcharge for permits | ||
HOUSING | |||
Moving Permit (§ 11-104) | $10 | ||
Rental Property Registration Fee (§ 11-205) | |||
For properties with 1 - 20 units = | $35 per unit $25 per unit if paid on or before January 31 | ||
For properties with 21 - 50 units = | $575 flat fee $550 flat fee if paid on or before January 31 | ||
For properties with 51 or more units = | $825 flat fee $800 per unit if paid on or before January 31 | ||
Annual Rental Property Registration Fee (New Registrations Only) | |||
For properties with 1 - 20 units = | $35 per unit for new registrations submitted January through June $17.50 per unit for new registrations submitted July through December | ||
For properties with 21 - 50 units = | $575 flat fee for new registrations submitted January through June $287.50 flat fee for new registrations submitted July through December | ||
For properties with 51 or more units = | $825 flat fee for new registrations submitted January through June $412.50 flat fee for new registrations submitted July through December | ||
Rental Inspection Fee | $50 per unit | ||
Rental Reinspection or Noncompliance Fee | $25 per unit/per reinspection | ||
MOTOR VEHICLES (§ 15-506) | |||
Pushcart Fees | |||
1 year | $100 | ||
6 months | $50 | ||
3 months | $25 | ||
Reclamation cost | $25 | ||
ON-LOT SEWER SYSTEMS | |||
A. | Percolation testing observed by Sewage Enforcement Officer (maximum four simultaneous tests) | $350 | |
B. | Permit and Inspection Fees | ||
Permit application and close out, complete system* | $200 | ||
Permit application and close out, new tank or tank repair* | $100 | ||
Design review, issue permit, complete system | $150 | ||
Design review, issue permit, new tanks or tank repairs | $50 | ||
Design review spray and drip systems | $200 | ||
1 inspection, in-ground systems and tanks | $200 | ||
2 inspections, mound systems | $400 | ||
Each additional inspection required | $200 | ||
C. | Other Fees | ||
Site consultation (responsibility of applicant) | $100 per hour | ||
Verify prior soil testing (responsibility of applicant) | $150 per test | ||
Other duties including meetings and planning module review | $100 per hour | ||
Well isolation distance exemption request review waiver (responsibility of applicant) | $100 per hour | ||
Complaint investigation and enforcement actions (responsibility of Township) | $100 per hour | ||
D. | *Administration fee of $50 applied when applicable | ||
1. | The Sewage Enforcement Officer is authorized to perform soil testing for sewage planning modules and to sign the false swearing statement in the module. | ||
2. | The Sewage Enforcement Officer shall provide the Township with a project summary upon completion. | ||
3. | The fee schedule applies to new and repaired septic systems. | ||
4. | All fees incurred which involve land development, require the assistance of the Township Engineer, or require additional services from the Sewage Enforcement Officer related to all on-lot sewage disposal system activities shall be reimbursed 100% by the applicant or owner of the property. | ||
PEDDLERS (§ 13-403) | |||
License fee | $50 | ||
POLE PERMIT | $15 plus $10 per pole | ||
POLICE DEPARTMENT | |||
Accident report | $15 | ||
Police report | $0.25 per page | ||
Act 22 | $75 per request | ||
SEWER | |||
Sewer services — Residential (§ 18-302) | $368 per annum ($92 per quarter) | ||
Sewer services — Nonresidential (§ 18-302) | $404.80 per annum ($101.20 per quarter) | ||
Sewer lateral testing report | $100 | ||
Sewer lateral testing report submission | $65 | ||
SHADE TREES/STREET TREES | |||
Application for removal | $50 | ||
Appeals | $250 | ||
SOLID WASTE | |||
Recycling cart lease fee | $85 per cart | ||
Refuse collector's license (§ 20-104) | $10 | ||
Household appliances with Freon pick up | $55 per item | ||
MSW services (§ 20-302) | $432 per annum ($108 per quarter) | ||
STREETS AND SIDEWALKS | |||
Street vacations | $1,500 plus $4,500 escrow | ||
Setting line and grade | $50 per linear foot, $1,000 escrow | ||
A. | Road Degradation. If the applicant seeks to excavate upon a street within seven years after the completion of paving the street, the applicant shall pay a road degradation fee to the Township based on the following: | ||
Paving Completion Time Frame | Cost Per Square Foot/Minimum Charge | ||
Greater than seven years | $0/$0 | ||
Greater than six but less than seven years | $2/$1,000 | ||
Greater than five but less than six years | $4/$2,000 | ||
Greater than four but less than five years | $8/$4,000 | ||
Greater than three but less than four years | $12.50/$6,250 | ||
Greater than two but less than three years | $15/$7,500 | ||
Greater than one but less than two years | $18/$9,000 | ||
Less than one year | $20/10,000 | ||
B. | Right-of-Way Permit Fees. | ||
Permit application fee | $65, only applicable if building or zoning permit application fee not required | ||
Excavation in a street | $100 plus escrow | ||
Excavation behind the curb | $50 plus escrow | ||
Driveway apron with curb cut | $50 plus escrow | ||
Curb ramp | $50 plus escrow | ||
Sidewalk repair or replacement without curbing | $50 plus escrow | ||
Curbing repair or replacement | $50 plus escrow | ||
Zoning review (if required) | $50 residential/$75 commercial | ||
C. | Right-of-Way Permit Escrows. (Note 1) | ||
Excavation in a street | $2,000 (up to 100 square feet of pavement restoration plus $10 per each additional square feet) | ||
Excavation behind the curb | $2,000 | ||
Driveway apron w/curb cut | $2,000 | ||
Curb ramp | $2,000 ($5,000 if survey work required by Township) | ||
Sidewalk without curbing | $2,000 first 50 feet (no survey or cutsheet required) plus $2 per additional foot, or $5,000 first 50 feet (with survey, design, cutsheet) plus $4 per additional foot | ||
Curbing | $2,000 first 50 feet (no survey or cutsheet required) plus $2 per additional foot; or 5,000 first 50 feet (with survey, design, cutsheet, inspection) plus $4 per additional foot | ||
Note 1. Escrow amounts are only noted as the initial amount posted. Should escrow need to be replenished, the amount will be determined by the Community Development Director. | |||
SUBDIVISION, LAND DEVELOPMENT, AND GRADING | |||
Grading and Development Permit | |||
Application fee | $50 | ||
Escrow deposit* | $1,000 | ||
Minor Subdivision/Lot Line Adjustment/Lot Consolidation | |||
Filing fee | $750 | ||
Resubmission fee | $300 | ||
Escrow deposit* | $4,500 | ||
Major Subdivision | |||
Filing fee | $1,200 | ||
Resubmission fee | $500 | ||
Escrow deposit* | $5,000, plus $200 per lot | ||
Land Development | |||
Filing fee | $1,000, plus $40 per acre (or part thereof) | ||
Resubmission fee | $500 | ||
Escrow deposit* | $5,000, plus $200 per dwelling unit or acre (or part thereof) whichever is greater | ||
Sketch Plan | |||
Filing fee, if public meeting is requested | $600 per submission | ||
Filing fee, if public meeting is not requested | $400 per submission | ||
Escrow deposit* | $5,000 to be credited to a subsequent preliminary or preliminary/final submission escrow | ||
Recreation Fee | |||
Recreation fee effective at time of initial grading permit, land development, or subdivision submission shall be paid prior to the recording of plans. Sketch plan submissions do not lock in recreation fee rates. | |||
Stormwater management or drainage plan review required to ensure Act 167 compliance | $500, plus $1,000 escrow, plus inspection fees | ||
Only required for building permits or other projects where a stormwater management plan or a drainage plan is required but will not be part of a subdivision or land development or a site plan. | |||
In addition to the fees listed above, the applicant is responsible for all engineering and legal fees incurred by the Township for the project, plus a 3% administration fee for residential projects and a 5% administration fee for nonresidential projects. | |||
Escrow accounts must be replenished in full within 30 days of service invoicing. Delinquent account projects will be placed on hold and no further activity, with the exception of any necessary time extensions, may take place until the applicant's account is replenished in full. | |||
* | Money in escrow is for reimbursement at the Township's discretion for any and all engineering, legal or other expenses incurred by the Township, exclusive of work performed by full-time Township staff members, in processing the sketch, preliminary and final plans. At the applicant's request upon the recording of the subdivision and land development plan with the Recorder of Deeds and the payment of all Township engineering, legal and other expenses incurred by the Township, exclusive of work performed by full-time Township staff members, the balance of the escrow will be returned. The escrow will not be returned until all invoices from the Township Engineer and Solicitor have been received by the Township and paid. The Solicitor and Engineer's invoices are submitted to the Township every 30 days. | ||
Legal fees (hourly) | |||
Township Solicitor (Firm Partner) | $205 | ||
Township Solicitor (Firm Associate) | $195 | ||
Paralegal Services | $115 | ||
Note: The cost of reimbursable expenses that are in addition to the basic services will be itemized separately. Reimbursable expenses include, but are not limited to, priority/express mail and packages; preparation or materials for electronic transfer; hand delivery of materials; reproductions; prints; and any additional insurance coverage or limits (including professional liability insurance) requested in excess of that normally carried. Reimbursables are subject to sales tax. | |||
Engineering fees (hourly) | |||
Municipal | |||
Senior Municipal Engineer | $157.50 | ||
Municipal Engineer/Planner | $144 | ||
Note: The cost of reimbursable expenses that are in addition to the basic services will be itemized separately. Professional services will be invoiced on the basis of time worked by the staff in increments of 1/4 hour. | |||
Fees for additional services available upon request. Please contact the Community Development Department. | |||
WATER | |||
Water metered rates | $0.0107 for each gallon of water | ||
Water use for building construction purposes | Flat rate of $50 per residential unit and $150 for every nonresidential permit | ||
Cut-off charge | $25 | ||
Turn-on charge | $25 | ||
Temporary flat rate | $6.25 per quarter for the 1st faucet or opening; $2 per quarter for each additional faucet or opening | ||
Fire hydrant standby charge | $400 per year | ||
BUILDING | |||
A Pennsylvania State surcharge is added to all building permits and shall be paid at the time of submission. | |||
A $65 application fee will be required with each building permit at the time of submission (only applicable if zoning or right-of-way application fee not required) and a 15% administration fee will be added to all permit and inspection fees listed on Attachment A.[1] | |||
Most building permit fees are listed on Attachment A. Additional fees are listed below. | |||
Additional Residential Fees | |||
Demolition | $50 | ||
Water line repair/replacement | $150 | ||
Sewer line repair/replacement | $150 | ||
Water tapping | $550 | ||
5/8-inch water meter | At cost from vendor | ||
1-inch water meter | At cost from vendor | ||
Larger water meters | At cost from vendor | ||
Water tap-in | $2,000 | ||
Sewer tapping | $1,600 | ||
Sewer tap-in | $2,000 | ||
Additional Non-Residential Fees | |||
Demolition | $75 | ||
Water line replacement | $310 | ||
Sewer line replacement | $310 | ||
Water tapping permit | $550 | ||
5/8-inch water meter | At cost from vendor | ||
1-inch water meter | At cost from vendor | ||
Larger water meters | At cost from vendor | ||
Water tap-in | $2,000 | ||
Sewer tapping | $1,600 | ||
Sewer tap-in | $2,000 | ||
Permit application fee | $65, only applicable if building or right-of-way permit application fee not required | ||
Plan revisions/resubmission | $35 | ||
Zoning Ordinance Book | At cost from vendor | ||
Zoning Map | At cost from vendor | ||
Appeal to Zoning Hearing Board or Board of Commissioners | |||
Special exception, nonresidential | $1,500 | ||
Special exception, residential | $1,200 | ||
Variance, nonresidential | $1,500 | ||
Variance, residential | $1,200 | ||
Conditional use, residential | $1,200 | ||
Conditional use, nonresidential | $1,500 | ||
Continuance of hearing by applicant | $225 per additional hearing | ||
Continuance of hearing by Township or Board | No cost | ||
Appeal of Zoning Officer's decision | $1,800 | ||
Curative amendment | $3,500 | ||
Challenge validity of Zoning Ordinance or Zoning Officer determination | $3,500 | ||
Application to amend Zoning Ordinance | $3,500 | ||
Original stenographic record of hearing (to be paid by requestor) | Actual cost of transcript | ||
Withdrawal of appeal to Zoning Hearing Board or Board of Commissioners | |||
Withdrawal prior to advertisement | 90% of fee refunded | ||
Withdrawal after advertisement | 25% of fee refunded | ||
[1]
Editor's Note: Attachment A is included as an attachment to this chapter.