Size
(inches)
|
Map Reprint
|
Photo Reprint
|
---|---|---|
18 x 24
|
$0.50
|
$1
|
24 x 36
|
$1.00
|
$2
|
36 x 36
|
$1.75
|
$3
|
36 x 48
|
$2.25
|
$4
|
42 x 42
|
$2.25
|
$4
|
Length beyond 48
|
$0.75 per linear foot
|
$1 per linear foot
|
Size
(inches)
|
Custom Map
|
Custom Photo
|
---|---|---|
8.5 x 11
|
$2
|
$2
|
11 x 17
|
$4
|
$4
|
18 x 24
|
$8
|
$9
|
24 x 36
|
$9
|
$10
|
36 x 36
|
$10
|
$11
|
36 x 48
|
$11
|
$12
|
42 x 42
|
$11
|
$12
|
Length beyond 48
|
$0.75 per linear foot
|
$1 per linear foot
|
Type
|
Fee (effective July 1, 2019)
|
---|---|
Rink
| |
Ice rink rental - hourly
| |
See attached pricing matrix
| |
Dry rink rental
| |
Hourly
|
$100
|
Daily
|
$1,100
|
Public skating
| |
Adult admission
|
$7
|
Student admission
|
$5
|
Senior admission
|
$2
|
Skate rental
|
$5
|
Rock night
|
$5
|
Punch cards
| |
Adult
|
$70
|
Student
|
$50
|
Senior
|
$20
|
Walk on FS
|
$100
|
Stick practice
|
$100
|
Skate sharpening
|
$60
|
Walk on ice admission
|
$10
|
Stick practice admission
|
$10
|
Skate sharpening
|
$6
|
League: Over 40 Hockey League, per team
|
$2,750
|
Learn to Skate Program*
| |
Hockey
| |
Resident
|
$95
|
Nonresident
|
$105
|
Figure skating
| |
Resident
|
$95
|
Nonresident
|
$105
|
Additional class cost
|
$90
|
*USFSA (United States Figure Skating Association) memberships
are required for all participants in these programs. Cost for annual
USFSA membership is $16.
| |
Facility
| |
HYCC memberships
| |
Membership
| |
Resident
|
$20
|
Nonresident
|
$40
|
Family membership
| |
Resident
|
$60
|
Nonresident
|
$120
|
Day pass
|
$5
|
Room rental
| |
Shepley Room*
|
$75
|
Conference Room*
|
$75
|
Sky Box*
|
$75
|
*Room rental rates for the rooms are based on a three-hour rental.
We also make the room availables in one-hour blocks and charge accordingly:
$25 per hour.
| |
Youth Center/Gym
| |
Gym rental (hourly)
| |
Full gym
|
$105
|
Half court gym
|
$65
|
Full gym, nonprofit rate
|
$80
|
Half court gym, nonprofit rate
|
$50
|
Full gym, Nonprofit rate, before 8:00 a.m. and after
9:00 p.m.
|
$65
|
Half court gym, Nonprofit rate, before 8:00 a.m.
and after 9:00 p.m.
|
$35
|
Gym rental (daily)
| |
Covered floor events
|
$1,025
|
Computer lab rental
| |
Hourly charge for computer lab
|
$60
|
Game room rental
| |
Hourly charge for game room
|
$60
|
League
| |
Summer basketball, per team
|
$616
|
Summer volleyball, per team
|
$307
|
Services Provided
|
Fee
| ||
---|---|---|---|
Field Services
| |||
Requested turn on or off
| |||
During normal working hours
|
$47.32
| ||
After normal working hours
|
$299.17
| ||
General labor rate
| |||
During normal working hours, plus materials
|
$123.09 per hour
| ||
After normal working hours, plus materials
|
$183.67 per hour
| ||
Hydrant meters, per day for every day used
|
$30.30
| ||
Labor to set hydrant meter, during normal working hours
|
$51.12
| ||
Labor to remove hydrant meter, during normal working hours
|
$51.12
| ||
Hydrant meter deposit; covers the cost of replacement of hydrant
meter. Fee will be refunded in total if meter is returned undamaged;
otherwise cost of repair or replacement will be deducted from deposit
before return.
| |||
1-inch meter
|
$500
| ||
2-inch meter
|
$3,000
| ||
Cross connection tests
| |||
First device tested
|
$102.24
| ||
Each additional device at same location, per device
|
$60.57
| ||
Cross connection survey
|
No charge
| ||
Customer requested samples
|
Sample specific fee to recover cost
| ||
Frozen meter charges (cost of parts plus 15% and labor fee)
|
$123.09 plus parts
| ||
Meter test by customer request
| |||
If meter is correct (98.5% to 101.5% normal flow accuracy
|
$102.24
| ||
If meter is deficient, prorated billing reimbursement or additional
charges will be billed.
|
No charge
| ||
Administration Services
| |||
Property transfer, real estate closing (field staff for final
meter read; office staff to change customer account and fax paperwork
to various entities)
|
$123.09
| ||
Demolition permit approval (field staff to shut off at the curb
stop and pull the meter; office staff to change customer account and
send paperwork)
|
$123.09
| ||
Returned check fee
|
$51.12
| ||
Interest on late payments (Bills for water service and related
charges are due and payable in 30 days.)
|
14%
| ||
Line backer (water service protection plan for residential customers)
|
$100.80
| ||
Hydrant fire flow tests, per set of hydrants; during working
hours. Requestor of test must supply all needed equipment
|
$204.50
| ||
Construction inspections
| |||
Small jobs, during normal working hours
|
$51.12
| ||
Large jobs
|
Developer pays for construction inspection
| ||
New water meter and radio (Ownership is transferred to the Water
System after the service activation.)
|
Cost is dependent on size of meter is the responsibility of
the new customer
| ||
Labor to set new meter and radio, during normal working hours
(Field staff to set and read the meter; office staff to set up customer
account.)
|
$123.09
| ||
Meter set and radio, materials
|
Cost is dependent on size of service and meter
| ||
New sewer deduct meter and radio
|
Cost is dependent on size of meter and is the responsibility
of the customer
| ||
Labor to set sewer deduct meter and radio, during normal working
hours (Field staff to set and read the sewer deduct meter; office
staff to set up customer account.)
|
$123.09
| ||
Sewer deduct meter set and radio, materials
|
Cost is dependent on size of service and meter
| ||
Design plan review and first resubmittal (covers initial review,
comments and resubmittal)
|
$0
| ||
Repeat reviews (covers additional review of submittal from the
third review on)
|
$5.67 per linear foot
| ||
New service system development charge
| |||
1-inch service line
|
$2,130.14
| ||
2-inch service line
|
$6,816.27
| ||
4-inch service line
|
$13,633.37
| ||
6-inch service line
|
$21,301.37
| ||
8-inch service line
|
$42,603.55
| ||
Tapping fee: a fee charged to tap into an existing water main
for a new residential development water main; instead of multiple
system development charges
|
$28,402.10
| ||
Tie-in for fire sprinkler service, per connection
| |||
1-inch line
|
$2,130.14
| ||
2-inch line
|
$6,816.27
| ||
4-inch line
|
$13,633.37
| ||
6-inch line
|
$21,301.37
| ||
8-inch line
|
$42,603.55
|
Monthly Usage Rates are per CCF (CCF = 100 cubic feet or 748
Gallons)
|
Approved Residential Rate per CCF
|
Approved Commercial Rate per CCF
|
---|---|---|
0 to 6 CCF
0 to 4,488 gallons
|
$3.55
|
$3.61
|
6 to 20 CCF
4,488 to 14,960 gallons
|
$4.07
|
$3.61
|
Over 20 CCF
Over 14,960 gallons
|
$4.62
|
$3.61
|
Meter Size
(inches)
|
Monthly Service Charge
|
---|---|
5/8
|
$15.67
|
3/4
|
$17.23
|
1
|
$39.17
|
1 1/2
|
$78.32
|
2
|
$125.32
|
3
|
$125.32
|
4
|
$125.32
|
6
|
$125.32
|
8
|
$125.32
|
10
|
$125.32
|
Improved Square Footage Block
|
Approved Monthly Charge
|
---|---|
0 to 1,000
|
$1.30
|
1,001 to 2,000
|
$3.90
|
2,001 to 4,000
|
$7.79
|
4,001 to 10,000
|
$18.18
|
10,001 to 20,000
|
$38.96
|
20,001 to 40,000
|
$77.90
|
40,001 to 599,999
|
$0.00259 per square foot
|
600,000 and up
|
$1,557.98
|
Hydrant; Sprinkler Line
|
Approved Quarterly Fee
| |
---|---|---|
Private hydrant
|
$312.48
| |
Fire sprinkler line
(inches)
| ||
4 or less
|
$111.70
| |
6
|
$324.52
| |
8
|
$691.56
| |
10
|
$1,243.61
| |
12
|
$2,008.80
|