The Watershed Inspector shall complete the first inspection for systems
requiring inspections according to this section that have not been
inspected by the authority having jurisdiction since 1990 or do not
have a stamped as-built drawing dated on/after 1990. The inspection
or stamped as built drawing must have documented the length, type
and location of absorption areas; the size, type, location and structural
integrity of the pretreatment tank; and the tie dimensions. Parcel
owners shall receive written notification by the Watershed Inspector
regarding this requirement and will work with the Watershed Inspector
to complete the inspection.