[HISTORY: Adopted by the Town Board of the Town of Sweden 2-12-2019 by L.L. No. 1-2019[1]. Amendments noted where applicable.]
GENERAL REFERENCES
Wind energy conversion systems — See Ch. 173.
Zoning — See Ch. 175.
Land use development and subdivision regulations — See Ch. A177.
[1]
Editor's Note: This local law also superseded former Ch. 174,
Solar Energy Systems and Solar Energy Farms, adopted 9-12-2017 by
L.L. No. 6-2017.
This chapter shall be referred to as "Local Law #1 of 2019 Adding Chapter 174 to the Sweden Town Code Concerning solar energy systems and Solar Energy Farms."
This chapter is adopted pursuant to the legislative authority
in Municipal Home Rule Law § 10, Town Law §§ 261
through 264, General Municipal Law §§ 96 and 119-dd
and Public Service Law Article 10.
The Town of Sweden (hereinafter referred to as Sweden) finds
that solar energy, as properly regulated, is clean, readily available
and a renewable energy source beneficial to Sweden, its residents
and the general public. Among other things, solar energy can potentially
take advantage of a safe, abundant, renewable and nonpolluting energy
resource and can also decrease the cost of energy to commercial and
residential properties. Sweden encourages the use of community choice
aggregation to partner with community solar projects as a means to
provide the benefits of solar energy directly to residents. Solar
energy can increase employment and business development in Sweden
by furthering the installation of solar energy systems and solar energy
farms. Sweden finds a growing need to properly site and regulate solar
energy systems and solar energy farms within Sweden to protect residential,
commercial, business and other areas or land uses, to preserve the
overall beauty, nature and character of Sweden, to promote the effective
and efficient use of solar energy resources and to protect the health,
safety and general welfare of the citizens of Sweden. Solar energy
systems and/or solar energy farms deplete land available for other
uses, introduce industrial usage into other nonindustrial areas and
can potentially pose environmental challenges. Solar energy systems
and/or solar energy farms need to be regulated for removal when no
longer utilized and/or useful in order to prevent environmental problems
and/or abandonment of industrial properties and/or such solar energy
systems and/or solar energy farms.
As used in this chapter, the following terms shall have the
meanings indicated herein below:
- BUILDING-INTEGRATED PHOTOVOLTAIC SYSTEM
- A combination of photovoltaic building components integrated into any building envelope system such as vertical facades, including glass and other facade material, semitransparent skylight systems, roofing materials and shading over windows for the purpose of producing electricity for on-site usage or consumption.
- GLARE
- The effect by reflections of light with intensity sufficient as determined in a commercially reasonable manner to cause annoyance, discomfort, or loss in visual performance and visibility in any material respects.
- GROUND-MOUNTED SOLAR ENERGY SYSTEM
- A solar energy system that is anchored to the ground and attached to a pole or other mounting system, detached from any other structure for the purpose of producing electricity for on-site usage or consumption, with system capacity up to 25 kW AC and that generate no more than 110% of the electricity consumed on the site over the previous 12 months.
- LARGE-SCALE SOLAR ENERGY SYSTEM
- A solar energy system that is ground-mounted and produces energy for the purpose of on-site usage or consumption with system capacity of more than 25 kW AC and that generate no more than 110% of the electricity consumed on the site over the previous 12 months.
- ROOF-MOUNTED SOLAR ENERGY SYSTEM
- A solar panel system located on the roof of any legally permitted building or structure for the purpose of producing electricity for on-site usage or consumption of any kilowatt (kw) alternating current (ac) capacity.
- SOLAR ENERGY EQUIPMENT
- Electrical energy storage devises, material, hardware, inverters or other electrical equipment and conduit of photovoltaic devices associated with the production of electrical energy.
- SOLAR ENERGY SYSTEM
- The components and subsystems required to convert solar energy into electric energy suitable for use and storage. The term includes, but is not limited to, solar panels and solar energy equipment. The area of a solar energy system includes all the land inside the perimeter of the solar energy system, which extends to any interconnection equipment.
- SOLAR FARM
- The use of land where a series of one or more solar collectors are placed in an area on a parcel of land for the purpose of generating photovoltaic power and said series of one or more solar collectors placed in an area on a parcel of land collectively has nameplate generation capacity of more than 25 kilowatts (kw) alternating current (ac) or more when operating at maximum efficiency for the purpose of off-site sale, usage and/or consumption. The term solar farm shall not be construed to include, so as to prohibit, or have the effect of prohibiting, the installation of a solar collector that gathers solar radiation as a substitute for traditional energy for water heating, active space heating and cooling, passive heating or generating electricity for a residential property. The term solar farm shall also not be construed in such a way as to prohibit the installation or mounting of a series of one or more solar collectors upon the roofs of residential and/or commercial structures regardless of whether said series of one or more solar collectors collectively has a total nameplate generation more than 25kW AC when operating at maximum efficiency.
- SOLAR PANEL
- A photovoltaic device capable of collecting and converting solar energy into electrical energy.
The requirements of this chapter shall apply to all solar energy systems and/or solar energy farms proposed, installed, operated, maintained, modified or constructed in any Sweden district after the effective date, excluding general maintenance and repair and/or building-integrated photovoltaic systems, with the proviso that same conforms with noise and glare regulations contained in Sweden Town Code § 175-46G(4).
A.
Roof-mounted solar energy systems.
(1)
Roof-mounted solar energy systems that use the electricity on-site
are permitted as an accessory use in all zoning districts when attached
to any lawfully permitted building or structure. A building permit
shall be required for installation of all roof-mounted systems and
shall be exempt from site plan review under the local zoning code
or other land use regulations subject to the requirements set forth
in this section.
(2)
Height. Solar energy systems shall not exceed the maximum height
restrictions of the zoning district within which they are located
and are provided the same height exemptions granted to building-mounted
mechanical devices or equipment.
(3)
Aesthetics. Roof-mounted solar energy system installations shall
incorporate, when feasible, the following design requirements: Panels
on angled roofs must be mounted at the same angle as the roof's
surface with a maximum distance of eight inches between the roof and
highest edge of the system and not extend beyond the highest point
of the roof system.
(4)
Solar panels on flat roofs shall not extend above the top of the
surrounding parapet, or more than 24 inches above the flat surface
of the roof, whichever is higher.
B.
Ground-mounted solar energy systems.
(1)
Ground-mounted solar energy systems that use the electricity on-site
are permitted as accessory structures in Sweden in all zoning districts.
A building permit shall be required for installation of all ground-mounted
solar energy systems and shall be exempt from site plan review under
the local zoning code or other land use regulation subject to the
requirements set forth in this section.
(2)
Height and setback. Ground-mounted solar energy systems shall adhere to the height and setback requirements set forth herein. All ground-mounted panels shall not exceed 12 feet in height. Setback requirements of the underlying zoning districts shall be pursuant to the applicable provisions of the Sweden Town Code including Sweden Town Code, Chapter 175.
(3)
Lot coverage. A ground-mounted solar energy system shall not exceed
80% of the lot on which it is installed. The lot coverage percentage
used by any ground-mounted solar energy system shall include all aspects
necessary or required for the system (i.e., fences, shrubbery, roadways,
and parking) and said percentage shall be in conformity with any Sweden
Town Code regulations concerning same including zoning regulations.
(4)
All such systems shall be installed on the side or rear portion of
the subject property or adjacent to, either behind or along the side
of any lawfully permitted building or structure.
A.
Large-scale solar energy systems are permitted through approval by the Sweden Planning Board, subject to the requirements set forth in this section. Any request to install a large scale ground-mounted solar energy system on property zoned residential, commercial, or industrial must either be done by appropriate application to the Sweden Planning Board, or alternatively through a request for incentive zoning, all pursuant to the applicable provisions of the Sweden Town Code including Sweden Town Code, Chapter 175.
(1)
Thereafter, after appropriate review by said Board, appropriate review
action, approval, conditional approval and/or denial can be made.
B.
Application requirements. For any application, same shall include
the following:
(1)
If the property of the proposed project is to be leased, legal consent
between all parties, specifying the use(s) of the land for the duration
of the project, including easements and other agreements, shall be
submitted.
(2)
Blueprints showing the layout of the solar energy system signed by
a professional engineer or registered architect shall be required.
(3)
The equipment specification sheets shall be documented and submitted
for all photovoltaic panels, significant components, mounting systems
and inverters that are to be installed.
(4)
Property operations and maintenance plan. Such plan shall describe
continuing photovoltaic maintenance property upkeep such as mowing
and trimming.
C.
Application standards.
(1)
Height and setback. Large-scale solar energy systems shall adhere
to the height and setback requirements of the underlying zoning district
except as follows herein. Any large-scale solar energy systems that
are ground-mounted shall not exceed a height of 12 feet. The retail
business/airport/commercial and/or recreational front setback shall
be 75 feet, the rear setback shall be 25 feet and the side setback
shall be 25 feet. The residential and light industrial front setbacks
shall be 100 feet, the rear and side setbacks shall be 200 feet when
abutting residential property and shall be 100 feet when abutting
business commercial zones. Otherwise, the foregoing setback requirements
are in conformity with the Sweden Town Code and all height measurements
are to be calculated when the solar energy system is oriented at maximum
tilt.
(2)
Lot size. Large-scale solar energy systems shall be located on lots
with a minimum lot size of 10 acres.
(3)
Lot coverage. A large-scale solar energy system that is ground-mounted
shall not exceed 80% of the lot size on which it is installed. The
lot coverage percentage used by any ground-mounted solar energy system
shall include all aspects necessary or required for the system (i.e.,
fences, shrubbery, roadways, and parking) and said percentage shall
be in conformity with any Sweden Town Code regulations concerning
same including zoning regulations.
(4)
All large-scale energy systems shall be enclosed by fencing to prevent
unauthorized access. Warning signs with the owner's contact information
shall be placed on the entrance and perimeter of the fencing. The
type of fencing shall be determined by the Sweden Planning Board.
The fencing and the system shall be further screened by any landscaping
needed to avoid adverse aesthetic impacts.
(5)
All applications shall meet any substantive provisions contained
in local site plan requirements and the zoning code that, in the judgment
of the Sweden Planning Board, are applicable to the system being proposed.
If none of the site plan requirements are applicable, said Board may
waive the requirement for site plan review.
(6)
A building permit shall be required for all large-scale solar systems
before construction begins.
A.
The requirements of this section are established for the purpose
of allowing the development of solar farms in Sweden and to provide
standards for the placement, design, construction, operation, monitoring,
modification and removal of these systems.
B.
Solar farms are permitted through application and approval by the Sweden Town Planning Board, or alternatively through a request for incentive zoning to the Sweden Town Board, all pursuant to the applicable provisions of the Sweden Town Code including Sweden Town Code, Chapter 175, subject to the requirements set forth in this section. Thereafter, after appropriate review by said Board, appropriate review action, approval, conditional approval and/or denial can be made.
C.
Application requirements. For any application, the same shall include
the following:
(1)
Blueprints or drawings of the solar photovoltaic installation signed
by a licensed professional engineer or requested architect showing
the proposed layout of the system and any potential shading from nearby
structures.
(2)
Proposed changes to the landscape of site, grading, vegetation clearing
and planting, exterior lighting, screening vegetation or structures.
Additionally, any vegetation clearing can or may be considered to
be a negative impact depending upon the scope of same as well as wetland
encroachment.
(3)
A description of the solar farm facility and the technical, economic
and other reasons for the proposed location and design shall be prepared
and signed by a licensed professional engineer or registered architect
that the solar farm complies with all applicable federal and state
laws.
(4)
One or three phase line electrical diagram detailing the solar farm
layout, solar collector installation, associated components, and electrical
interconnection methods, with all National Electrical Code compliant
disconnects and over-current devices.
(5)
Documentation of the major system components to be used, including
the PV panels, mounting system and inverter.
(6)
An operation and maintenance plan which shall include measures for
maintaining safe access to the installation, storm water controls,
as well as general procedures for operational maintenance of the installation.
(7)
Information on noise (inverter) and reflectivity/glare of solar panels
and identification of potential impacts to abutters.
(8)
If the property of the proposed project is to be leased, legal consent
between all parties, specifying the use(s) of the land for the duration
of the project, including easements, leases and other agreements shall
be submitted.
D.
In addition to any site plan approval required by the Sweden Planning
Board herein, a special use permit is required for a solar farm. The
development shall conform to the following standards which shall be
regarded as minimum requirements.
(1)
Solar farms shall be on a parcel of not less than 10 acres.
(2)
Solar farms shall adhere to the height and setback requirements of
the underlying zoning district except as follows herein. Any solar
farms that are ground-mounted shall not exceed a height of 12 feet.
The retail business/airport/commercial and/or recreational front setback
shall be 75 feet, the rear setback shall be 25 feet and the side setback
shall be 25 feet. The residential and light industrial front setbacks
shall be 100 feet, the rear and side setbacks shall be 200 feet when
abutting residential property and shall be 100 feet when abutting
business commercial zones. Otherwise, the foregoing setback requirements
are intended to be in conformity with the Sweden Town Code and all
height measurements are to be calculated when the solar farm is oriented
at maximum tilt.
(3)
All mechanical equipment on a solar farm, including any structure
for batteries or storage cells, are completely enclosed by a minimum
eight-foot-high fence with a self-locking gate.
(4)
The total surface area of all ground-mounted and freestanding solar
collectors, including solar voltaic cells, panels and arrays, shall
not exceed 80% of the total parcel area.
(5)
The installation of a vegetated perimeter buffer to provide year-round
screening of the system from adjacent properties.
(6)
Because of neighborhood characteristics and topography, the Sweden
Planning Board shall examine the proposed location on a case by case
basis, ensuring that the potential impact to its residents, business
or traffic are not a detriment.
(7)
All solar energy production systems shall be designed and located
in order to prevent reflective glare toward any habitable buildings,
as well as streets and rights-of-way.
(8)
All onsite utility and transmission lines shall be, to the extent
feasible, placed underground.
(9)
The installation of a clearly visible warning sign concerning voltage
shall be placed at the base of all pad-mounted transformers and substations.
(10)
The system shall be designed and situated to be compatible with
the existing uses on adjacent and nearby properties.
(11)
All solar energy system components shall conform with setback
requirements set forth in the Sweden Town Code for the particular
district.
(12)
Solar modular panels shall not release hazardous materials.
(13)
All appurtenant structures, including but not limited to equipment
shelters, storage facilities, transformers and substations shall be
architecturally compatible with each other and shall be screened from
the view of persons not on the parcel.
(14)
Lighting of solar farms shall be consistent with all state and
federal laws. Lighting of appurtenant structures shall be limited
to that required for safety and operational purposes and shall be
reasonably shielded from abutting properties. Where feasible, lighting
of the solar photovoltaic installation shall be directed downward
and shall incorporate full cutoff fixtures to reduce light pollution.
(15)
There shall be no signs except announcement signs, such as "no
trespassing" signs, or any signs required to warn of danger. A sign
is required that identifies the owner and operator with an emergency
telephone number where the owner and operator can be reached on a
twenty-four-hour basis. Any signage laws, regulations and/or ordinances,
including the National Electrical Code and/or Emergency Services,
shall prevail over the requirements contained in the previous two
sentences of this subsection in the event that a conflict between
same arises.
(16)
There shall be a minimum of one parking space to be used in
connection with the maintenance of the solar photovoltaic facility
and the site. However, it shall not be used for the permanent storage
of vehicles.
(17)
A building permit shall be required for all solar farms before
construction begins.
E.
The following additional conditions shall apply to solar farms:
(1)
The solar farm owner or operator shall provide a copy of the project
summary, electrical schematic and site plan to the Sweden Fire Marshal.
Upon request, the owner or operator shall cooperate with all local
emergency services in developing an emergency response plan. All means
of shutting down the solar farm facility shall be clearly marked.
The owner or operator shall identify a responsible person for public
inquiries through the life of the installation.
(2)
No solar farm shall be approved or constructed until satisfactory
evidence has been provided that the utility company operating the
electrical grid where the installation is to be located has authorized
the interconnected customer-owner generator.
(3)
A solar farm owner or operator shall maintain the facility in good
condition. Maintenance shall include, but not be limited to, painting,
structural repairs and integrity of security measures. Site access
shall be maintained to a level acceptable to the Sweden Fire Marshall
and emergency services. The owner or operator shall be responsible
for the cost of maintaining the solar farm and any access road(s),
unless same is accepted as a public way.
A.
Any large-scale solar energy system and/or solar farm shall be considered
abandoned after six months without electrical energy generation and
must be removed from the property. Applications for extensions subsequent
to such an abandonment as described in the previous sentence can be
reviewed by the Sweden Planning Board for a period of up to six months
after such abandonment.
B.
All applications for any large-scale solar energy system and/or solar
farm shall include and be accompanied by a decommissioning plan to
be implemented upon abandonment and/or in conjunction with the removal
of same and shall:
(1)
Include an affirmative obligation and acknowledgement that after
any large-scale solar energy system and/or solar farm can no longer
be used it shall be removed by the applicant and/or any subsequent
owner.
(2)
Demonstrate how the removal of all infrastructure and the remediation
of soil and vegetation shall be conducted to return the parcel to
its original state prior to construction.
(3)
Include an expected timeline for execution and completion.
(4)
Include a detailed cost estimate detailing the projected expense
of executing the decommissioning plan to be prepared and signed by
a professional engineer or registered architect.
(5)
Obligate the owner, operator and/or successors in interest to remove
any ground-mounted solar collectors which have reached the end of
their useful life or have been abandoned, physically remove the installation
no more than six months after the date of discontinued operations
and also notify Town of Sweden by certified mail of the proposed date
of discontinued operations and the plans for removal.
(6)
An obligation to physically remove all ground-mounted solar collectors,
structures, equipment, security barriers and transmission lines from
the site.
(7)
Include an obligation to dispose of all solid and hazardous waste
in accordance with local, state and federal waste disposal regulations.
C.
Absent notice of a proposed date of decommissioning and written notice of extenuating circumstances, any large-scale solar energy system and/or any solar energy farm shall be considered abandoned when it fails to operate (as set forth in Subsection A of this section) for more than six months without the written consent of the Town of Sweden. If the owner or operator of any large-scale solar energy system and/or any solar farm fails to remove the installation in accordance with the requirements of this section within six months of abandonment or the proposed date of decommissioning, Sweden may enter the property and physically remove the installation upon application to a court of appropriate jurisdiction to obtain access to said property for that purpose.
D.
In the event that an application is approved for a solar farm, the
Town of Sweden shall require that the applicant and/or property owner
provide or establish a bond, surety bond, financial deposit, undertaking,
financial escrow and/or other financial security, the amount, substance
and character of which is to be determined by and at the sole discretion
of said Board, the spirit and intent of same being to ensure that
sufficient funds are available to remove the installation and restore
landscaping consistent with the best interests of the landowner and/or
Sweden in the event the applicant fails to comply with its decommissioning
obligations with same to be annually reviewed for financial sufficiency
(with any decision relating to continued financial sufficiency also
to be in the sole discretion of said Board). As a part of the foregoing
review process, an owner or operator shall provide financial documentation,
financial statements or any other information requested by said Board
on an annual basis. Sweden reserves the right to request reasonable
access to the property upon notice and consent.
Any violation of this chapter shall be subject to the same civil
and criminal penalties provided for in the Sweden Town Code (including
any applicable zoning regulations) and/or the Laws of the State of
New York.
If any clause, sentence, paragraph, subdivision, section or
part of this chapter, or the application thereof to any person, individual,
firm or corporation, or circumstance, shall be adjudged by a court
of competent jurisdiction to be invalid or unconstitutional, such
order or judgment shall not affect impair or invalidate the remainder
thereof, but shall be confined in its operation to the clause, sentence,
paragraph, subdivision, section or part of this chapter, or in its
application to the person, individual, firm or corporation, or circumstance,
directly involved in the controversy in which said order or judgment
shall be rendered.
This chapter shall take effect upon the date it is filed in
the Office of the New York State Secretary of State in accordance
with the Municipal Home Rule Law § 27.