Clearing and grubbing shall conform to Form 814 and its successors.
Roadway excavation and formation of embankment shall conform
to Form 814 and its successors.
Trench excavation shall conform to Form 814 and its successors.
Preparation of subgrade shall conform to Form 814 and its successors.
No processed stone or bank-run gravel shall be placed on the prepared
subgrade until the First Selectman or his agent has approved the condition
of the subgrade.
Slopes shall conform to Form 814 and its successors. Earth slopes
shall be a minimum of 2:1 ratio and subject to inspection and approval
prior to placement of topsoil. Slopes shall be loamed to a minimum
depth of four inches, fertilized and seeded with a satisfactory grass
seed mixture and mulched.
For requirements regarding process stone/bank-run gravel, reference
the Town of Newtown Street Classification and Design Standards.
Gravel fill shall conform to Form 814 and its successors.
The wearing surface will be bituminous concrete pavement, constructed
in two courses to the thicknesses as indicated in the Town of Newtown
Street Classification and Design Standards. No surfacing shall be
installed until adequate compaction of the subbase and base course
has taken place. Where required by the Town Engineer, field density
tests of the subbase shall be performed at the subbase and shall be
performed at the owner's expense. These tests shall be done in
locations designated by the Town Engineer or First Selectman's
agent by a qualified testing laboratory or professional engineer.
The results of said tests shall indicate the percentage of maximum
dry density achieved and shall be based on modified Proctor density.
The first course of bituminous concrete pavement may not be placed
until approval has been received from the Town Engineer or First Selectman's
agent. In all cases, the first course of pavement shall weather at
least one full winter (November 1 through March 31) in place. The
final wearing surface shall be placed only at the discretion of the
Town Engineer or First Selectman's agent, only after all patches
and repairs have been made to the base course as directed. In no case
shall bituminous concrete be placed after November 1, unless specific
written approval has been granted by the Town Engineer or First Selectman's
agent.
Where bridges are to be built, they shall be designed satisfy
the requirements of H-20 wheel loading and the applicable section
of Form 814 and its successors. Drawings and design calculations shall
be submitted to the First Selectman and shall be certified by a professional
engineer, registered in the State of Connecticut.
Upon suspension or completion of any work under permit, the
owner shall remove from all public or private property all temporary
structures, tools and equipment, rubbish or waste materials resulting
from his operation. All ditches shall be filled and all sewers, drains,
catch basins, manholes cleaned and flushed. Streets, walks, curbs
and other structures shall be cleaned, repaired and the entire work
area left in a neat and clean condition.
In case of conflict on any of the specifications contained herein,
the ruling of the First Selectman shall be deemed final.
When guide rails are required by the Town Engineer, they must
be in place before issuance of the first building permit for the lots
in an approved subdivision.