[Ord. No. 1-2011, 5/10/2011]
For any of the activities regulated by this chapter and not eligible for the exemptions provided in §
23-302, the final approval of subdivision and/or land development plans, the issuance of any building or occupancy permit, or the commencement of any land disturbance activity may not proceed until the applicant has received written approval of an SWM site plan from the municipality.
[Ord. No. 1-2011, 5/10/2011]
1. The SWM site plan and SWM site report shall consist of all applicable
calculations, maps, and plans. All SWM site plan materials shall be
submitted to the municipality in a format that is clear, concise,
legible, neat and well-organized; otherwise, the SWM site plan shall
be rejected.
2. Appropriate sections from Chapter
22, Subdivision and Land Development, and other applicable local ordinances shall be followed in preparing the SWM site plan.
A. The SWM site plan shall include, but not be limited to:
(1)
Plans shall be of one size and in a form that meets the requirements
for recording in the Office of the Recorder of Deeds of Butler County;
(a)
Plans for tracts of less than 20 acres shall be drawn at a scale
of one inch equals no more than 50 feet;
(b)
Plans for tracts of 20 acres or more shall be drawn at a scale
of one inch equals no more than 100 feet;
(c)
Lettering shall be drawn to a size to be legible if the plans
are reduced to 1/2 size.
(2)
The name of the development; name and location address of the
property site; name, address, and telephone number of the applicant/owner
of the property; and name, address, telephone number, e-mail address,
and engineering seal of the individual preparing the SWM site plan.
(3)
The date of submission and dates of all revisions.
(4)
A graphical and written scale on all drawings and maps.
(5)
A North arrow on all drawings and maps.
(6)
A location map at a minimum scale of one inch equals 1,000 feet
and illustrates the project relative to highways, municipalities or
other identifiable landmarks.
(7)
Metes and bounds description of the entire tract perimeter.
(8)
Existing and final contours at intervals:
(a)
Slopes less than 5%: no greater than one foot;
(b)
Slopes between 5% and 15%: no greater than two feet;
(c)
Steep slopes (greater than 15%), five-foot contour intervals
may be used.
(9)
Perimeters of existing waterbodies within the project area including
stream banks, lakes, ponds, springs, field-delineated wetlands or
other bodies of water, sinkholes, flood hazard boundaries (FEMA-delineated
floodplains and floodways), areas of natural vegetation to be preserved,
the total extent of the upstream area draining through the site, and
overland drainage paths. In addition, any areas necessary to determine
downstream impacts, where required for proposed stormwater management
facilities, must be shown.
(10)
The location of all existing and proposed utilities, on-lot
wastewater facilities, water supply wells, sanitary sewers, and water
lines on and within 50 feet of property lines including inlets, manholes,
valves, meters, poles, chambers, junction boxes, and other utility
system components.
(11)
A key map showing all existing man-made features beyond the
property boundary that may be affected by the project.
(12)
Soil names and boundaries with identification of the hydraulic
soil group classification, including rock outcroppings.
(13)
Proposed impervious surfaces (structures, roads, paved areas,
and buildings), including plans and profiles of roads and paved areas
and floor elevations of buildings.
(14)
Existing and proposed land use(s).
(15)
Horizontal alignment, vertical profiles, and cross sections
of all open channels, pipes, swales and other BMPs.
(16)
The location and clear identification of the nature of permanent
stormwater BMPs.
(17)
The location of all erosion and sedimentation control facilities,
shown on a separate plan from the SWM site plan (typically an E&S
plan).
(18)
A minimum twenty-foot-wide access easement around all stormwater
management facilities that would provide ingress to and egress from
a public right-of-way. In lieu of providing an easement to the public
right-of-way, a note may be added to the plan granting the municipality
or its designees access to all easements via the nearest public right-of-way.
(19)
Construction details for all drainage and stormwater BMPs.
(21)
Identification of short-term and long-term ownership, operations,
and maintenance responsibilities.
(22)
Notes and Statements.
(a)
A statement, signed by the landowner, acknowledging that the
stormwater BMPs are fixtures that cannot be altered or removed without
prior approval by the municipality.
(b)
A statement referencing the operation and maintenance (O&M)
agreement and stating that the O&M agreement is part of the SWM
site plan.
(c)
A note indicating that record drawings will be provided for
all stormwater facilities prior to occupancy, or the release of the
surety bond.
(d)
The following signature block for the registered professional
preparing the stormwater management plan:
"I, __________, hereby certify that the Stormwater Management
Plan meets all design standards and criteria of Forward Township's
Stormwater Management Ordinance."
(e)
The following signature block for the Municipal Engineer reviewing
the stormwater management plan:
"I, __________, have reviewed this Stormwater Management Plan
in accordance with the Design Standards and Criteria of the Forward
Township's Stormwater Management Ordinance."
B. The SWM site report shall
include, but not be limited to:
(1)
General data, including:
(b)
Project location (address of the property site).
(c)
Name, address, and telephone number of the applicant/owner of
the property.
(d)
Name, address, telephone number, e-mail address, and engineering
seal of the individual preparing the SWM site report.
(e)
Dates of submission and revisions.
(2)
Project description narrative that clearly discusses the project
and provides the following information, where applicable:
(a)
Narrative.
1)
Statement of the regulated activity describing what is being
proposed. Overall stormwater management concept with description of
permanent stormwater management techniques, including construction
specifications and materials to be used for stormwater management
facilities.
2)
Expected project schedule.
3)
Location map showing the project site and its location relative
to release rate districts.
4)
Detailed description of the existing site conditions, including
a site evaluation completed for projects proposed in areas of carbonate
geology or karst topography, and other environmentally sensitive areas
such as brownfields.
5)
Total site area, pre and post, which must be equal or have an
explanation as to why they are not.
6)
Total site impervious area.
8)
Number and description of stormwater management facilities.
11) Whether site is a water quality sensitive (WQS)
development.
12) Whether site is in a defined sensitive area.
13) Types of water quality and recharge systems used,
if applicable.
14) Complete hydrologic, hydraulic, and structural
computations for all stormwater management facilities.
15) A written maintenance plan for all stormwater features,
including detention facilities and other stormwater management elements.
16) Identification of ownership and maintenance responsibility
for all permanent stormwater management facilities.
17) Other pertinent information, as required.
(b)
Summary Tables.
1)
Predevelopment hydrologic soil group (HSG) assumptions, curve
numbers (CN), computation of average slope, hydraulic length, computed
time of concentration.
2)
Existing conditions runoff volume and peak rate of runoff, post-development
runoff volume and peak rate of runoff, undetained areas, areas to
ponds.
3)
Land use for each subarea.
4)
Hydrologic soil group (HSG) assumptions, curve numbers (CN).
5)
Time of concentration computed for each subarea.
6)
Post-development peak rate of runoff routed to ponds and out.
7)
Pond maximum return period design data, including maximum water
surface elevation, berm elevation, and emergency spillway elevation.
8)
Water quality depth and volume requirements.
(c)
Calculations.
1)
Complete hydrologic, hydraulic and structural computations,
calculations, assumptions, and criteria for the design of all stormwater
BMPs.
2)
Details of the berm embankment and outlet structure indicating
the embankment top elevation, embankment side slopes, top width of
embankment, emergency spillway elevation, perforated riser dimensions,
pipe barrel dimensions and dimensions and spacing of anti-seep collars.
3)
Design computations for the control structures (pipe barrel
and riser, etc).
4)
A plot or table of the stage-storage (volume vs. elevation)
and all supporting computations.
(d)
Drawings.
1)
Drainage area maps for all watersheds and inlets depicting the
time of concentration path for both existing conditions and the post-developed
condition.
2)
All stormwater management facilities must be located on a plan
and described in detail, including easements and buffer boundaries.
(3)
Reports that do not clearly indicate the above information may
be rejected for review by the municipality and will be returned to
the applicant.
(4)
Description of, justification of, and actual field results for
infiltration testing with respect to the type of test and test location
for the design of infiltration BMPs.
(5)
The effect of the project (in terms of runoff volumes, water
quality, and peak flows) on surrounding properties and aquatic features
and on any existing municipal stormwater collection system that may
receive runoff from the project site.
(6)
Description of the proposed changes to the land surface and
vegetative cover, including the type and amount of impervious area
to be added.
(7)
Identification of short-term and long-term ownership, operation,
and maintenance responsibilities as well as schedules and costs for
inspection and maintenance activities for each permanent stormwater
or drainage BMP, including provisions for permanent access or maintenance
easements.
C. Supplemental information to be provided prior to recording of the
SWM site plan, as applicable:
(1)
Signed and executed operations and maintenance agreement (Appendix
A).
(2)
Signed and executed easements, as required for all on-site and
off-site work.
(3)
An erosion and sedimentation control plan and approval letter
from the Butler County Conservation District.
(5)
Permits from PADEP and ACOE.
(7)
Soils investigation report, including boring logs, compaction
requirements, and recommendations for construction of detention basins.
(8)
A highway occupancy permit from PennDOT when utilization of
a PennDOT storm drainage system is proposed or when proposed facilities
would encroach onto a PennDOT right-of-way.
[Ord. No. 1-2011, 5/10/2011]
1. The applicant shall submit the SWM site plan and report for the regulated
activity.
2. Five copies of the SWM site plan and report shall be submitted and
be distributed as follows:
A. Two copies to the municipality accompanied by the requisite executed
review fee reimbursement agreement, as specified in this Part.
B. One copy to the Municipal Engineer.
C. One copy to the Butler County Planning Department.
D. One copy to the Butler County Conservation District.
3. Additional copies shall be submitted as requested by the municipality
or PADEP.
[Ord. No. 1-2011, 5/10/2011]
1. The municipality shall require receipt of a complete SWM site plan
and report as specified in this Part. The municipality shall review
the SWM site plan and report for consistency with the purposes, requirements,
and intent of this Part.
2. The municipality shall not approve any SWM site plan and report that
is deficient in meeting the requirements of this Part. At its sole
discretion and in accordance with this Part, when an SWM site plan
and report is found to be deficient, the municipality may disapprove
the submission and require a resubmission, or in the case of minor
deficiencies, the municipality may accept submission of modifications.
3. The municipality shall notify the applicant, in writing, within 45
calendar days whether the SWM site plan and report is approved or
disapproved if the SWM site plan and report is not part of a subdivision
or land development plan. If the SWM site plan and report involves
a subdivision or land development plan, the timing shall following
the subdivision and land development process according to the Municipalities
Planning Code.
4. The Municipal Building Permit Office shall not issue a building permit
for any regulated activity if the SWM site plan and report has been
found to be inconsistent with this Part, as determined by the municipality.
All required permits from PADEP must be obtained prior to issuance
of a building permit.
[Ord. No. 1-2011, 5/10/2011]
A modification to a submitted SWM site plan and report for a
development site that involves a change in stormwater management facilities
or techniques, or that involves the relocation or redesign of stormwater
management facilities, or that is necessary because soil or other
conditions are not as stated on the SWM site plan as determined by
the municipality, shall require a resubmission of the modified SWM
site plan in accordance with this Part.
[Ord. No. 1-2011, 5/10/2011]
A disapproved SWM site plan and report may be resubmitted with
the revisions addressing the municipality's concerns documented, in
writing, to the municipality in accordance with this Part. The applicable
municipal review fee must accompany a resubmission of a disapproved
SWM site plan and report.
[Ord. No. 1-2011, 5/10/2011]
The municipality's approval of an SWM site plan and report authorizes
the regulated activities contained in the SWM site plan for a maximum
term of validity of five years following the date of approval. The
municipality may specify a term of validity shorter than five years
in the approval for any specific SWM site plan. Terms of validity
shall commence on the date the municipality signs the approval for
an SWM site plan. If stormwater management facilities included in
the approved SWM site plan have not been constructed, or if a record
drawing of these facilities has not been approved within this time,
then the municipality may consider the SWM site plan disapproved and
may revoke any and all permits or approvals.
[Ord. No. 1-2011, 5/10/2011]
1. The applicant shall be responsible for providing record drawings
of all stormwater BMPs included in the approved SWM site plan. The
record drawing and an explanation of any discrepancies with the approved
SWM site plan shall be submitted to the municipality as a prerequisite
for the release of the guarantee or issuance of an occupancy permit.
2. The record drawing shall include a certification of completion signed
by a qualified professional verifying that all permanent stormwater
BMPs have been constructed according to the approved SWM site plan
and report.
A. Drawings shall show all approved revisions and elevations and inverts
to all manholes, inlets, pipes, and stormwater control facilities.
B. Submission shall include a comparison of the constructed stage-storage
(volume vs. elevation) of all aboveground and below-ground stormwater
storage facilities to the approved design.
3. After receipt of the record drawing and certification of completion
by the municipality, the municipality may conduct a final inspection.