The following minimum standards shall apply for all construction
and development proposed within any identified floodplain area:
A. Fill. Within any designated floodplain area, the use of fill shall be prohibited. If a variance is obtained in accordance with the criteria in Article
VII, fill shall:
(1) Extend laterally at least 15 feet beyond the building line from all
points;
(2) Consist of soil or small rock materials only; sanitary landfills
shall not be permitted;
(3) Be compacted to provide necessary permeability and resistance to
erosion, scouring, or settling;
(4) Be no steeper than one vertical to three horizontal feet unless substantiated
data justifying steeper slopes are submitted to, and approved by,
the Floodplain Administrator; and
(5) Be used to the extent to which it does not adversely affect adjacent
properties.
B. Drainage facilities. Storm drainage facilities shall be designed
to convey the flow of stormwater runoff in a safe and efficient manner.
The system shall ensure proper drainage along streets, and provide
positive drainage away from buildings. The system shall also be designed
to prevent the discharge of excess runoff onto adjacent properties.
C. Water and sanitary sewer facilities and systems.
(1) All new or replacement water supply and sanitary sewer facilities
and systems shall be located, designed and constructed to minimize
or eliminate flood damages and the infiltration of floodwaters.
(2) Sanitary sewer facilities and systems shall be designed to prevent
the discharge of untreated sewage into floodwaters.
(3) No part of any on-site waste disposal system shall be located within
any identified floodplain area except in strict compliance with all
state and local regulations for such systems. If any such system is
permitted, it shall be located so as to avoid impairment to it, or
contamination from it, during a flood.
(4) The design and construction provisions of the UCC and FEMA No. 348,
"Protecting Building Utilities From Flood Damages" and the "International
Private Sewage Disposal Code" shall be utilized.
D. Other utilities. All other utilities such as gas lines, electrical
and telephone systems shall be located, elevated (where possible)
and constructed to minimize the chance of impairment during a flood.
E. Streets. The finished elevation of all new streets shall be no less
than one foot below the regulatory flood elevation.
F. Storage. All materials that are buoyant, flammable, explosive, or, in times of flooding, could be injurious to human, animal, or plant life, and not listed in §
83-27, Development which may endanger human life, shall be stored at or above the regulatory flood elevation or floodproofed to the maximum extent possible.
G. Placement of buildings and structures. All buildings and structures
shall be designed, located, and constructed so as to offer the minimum
obstruction to the flow of water and shall be designed to have a minimum
effect upon the flow and height of floodwater.
H. Anchoring.
(1) All buildings and structures shall be firmly anchored in accordance
with accepted engineering practices to prevent flotation, collapse,
or lateral movement.
(2) All air ducts, large pipes, storage tanks, and other similar objects
or components located below the regulatory flood elevation shall be
securely anchored or affixed to prevent flotation and waterproofed.
I. Floors, walls and ceilings.
(1) Wood flooring used at or below the regulatory flood elevation shall
be installed to accommodate a lateral expansion of the flooring, perpendicular
to the flooring grain without causing structural damage to the building.
(2) Plywood used at or below the regulatory flood elevation shall be
of a marine or water-resistant variety.
(3) Walls and ceilings at or below the regulatory flood elevation shall
be designed and constructed of materials that are water-resistant
and will withstand inundation.
(4) Windows, doors, and other components at or below the regulatory flood
elevation shall be made of metal or other water-resistant material.
J. Paints and adhesives.
(1) Paints and other finishes used at or below the regulatory flood elevation
shall be of marine or water-resistant quality.
(2) Adhesives used at or below the regulatory flood elevation shall be
of a marine or water-resistant variety.
(3) All wooden components (doors, trim, cabinets, etc.) used at or below
the regulatory flood elevation shall be finished with a marine or
water-resistant paint or other finishing material.
K. Electrical components.
(1) Electrical distribution panels shall be at least three feet above
the base flood elevation.
(2) Separate electrical circuits shall serve lower levels and shall be
dropped from above.
L. Equipment. Water heaters, furnaces, air-conditioning and ventilating
units, and other electrical, mechanical or utility equipment or apparatus
shall not be located below the regulatory flood elevation.
M. Fuel supply systems. All gas and oil supply systems shall be designed
to prevent the infiltration of floodwaters into the system and discharges
from the system into floodwaters. Additional provisions shall be made
for the drainage of these systems in the event that floodwater infiltration
occurs.
N. Uniform Construction Code coordination. The standards and specifications
contained in 34 Pa. Code (Chapters 401-405), as amended, and not limited
to the following provisions, shall apply to the above and other sections
and subsections of this chapter to the extent that they are more restrictive
and supplement the requirements of this chapter.
(1) International Building Code (IBC) 2009 or the latest edition thereof:
Sections 801, 1202, 1403, 1603, 1605, 1612, 3402, and Appendix G.
(2) International Residential Building Code (IRC) 2009 or the latest
edition thereof: Sections R104, R105, R109, R323, Appendix AE101,
Appendix E and Appendix J.
All subdivision proposals and development proposals in identified floodplain A Area (refer to §
83-20C) where base flood elevation data are not available shall be supported by hydrologic and hydraulic engineering analyses that determine base flood elevations and floodway information. The analyses shall be prepared by a licensed professional engineer in a format required by FEMA for a conditional letter of map revision or letter of map revision. Submittal requirements and processing fees shall be the responsibility of the applicant.
Recreational vehicles in Zones A and AE must either be:
A. On the site for fewer than 180 consecutive days; or
B. Fully licensed and ready for highway use.