This schedule is subject to amendment by Council order.
Code Chapter/Section | Fee | Amendment Dates | |||
|---|---|---|---|---|---|
Chapter 36 - Fire & Rescue Department | 2-6-2023 (2023-16) | ||||
§ 36-29 | Fire Department Cost Recovery | ||||
False alarm: third and subsequent false fire and/or sprinkler alarm for the same physical location | $100 per occurrence following the third alarm in the calendar year | ||||
Operational, standby, and special assessment fees | |||||
Firefighter, per hour or any portion of an hour | $55 | ||||
Fire officer, per hour or any portion of an hour | $60 | ||||
Equipment: small equipment such as generators, pumps, lights, etc. | $25 each | ||||
Light duty vehicles such as pick up truck or UTV, per hour or any portion of an hour | $75 | ||||
Ambulance, UTV, or heavy rescue, per hour or any portion of an hour | $125 | ||||
Pumper 1,000 GPM or over, per hour or any portion of an hour | $175 | ||||
Hazmat apparatus, ladder truck, per hour or any portion of an hour | $200 | ||||
Minimum fees: If a scheduled standby crew is canceled after arriving at an event, there shall be a fee assessed equal to two hours for personnel and one hour for the apparatus | |||||
If a scheduled event runs short of the original scheduled time, there shall be a minimum charge of two hours for each crew member or the actual time of the event, whichever is greater. The apparatus will be billed for the actual time of the event. | |||||
The Fire Chief may waive, decrease, or increase fees and costs depending on the use and/or activity and Fire code requirements. | |||||
Automobile and Equipment Accidents/Extrication Fees | |||||
The Westbrook Fire Department may charge vehicle extrication fees for motor vehicle accidents involving private personal vehicles and large commercial vehicles. These fees shall be billed to the automobile insurance companies on behalf of the accident victim | |||||
Fire suppression | $450 | ||||
Removal of the roof | $250 | ||||
Rolling of the dash or cutting structural posts | $250 | ||||
Tunneling or cutting of the floor pan | $250 | ||||
Removal of each door, steering column, or pedals | $150 | ||||
Stabilization and cribbing of the vehicle | $150 | ||||
Battery disconnect | $25 | ||||
Hazardous substance cleanup, to include damming, diking, or stopping flow | $200 | ||||
Creating a helicopter landing zone | $400 | ||||
Haz-mat response | |||||
Level 1 - Basic response: Claim will include engine response, first responder assignment, perimeter establishment, evacuations and setup and command. | $750 | ||||
Level 2 - Intermediate Response: Claim will include engine response, first responder assignments, hazmat certified team and appropriate equipment, perimeter establishment, evacuations, set-up and command of the incident, Level A or B suit donning, breathing air and detection equipment, setup and removal of decon center. Consumable items are an additional cost | $3,000 | ||||
Level 3 - Advanced Response: Claim will include engine response, first responder assignments, hazmat certified team and appropriate equipment, perimeter establishment, evacuations, set-up and command of the incident, Level A or B suit donning, breathing air and detection equipment, setup and removal of decon center, detection equipment, recovery and identification of material, disposal and environment clean up of materials used at the scene. Includes three hours of scene time, each additional hour or any portion of hour will be billed at $500 per hour. Consumable items are an additional cost | $7,000 | ||||
EMS Billing Rates | Current rates | ||||
BLS | $700 | ||||
ALS-1 | $1,000 | ||||
ALS-2 | $1,400 | ||||
Specialty care | $1,500 | ||||
Mileage | $18 | ||||
No transport | $125 | ||||
Medical intercept | $300 | ||||
Lift assist, no injuries | $300 | ||||
Non-emergency transport (basic life support) | $735 | 8-5-2024 (2024-89) | |||
Non-emergency transport (advanced life support) | $1,400 | 8-5-2024 (2024-89) | |||
Chapter 110 - Animals | |||||
Impoundment fees | 12-21-2020 (2020-153) | ||||
For each animal, first impoundment | $25 | ||||
For each animal, second impoundment | $50 | ||||
For each animal, third and subsequent impoundment | $100 | ||||
Building permits (inclusive of demolition of a building, swimming pools or any structure construction/alteration/demolition) | $50 + $15/$1,000 construction costs | 4-5-2010; 8-15-2011; 7-6-2015; 4-30-2018 (2018-58); 6-7-2021 (2021-54) | |||
Reinspection fee | $50 | 4-5-2010; 1-26-2015 | |||
Installation of ventilation, refrigeration, sprinkler system, and automatic fire alarm and detection system | $5/1,000 square feet | ||||
Signs | |||||
1 to 10 square feet | $20 | ||||
11 to 50 square feet | $35 | ||||
51 + square feet | $70 | ||||
Heating installation (flat fee) per appliance | $35 | 1-26-2015 | |||
Temporary stands, booths or platforms for sale of merchandise or other business purpose | $25 | ||||
Belated permits (permits not applied for until after the work has been started) | Double the amount of the fee as set forth above | ||||
Explosives, blasting (expires December 31) - extractive industries | $250/site | ||||
Explosives, blasting - all other activity | $25/shot, daily maximum of $250 ("shot" is defined as all explosives detonated in a single cycle.) | 2-8-2010 | |||
New mobile home (on an existing pad) building application fee | $50 | 3-18-2019 (2019-54); 6-7-2021 (2021-54) | |||
Chapter 131 - Cable Television | |||||
§ 131-3 | Filing fee for franchise contract (nonrefundable) | $25 | |||
§ 131-5 | Performance bond | $100,000 | |||
Chapter 135 - Cemeteries | 4-1-2019 (2019-57) | ||||
Sale of lot at Highland Lake, Saccarappa or Woodlawn Cemeteries | |||||
Resident | $750 | ||||
Nonresident | $935 | ||||
Standard interment – adult (13+ years of age) | |||||
Monday to Friday (7:00 a.m. to 2:00 p.m.) | $850 | ||||
Monday to Friday (2:00 p.m. to 5:00 p.m.) | $950 | ||||
Saturday (7:00 a.m. to 11:00 a.m.) | $1,010 | ||||
Standard interment – child (0 to 12 years of age) | |||||
Monday to Friday (7:00 a.m. to 2:00 p.m.) | $590 | ||||
Monday to Friday (2:00 p.m. to 5:00 p.m.) | $690 | ||||
Saturday (7:00 a.m. to 11:00 a.m.) | $750 | ||||
Standard interment winter surcharge (added to all standard interment fees from November 1 to April 1) | $175 | ||||
Cremation interment - with service | |||||
Monday to Friday (7:00 a.m. to 2:00 p.m.) | $415 | ||||
Monday to Friday (2:00 p.m. to 5:00 p.m.) | $495 | ||||
Saturday (7:00 a.m. to 11:00 a.m.) | $545 | ||||
Cremation interment - without service | |||||
Monday to Friday (7:00 a.m. to 2:00 p.m.) | $300 | ||||
Saturday (7:00 a.m. to 2:00 p.m.) | $380 | ||||
Cremation interment winter surcharge (added to all cremation interment fees from November 1 to April 1) | $100 | ||||
Standard disinterment - adult (13+ years of age) | |||||
Disinterment with recommittal within cemetery | $1,700 | ||||
Disinterment only | $850 | ||||
Standard disinterment - child (0 to 12 years of age) | |||||
Disinterment with recommittal within cemetery | $1,180 | ||||
Disinterment only | $590 | ||||
Cremation disinterment | |||||
Disinterment with recommittal within cemetery | $830 | ||||
Disinterment only | $415 | ||||
Cremation vault | Actual cost of vault | ||||
Gravestone installation | $100 | ||||
§ 135-11 | Transfer of lot deed | $50 | |||
4-5-2010 | |||||
§ 153-9 | Application fee | $50 | 6-7-2021 (2021-54) | ||
New 100 - 200 AMP service | $100 | 6-7-2021 (2021-54) | |||
New 200 - 400 AMP service | $150 | 6-7-2021 (2021-54) | |||
New >400 AMP service | $15/$1,000 construction costs | 6-7-2021 (2021-54) | |||
Replacement service 100 - 200 AMP | $50 | 6-7-2021 (2021-54) | |||
Replacement service 200 - 400 AMP | $100 | 6-7-2021 (2021-54) | |||
Replacement service > 400 AMP | $15/$1,000 construction costs | 6-7-2021 (2021-54) | |||
New commercial wiring and existing commercial alterations | $0.10/square foot per floor | 6-7-2021 (2021-54) | |||
Per meter and/or subpanel | $25 | 6-7-2021 (2021-54) | |||
Per generator/motors | $10 | 6-7-2021 (2021-54) | |||
Solar panels | $1.25 per KW | 6-7-2021 (2021-54) | |||
Heat pump | $50 per condenser | 6-7-2021 (2021-54) | |||
Reinspection fee | $50 | 1-26-2015 | |||
New mobile home (on an existing pad) | $50 | 3-18-2019 (2019-54); 6-7-2021 (2021-54) | |||
Chapter 157 - Events and Mass Gatherings | 3-18-2019 (2019-52) | ||||
Application fee | $200 | ||||
Use of electricity | $25/day | ||||
Portable restroom user fee for event with 150+ attendees | $25 | ||||
City services (police, fire, public services and ambulance support) | Actual expenses incurred | ||||
Chapter 162 - Fire Protection and Prevention | 4-5-2010 | ||||
§ 162-26 | Application fee for solid fuel appliance permit | $35 | |||
2-2-2009 | |||||
Application fee for all licenses except games of chance and state liquor licenses (only 1 fee charged per business when multiple licenses are applied for at the same time) | $25 | ||||
Background investigation fee (only 1 fee charged per person when multiple licenses are applied for at the same time) | $35 | 3-18-2019 (2019-54) | |||
Publication fee for advertisements of public hearings (only charged for new business/liquor license applicants requiring a public hearing) | $135 | 2-24-2025 (2025-25) | |||
Reinspection fee | $50 | ||||
§ 205-13 | Food service establishments (annually) | 3-3-2014; 4-23-2018 (2018-52) | |||
No food preparation on premises | $150 | ||||
Food preparation on premises - no alcohol | $200 | ||||
Food preparation with malt beverages and wine for consumption on the premises | $400 | ||||
Food preparation with liquor for consumption on the premises | $1,000 | ||||
Caterer - food preparation on premises | $150 | ||||
Temporary food service license (sale or service of food up to 3 events per calendar year) | $50 license and application fee | 5-7-2018 (2018-66); 2-24-2025 (2025-25) | |||
Outdoor dining as an accessory to a primary indoor restaurant | $50 application fee + $2 per square foot into public way | 11-19-2012; 8-29-2016 (2016-104) | |||
§ 205-20 | Food trucks and ice cream trucks, per unit | $150 | 2-24-2025 (2025-25) | ||
§ 205-21 | Pushcart/portable vending unit | $125 | |||
§ 205-24 | Amusement permit | $100 | |||
§ 205-26 | Tobacco vendors (annually) | $50 | 3-3-2014; 4-23-2018 (2018-52) | ||
§ 205-35 | Theaters (annually) | 3-3-2014; 4-23-2018 (2018-52) | |||
Seating capacity of up to 999 (price per screen) | $250 | ||||
Seating capacity 999 and over (price per screen) | $350 | ||||
Drive-in | $125 | ||||
§ 205-37 | Games of chance (biannually, as requested) | $25 | |||
Beano/bingo (annually) | $100 | 3-3-2014; 4-23-2018 (2018-52) | |||
§ 205-45 | Transient sales | ||||
Sales from a fixed location on private property (good for 30 days - only 2 permits allowed per year) | $50 | ||||
Sales from other than a fixed location (annual) | $100 | ||||
§ 205-63 | Massage licenses (all massage licenses expire annually | 4-23-2018 (2018-52) | |||
Massage establishment | $65 | ||||
Massage therapist | $45 | ||||
Combined massage therapist/establishment (sole practitioner) | $65 | ||||
§ 205-68 | Automobile graveyards/junkyards (expires December 31) | $100 | |||
§ 205-69 | Commercial hauler (expires December 31) | $150 | |||
§ 205-74 | Towing (expires December 31) | $125/company (for 1 wrecker) + $50 for each additional wrecker | |||
§ 205-84 | Towing fees | 11-4-2013 | |||
• | Per non-accident tow | $150 | 2-25-2019 (2019-33); 3-3-2025 (2025-39) | ||
• | Per accident tow | $175 | 2-25-2019 (2019-33); 3-3-2025 (2025-39) | ||
Vehicle storage (per 24-hour period or fraction after the first 24 hours) | $40 | 2-25-2019 (2019-33) | |||
After-hours release fee (7:00 p.m. to 7:00 a.m., weekends and holidays) | $40 | 6-2-2025 (2025-84) | |||
No-show additional surcharge (when vehicle owner/operator fails to appear at scheduled appointment time for release of their vehicle; towing operator must have proof of scheduled appointment.) | $25 | 11-4-2013; 6-2-2025 (2025-84) | |||
On-site release fee (vehicle owner/operator returns to vehicle after it has been secured to the wrecker but before the wrecker has left the scene) | $40 | 6-2-2025 (2025-84) | |||
Difficult extraction or cleanup (to be charged in 15-minute increments) | $80/hour | 5-4-2009 | |||
§ 205-87 | Farmers' market - price per stall (annual license) | $15 | |||
§ 205-95 | Tattoo establishment - expires annually | $100 | 6-3-2013; 3-3-2014; 4-23-2018 (2018-52) | ||
§ 205-96 | State liquor license (new, renewals and caterers, per event) | $25 | |||
§ 205-101 | Fireworks license fee (to sell fireworks) | $1,250 | |||
§ 205-105 | Use of consumer fireworks fee (per day) | $10 | 7-22-2013 | ||
§ 205-109 | Pawnshops and pawnbrokers - expires annually | $100 | 11-4-2013; 3-3-2014; 4-23-2018 (2018-52) | ||
§ 205-117 | Secondhand dealers - expires annually | $100 | 11-14-2013; 3-3-2014; 4-23-2018 (2018-52) | ||
Emergency shelter (expires annually - all types) | $100 | 6-3-2024 (2024-68) | |||
Emergency shelter - quarterly inspections | $150 | 6-3-2024 (2024-68) | |||
Chapter 216 - Mobile Homes and Mobile Home Parks | |||||
§ 216-4 | Annual permit fee (renewable January 1) | $50 | |||
§ 216-5 | Definitive plan | ||||
Per each boundary monument shown on the plan as required by the regulations | $30 | ||||
Security for the later submissions to the Planning Board of an accurate record plan and profile | $250 | ||||
Chapter 241 - Plumbing | 4-5-2010, 3-28-2011 | ||||
§ 241-2 | Minimum permit fee includes up to 4 fixtures | $40 | |||
Fixture fee - per fixture | $10 | ||||
Plumbing surcharge | $20 | 6-7-2021 (2021-54) | |||
Reinspection fee (charged by the City Plumbing Inspector in those instances when work has not been completed upon an inspection or when work was not in compliance with the State Plumbing Code) | $50 | 1-26-2015 | |||
Transfer fee | $10 | ||||
Piping relocation with no new fixtures | $10 | ||||
Hookup to public sewer | $10 | ||||
Permit transfer | $10 | ||||
§ 241-3 | Complete systems: | 9-14-2009 | |||
Engineered system (includes one disposal area) | $200 | ||||
Nonengineered system | $250 + $15 (state fee) | ||||
Primitive system (includes one alternative toilet) | $100 | ||||
Separated laundry disposal field | $35 | ||||
Seasonal conversion permit | $50 | ||||
System components (installed separately): | |||||
Alternative toilet (only) | $50 | ||||
Disposal field | $150 (non-engineered); $150 (engineered) | ||||
Treatment tank | $150 (non-engineered); $80 (engineered) | ||||
Holding tank | $100 | ||||
Variance (is added to permit fee) | $20 | ||||
Other system component (complete pump station, piping) | $30 | ||||
Hookup to existing subsurface system | $10 | 3-18-2019 (2019-54) | |||
New mobile home (on an existing pad) sewer hookup | $40 | ||||
Chapter 260 - Sewers and Wastewater Treatment | |||||
§ 260-41 | Conveyance of easement for sewer line construction and maintenance (unless greater diminution of value is shown) | Greater of $0.05/square foot or $1/linear foot | |||
§ 260-67 | Industrial pretreatment permit | $201.09/month | 3-28-2011 | ||
Industrial pretreatment BMP permit | $25/month | ||||
Chapter 272- Solid Waste | |||||
§ 272-18 | Annual residential demolition debris permit | $10 ($5 after July 1 of current year) | |||
Residential one-day permits for demolition debris | $1 ($5 max) | ||||
Additional residential fee for refrigerators, air conditioners, and humidifiers, and other appliances containing HFCs | $15/each | ||||
Annual commercial hauler permit | $150 | ||||
Per load commercial operator fees, per admittance | |||||
1/2-, 3/4-ton pickups, vans and trailers (1 cubic yard or less) | $15 | ||||
1/2-, 3/4-ton pickups, vans, trailers (exceeding 1 yard as estimated by landfill attendant) | $15/yard | ||||
Vans, trucks, trailers, 1-ton dump trucks, with capacity of 3 or more cubic yards | $50 | ||||
6-wheel single-axle dump truck (rack body truck, over 1-ton dump truck) | $150 | ||||
10 wheel dual axle dump truck | $300 | ||||
20 cubic yard dumpster (capacity 20 yards or less) | $300 | ||||
Any other dumpster, roll-off truck | $15/cubic yard of disposal material | ||||
Tractor trailer | $625 | ||||
Additional unit charges, per each unit | |||||
Auto tires | $2 | ||||
Truck tires | $5 | ||||
Truck tires 800 and above and loader tires | $15 | ||||
White goods, including stoves, water heaters, washing machines and clothes dryers | $5 | ||||
All other materials | $15/cubic yard | ||||
§ 272-28 | Solid waste application fee | $100 | |||
Chapter 281 - Streets and Sidewalks | 7-6-2009 | ||||
§ 281-44 | Application fee for each issuance renewal of excavation permit | $25 | |||
Newly constructed or reconstructed and newly paved streets | |||||
Bituminous concrete pavement, 4 inches or more in depth, per square yard | $70 (first 25 square yards) $65 (over 25 square yards) | ||||
Bituminous concrete pavement, 4 inches or less in depth, per square yard | $60 (first 25 square yards) $55 (over 25 square yards) | ||||
All other streets | |||||
Bituminous concrete over concreted base, granite block base, or bituminous concrete base (total bituminous concrete 4 inches or more) | $50 (first 25 square yards) $45 (over 25 square yards) | ||||
Portland cement concrete or granite block | $29 (first 25 square yards) $26 (over 25 square yards) | ||||
Bituminous concrete over macadam base, or bituminous concrete (less than 4 inches) over gravel base | $30 (first 25 square yards) $27 (over 25 square yards) | ||||
Bituminous macadam surface | $45 (first 25 square yards) $40 (over 25 square yards) | ||||
Bituminous treated surface or shoulder | $25 (first 25 square yards) $23 (over 25 square yards) | ||||
Plain gravel surface | $6 (first 25 square yards) $5 (over 25 square yards) | ||||
Sidewalk opening charges | |||||
Brick sidewalk | $25 (first 25 square yards) $25 (over 25 square yards) | ||||
Brick sidewalk on concrete base | $48 (first 25 square yards) $48 (over 25 square yards) | ||||
Bituminous concrete sidewalk | $20 (first 25 square yards) $20 (over 25 square yards) | ||||
Portland cement sidewalk | $27 (first 25 square yards) $27 (over 25 square yards) | ||||
Gravel sidewalk | $8 (first 25 square yards) $8 (over 25 square yards) | ||||
Esplanade (grass) | $8 (first 25 square yards) $8 (over 25 square yards) | ||||
Other charges | |||||
Bituminous concrete curbing, per linear foot | $7 | ||||
Granite curbing removal or realignment, per linear foot | $16 | ||||
Removing and replacing parking meters, each | $14 | ||||
Removing and replacing street name and traffic control signs, each | $25 | ||||
Replacement and installation of lost or damaged granite curb | $20 | ||||
Nonemergency street or sidewalk opening within a 5-year period of any major paving project | $300 | ||||
§ 281-45 | Minimum fee for any street or sidewalk excavation | $175 | |||
Inspection fees | $60/hour | ||||
Excavator's license | $500 annually | ||||
§ 281-106 | Banner sign permit fee | $200/location | 5-7-2018 (2018-65) | ||
Chapter 307 - Vehicles, All-Terrain | |||||
§ 307-5 | Impoundment fee | $5 per day | 12-21-2020 (2020-153) | ||
2-24-2025 (2025-24) | |||||
§ 310-71 | Parking in handicapped space (police discretion to tow vehicle) | $200 | |||
§ 310-90 | Parking exceeding time limit | $40 | |||
Parking in taxi stand, bus stop or loading zone | $60 | ||||
Parking double | $60 | ||||
Parking too near fire hydrant (police discretion to tow vehicle) | $80 | ||||
Parking in prohibited area | $60 | ||||
Parking on wrong side of street | $40 | ||||
Parking too near cross or corner | $40 | ||||
Parking in fire lanes (police discretion to tow vehicle) | $80 | ||||
Parking on a crosswalk | $60 | ||||
Obstructing snow removal (police discretion to tow vehicle) | $80 | ||||
Parking in front of a public or private driveway | $60 | ||||
Other parking violations | $40 | ||||
Parking in electric vehicle charging station space | $40 | ||||
Chapter 335 – Land Use: Site Plan Review | ||||
|---|---|---|---|---|
Extension of site plan approval | $150 | 3-1-2010; 6-7-2021 (2021-54) | ||
Preapplication meeting | $300 | 3-1-2010; 3-18-2019 (2019-54); 9-11-2023 | ||
Sketch plan | $300 | 3-1-2010; 3-18-2019 (2019-54); 9-11-2023 | ||
Application fee for site plan review, plus advertising | 10,000 square feet or less, $750; 10,000 to 49,999 square feet, $1,000; 50,000 to 99,999 square feet, $1,500; 100,000 square feet and up, $2,000; double for after-the-fact approval plus $50 admin fee | 3-1-2010; 9-11-2023 | ||
Publication and notice fee | $1/letter + legal + postage | 9-11-2023 | ||
Application fee for site plan review - administrative review | $300 | 4-5-2010; 3-18-2019 (2019-54); 5-15-2023 (2023-57) | ||
Site improvement inspection fee | 2% of estimated improvement costs | Where a project includes a site plan and a subdivision then this fee shall only apply once. | 4-5-2010 | |
Acceptance of a City street | $500 | 4-5-2010 | ||
Plan amendment(s) | Half of original fee | 4-5-2010; 9-11-2023 | ||
Staff review time: City Engineer and City Planner | City Engineer: after first 2 hours: hourly rate based on then current salary + benefits. City Planner: after first 4 hours: hourly rate based on then current salary + benefits | 4-5-2010 | ||
§ 355-5.9 | Fee in lieu of landscaping in the Gateway Commercial District (GCC). Calculated by multiplying the landscaping percentage deficit under § 335-5.9C(15) by 1/2 of the average assessed value of 1 acre of land in the GCC, determined as of June 2012 | 1/2 of average assessed value of 1 acre of land in the GCC as of June 2012 = $73,000 | 10-1-2012 | |
Chapter 335 - Land Use: Subdivisions | 4-5-2010 | |||
Application fee for subdivision | $300 per lot or dwelling unit + $50 admin fee | 5-24-2010; 3-18-2019 (2019-54); 9-11-2023 | ||
Sketch plan | $300 | 3-18-2019 (2019-54); 9-11-2023 | ||
Publication and notice | $1/letter + legal + postage | 9-11-2023 | ||
Public street acceptance | $500 | |||
Site improvement inspection fee | 2% of estimated improvement costs | Where a project includes a site plan and a subdivision, then this fee shall only apply once. | ||
Plan amendment(s) | $300 per lot or dwelling unit amended | 5-24-2010; 3-18-2019 (2019-54); 9-11-2023 | ||
Staff review time: City Engineer and City Planner | City Engineer: After first 2 hours: hourly rate based on then current salary + benefits. City Planner: After first 4 hours: hourly rate based on then current salary + benefits | |||
Chapter 335 - Land Use: Conditional Uses | 3-1-2010 | |||
Application fee for conditional use review | $300 | 6-7-2021 (2021-54); 9-11-2023 | ||
Chapter 335 - Land Use: Village Review Overlay Zone | 3-1-2010 | |||
Application fee for review of proposed work in the Village Review Overlay Zone | $75 | Publication and notice: $1/letter + legal + postage | ||
Chapter 335 - Land Use: Private Ways | 9-10-2018 (2018-121) | |||
Application fee | $500 | Publication and notice: $1/letter + legal + postage | ||
Plan amendment(s) | $250 | |||
Site improvement inspection fee | 2% of estimated improvement costs | |||
Staff review time: City Engineer and City Planner | City Engineer (after first 2 hours): hourly rate based on then current salary + benefits. City Planner (after first 4 hours): hourly rate based on then current salary + benefits | |||
Chapter 335 - Land Use: Paper Street Development | ||||
Application fee | $100 for each 50 feet of street to be constructed or improved | |||
Fee in lieu of provision of open space | $1,500 for every 50 feet of paper street that is constructed or improved, excluding the first 150 feet | |||
Chapter 335 - Land Use: Shoreland Zoning Permit | ||||
Application fee for administrative/CEO level review | $75 | Publication and notice: $1/letter + legal + postage | ||
Application fee for Planning Board level review | $300 | Publication and notice: $1/letter + legal + postage | ||
Miscellaneous Fees | |||
|---|---|---|---|
Building Permits | |||
Fill permit | Cubic yards: 0 to 250 = $15 251 to 500 = $25 501 to 1,000 = $35 Over 1,000 = $50 | 4-5-2010 | |
Reinspection fee | $25 | ||
Flood hazard development permit - application fee | $50, plus expert fees | ||
Zoning | 4-5-2010; 3-18-2019 (Ord. No. 2019-54) | ||
Maps - Zoning (24" x 36")/full size (5' 6" x 3') | $40/$50 | ||
Maps - Ward Map (24" x 36") | $25 | ||
Variance - disability | No charge | ||
Variance - practical difficulty | $250 | ||
Appeals/administrative | $500 | ||
Changes to the Land Use Ordinance, Contract Zoning and/or Zoning Map | $1,000 | ||
Blueprint copy and parcel maps black and white/color (24" x 36" maximum) | $8/$10 | ||
Plumbing | |||
Sewer connection | $250 | ||
City Clerk | 6-28-2010; 7-12-2010; 3-18-2019 (2019-54) | ||
Notary fee | Resident: $5 per signature; nonresident: $10 per signature | ||
Dedimus Justice services | Resident: free; nonresident: $10 | ||
Genealogy research | $5 per name search after first half hour | ||
Perform marriage ceremony at City Hall | $175 | 1-6-2025 (2025-04) | |
Utility pole permit | $10 | ||
Assessing | 4-5-2010 | ||
Reports | $25 for first hour; after first hour, hourly rate based on then current salary + benefits | ||
Rescue Collection | |||
Certified letters pre turnover to collection agency | Cost of certified mail | ||
Miscellaneous | |||
Returned check fee | $30 | ||
Miscellaneous paper copies - Freedom of Access Act[6] requests only | $0.10/page | 10-18-2021 | |
Electronic record storage medium or device (i.e., CD, DVD, USB drive) - Freedom of Access Act requests only | Actual cost of medium or device | 6-1-2015 | |
Trash/recycling toters (2 per residential unit) | $125 | ||
EMS Billing Rates | 3-28-2022 (2022-33) | ||
Basic life support | $700 | ||
Advanced life support - 1 | $1,000 | ||
Advanced life support - 2 | $1,200 | ||
Specialty care | $1,500 | ||
Mileage | $18/mile | ||
No transport | $125 | ||
Paramedic intercept | $300 | ||
[1]
Editor's Note: The original entries for Ch. 5, Bicycles, and Ch. 25, Police, of the 2007 City Code were repealed 3-18-2019 by Ord. No. 2019-54.
[2]
Editor's Note: The former entries for demolishing a building, as amended, installations not otherwise listed and aboveground and in-ground swimming pools were repealed 6-7-2021 by Order No. 2021-54.
[3]
Editor's Note: The former entries for alteration for three or more units/per unit and alteration of commercial were repealed 6-7-2021 by Order No. 2021-54.
[4]
Editor's Note: The former entries for pinball/video machines, billiard and poolroom and bowling alley were repealed 3-18-2019 by Ord. No. 2019-54. The former entries for taxicab and livery vehicle licenses, amended 4-23-2018 by Ord. No. 2018-52, were repealed 2-24-2025 by Ord. No. 2025-25. The former entry for per-tow fees for any vehicle with dual tires on the rear axle was repealed 3-3-2025 by Order No. 2025-39.
[5]
Editor's Note: The former entry for parking at night during the overnight winter parking ban was repealed 3-3-2025 by Order No. 2025-39.
[6]
Editor's Note: See 1 M.R.S.A. § 400 et seq.