Introductory Note:
| |
In addition to action taken by ordinance or resolution, the
following motions are of interest:
| |
(a)
|
Authorizing the Street Committee to build storm sewers, from
Reeder Coal Yard on Water Street to connect with the sewer in the
alley at Town Hall. [1/26/1934]
|
(b)
|
Authorizing digging drainage ditch on the south side of Cemetery
Street. [3/4/1957]
|
7-1. To provide for the construction of sewers in the public
alleys of the Borough of Hughesville, Pennsylvania. (This refers to:
[8/8/1905]
| |
1.
|
Alley running parallel to and eastwardly from Main Street, from
Academy Street to Walnut Street.
|
2.
|
Alley, parallel to Main Street, from Academy Street to such
a point as may be deemed practical with the grade of the alley.)
|
7-2. To provide for construction of additional sewer in the
Borough of Hughesville, Pennsylvania (A sewer was to be constructed,
from the intersection of Second and Walnut Streets to Academy Street,
by the most practicable route.) [9/12/1907]
| |
7-3. Untitled resolution directing the Authority to proceed
at once with construction of a sewer system and sewage treatment plant.
[Resolution, 2/9/1953]
| |
7-4. Approving the plans and specifications for the sanitary
sewers and sewage treatment plant proposed to be constructed by Hughesville
Borough Authority for the Borough of Hughesville and for the storm
sewers proposed to be constructed by the Borough of Hughesville;
approving the form of advertisement for proposals for construction
of said storm sewers and authorizing publication thereof; and
approving the estimated costs of said sanitary sewers, storm sewers
and sewage treatment plant. [Ord. 1-1953, 3/3/1953]
| |
7-5. Providing for the laying out and installing of a storm
sewer system on Walnut Street, from Crawley Street to the Muncy Creek,
providing for the purposes and use of the same and providing penalties
for the misuse thereof, and providing for the payment for said project
during the years 1960, 1961 and 1962. [Ord. 3-1960, 5/2/1960]
| |
7-6. Providing for the laying out and installing of a storm
sewer system on Academy Street and Broadway, from the westerly Borough
line to Muncy Creek, providing for the purposes and use of the same,
and providing penalties for the misuse thereof. [Ord. 6-1965, 12/6/1965]
| |
7-7. Providing for the formation of a joint sewer board composed
of the Borough of Hughesville, Wolf Township, and the Borough of Picture
Rocks. [Ord. 2-1989, 3/13/1989]
| |
7-8. Accepting Lot #24 of the subdivision plan of Armstrong
Terrace on which is situate the sewage treatment plant. [Ord. 5-1990,
10/29/1990]
| |
7-9. Granting to the Hughesville-Wolf Township Joint Municipal
Authority certain rights and privileges in connection with the Authority's
sewer system. [Ord. 3-1993, 5/10/1993]
|