The applicant shall provide a financial guarantee to the Township
for the timely installation and proper construction of all stormwater
management controls required by the approved stormwater plan and this
chapter equal to the full construction cost of the required controls.
Financial guarantees as required by this chapter shall be provided
in the form of:
C. Irrevocable letters of credit.