[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
Every owner of an occupied structure (capable of utilizing water under pressure) for residential, commercial, or industrial purposes, but not buildings utilized solely for agricultural purposes, where the structure is located within 150 feet of a public water line, within 90 days of notice be required to connect at his/her own cost the house, building, or other structure to the public water system, in accordance with the regulations of the Pennsylvania Water Company.