[R.O. 2011 § 515.100; Ord. No.
1272, 8-20-2018]
As used within this Article, the following words shall have
the listed definitions:
CURB
A stone or concrete edging to a street or path.
GUTTER
A channel along the side of a street for directing and carrying
rainwater.
MAJOR STREET REPAIR
A street construction project where more than fifty percent
(50%) of the paving surface and/or paving surface base is replaced,
within the area being repaired, within a two-year period. This includes,
but is not limited to, full-depth reconstruction of the street and
side-to-side pavement milling and resurfacing.
NEW CONSTRUCTION
A construction project that creates a street or roadway where
one did not previously exist or a construction project that fully
improves a previously deteriorated driving surface, including those
made of gravel or rock, to a new, paved surface.
[R.O. 2011 § 515.110; Ord. No.
1272, 8-20-2018]
A. All curb and gutter shall be constructed under the supervision of
the City Engineer or Public Works Director.
B. All curb and gutter shall be constructed according to the current
design standards as may be modified from time to time by the Board
of Aldermen.
[R.O. 2011 § 515.120; Ord. No.
1272, 8-20-2018]
A. All new streets or roadways shall be installed with curb and gutter.
B. All curb and gutter installed along any new street or roadway shall
be installed by the property owner or his/her designee.
C. All costs associated with the installation of the new curb and gutter,
including but not limited to all labor, materials, and permit costs,
shall be borne by the property owner.
[R.O. 2011 § 515.130; Ord. No.
1272, 8-20-2018]
A. All curb and gutter installed or replaced as part of a major street
repair project shall be installed by the City of Owensville or its
designee.
B. Those portions of curb and gutter to be replaced or repaired as part
of the major street repair project shall be determined by the City
Engineer or Public Works Director.
C. All costs associated with the installation or replacement of the
curb and gutter, including but not limited to all labor and materials
costs, shall be borne by the City of Owensville.
[R.O. 2011 § 515.140; Ord. No.
1272, 8-20-2018]
A. Any property owner whose property abuts a City street that is not
scheduled to be included in a major street repair project within the
next two (2) years may apply to replace their existing curb and gutter
as part of this cost share program.
B. To be considered for the cost share program, the property owner will
be required to provide information detailing the location and condition
of the existing curb and gutter and indicating why the property owner
is requesting said curb and gutter to be replaced.
C. As part of the cost share program, the City's Public Works Department
agrees to perform the following actions:
1.
Excavate and remove the existing curb and gutter.
2.
Provide granular fill to serve as a base for the new curb and
gutter.
3.
Patch the street and connect the street to the new curb and
gutter upon completion of the installation of the new curb and gutter.
D. As part of the cost share program, the property owner, or his/her
designee, will be required to perform the following actions:
1.
Obtain all necessary permits.
2.
Hire a licensed contractor to grade the surface for the new
curb and gutter, pour the new curb and gutter, and backfill any remaining
holes or vacancies.
3.
Pay for any additional costs which may be associated with the
project not expressly listed herein.
E. Those portions of curb and gutter to be included in any particular
cost share program shall be determined by the City Engineer or Public
Works Director. Factors used to determine if and when a particular
portion of curb and gutter will be replaced in any particular cost
share program, include, but shall not be limited to, the following:
3.
Safety concerns and hazards caused by the damaged curb or gutter.
4.
Aesthetic improvements desired by the property owner.
5.
City of Owensville employee availability and workload.
[R.O. 2011 § 515.150; Ord. No.
1272, 8-20-2018]
A. The City's involvement and/or enforcement of any section or
project as described within this Article shall be made under the City's
sole and absolute discretion.
B. The City's participation in any given project shall not guarantee
future participation in similar projects.
[R.O. 2011 § 515.160; Ord. No.
1272, 8-20-2018]
This Article shall apply only to public streets within the City.