[Ord. 8/12/1999, § 6.1]
The fees required by this Part are the application fee and the Township review and inspection fees. The fees shall be established by the Township Supervisors by separate Fee Resolution to defray costs incurred by the Township and the Township Engineer. All fees shall be paid by the applicant.
[Ord. 8/12/1999, § 6.2]
The Township shall establish a review fee schedule based on the size and hydrologic complexity of the regulated activity and based on the Township's costs for reviewing the drainage plan. The Township shall periodically update the review fee schedule to ensure that review costs are adequately reimbursed. Charges for the Township Engineer review of a drainage plan and inspection of the facilities shall be coordinated to the extent practical with review and inspection under Chapter 22, Subdivision and Land Development, so as to avoid duplicate costs and review charges.
[Ord. 8/12/1999, § 6.3]
1. 
The fees required by this Part shall at a minimum cover:
A. 
Application fee to cover administrative costs.
B. 
The review of the drainage plan by the Township and the Township Engineer.
C. 
Site inspection(s), at pre-development stage and during related development.
D. 
The inspection of stormwater management facilities and drainage improvements during construction.
E. 
The final inspection upon completion of the stormwater management facilities and drainage improvements presented in the drainage plan.
F. 
Any additional work required to enforce any permit provisions regulated by this Part, identify violations and assure proper completion of stipulated remedial actions.