[Ord. 8/12/1999, § 6.1]
The fees required by this Part are the application fee and the
Township review and inspection fees. The fees shall be established
by the Township Supervisors by separate Fee Resolution to defray costs
incurred by the Township and the Township Engineer. All fees shall
be paid by the applicant.
[Ord. 8/12/1999, § 6.2]
The Township shall establish a review fee schedule based on the size and hydrologic complexity of the regulated activity and based on the Township's costs for reviewing the drainage plan. The Township shall periodically update the review fee schedule to ensure that review costs are adequately reimbursed. Charges for the Township Engineer review of a drainage plan and inspection of the facilities shall be coordinated to the extent practical with review and inspection under Chapter
22, Subdivision and Land Development, so as to avoid duplicate costs and review charges.