Before any building permit for a commercial structure, industrial
structure, apartment house or multiple-family dwellings shall be issued,
approval of the application for such a permit shall have been obtained
from the County Department of Public Works (sewer), the State Fire
Marshall, and the Town Engineer (water). There must be a second approval
from these agencies before an occupancy permit is issued.
All zoning permits and building permits issued shall be promptly
published once in a newspaper of general circulation in the Town.
The time for taking an appeal from the issuance of such a permit shall
not begin to run until the date of such publication. For purposes
of determining the appeal period for an issued permit, the date of
the decision shall be the date on which the notice of issuance is
published.
Zoning certificates or zoning occupancy permits issued based on site plans and applications approved by the Zoning Inspector authorize only the use, arrangement, and construction outlined in such approved plans and applications, and no other use, arrangement, or construction. Use, arrangement, or construction differing from that authorized shall be deemed a violation of this chapter, and punishable as provided by §
340-212 of this chapter.