[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. I)]
The Construction Board of Appeals for the Township shall be
the Board of Appeals established by Essex County.
[Amended 9-8-1987; 2-21-1989; 2-18-1992; 6-6-1994; 5-5-1997; 12-20-1999; 9-17-2002 by Ord. No.
02-34; 2-6-2006 by Ord. No. 06-02; 6-1-2009 by Ord. No. 09-43; 5-6-2013 by Ord. No. 13-20; 5-5-2014 by Ord. No. 14-17; 12-14-2020 by Ord. No.
20-50]
A. The fee for plan review shall be 20% of the construction permit fee.
Plan review fees are not refundable.
B. The basic construction fee shall be the sum of all subcode fees computed
on the basis of the volume or cost of construction fees of all subcode
fees. The minimum fee for any one subcode shall be $85. In addition,
an administrative fee of 15% shall be added to elevator subcode fees.
The fee for a change of contractor is $85 per subcode, and subsequent
plan review will be charged at $85 per hour per subcode.
(1) Building volume and cost:
(a)
Fees for new construction and additions shall be based upon
the volume of the structure. Volume shall be computed in accordance
with N.J.A.C. 5:23-2.28. The new construction fee shall be in the
amount of $0.038 per cubic foot of volume for buildings and structures
of all use groups and types of construction as classified and defined
in Chapters 3 and 6 of the Building Subcode. The fee shall be $0.021
per cubic foot of volume for Use Groups A-1, A-2, A-3, A-4, A-5, F-1,
F-2, S-1 and S-2, and the fee shall be $0.0011 per cubic foot for
structures on farms, including commercial farm buildings under N.J.A.C.
5:23-3.2(d).
(b)
Fees for renovations, alterations and repairs shall be $34 per
thousand up to $50,000 of the estimated cost, $26 per thousand from
$50,001 to $100,000, and $22 per thousand for $100,001 and above.
(c)
The fees for demolition or removal of structure, including footings,
shall be $150 for R-3 and R-5 use groups. All other structures shall
be $300.
(d)
Building Subcode fees related to the removal of hazardous building
materials:
[2]
Asbestos abatement permit: $118. Asbestos certificate: $24.
(e)
Building Subcode fees related to swimming pools:
(f)
In order to provide for the training and certification and technical
support programs required by the State Uniform Construction Code Act,
the enforcing agency shall collect a surcharge fee to be based upon
the volume of the new construction or the value of construction for
other types of construction within the municipality. Said fee shall
be accounted for and forwarded to the Division of Codes and Standards.
This fee shall be in the amount as set forth in N.J.A.C. 5:23-4.19(b).
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. I)]
(2) Plumbing fixtures and equipment:
(a)
For the purpose of computing fees, the fee for each plumbing
fixture or appliance connected to the plumbing system shall be $20
per item, except for the following:
[1]
For R-3 and R-5 structures, the fee for water heaters, fuel
oil piping, steam or hot-water boilers, sewer connection, or water
service connection shall be $85 per unit.
[2]
For all other use groups, the fee for grease traps, water heaters,
steam or hot-water boilers, sewer pumps, interceptors, furnaces, HVAC
units, testable backflow preventers, oil separators, and utility service
connections shall be $91 per unit.
(c)
Annual testing of backflow preventer: $85.
(d)
Aboveground oil storage tank: $85.
(e)
There shall be no fee for direct replacement of fixture(s) where
no change is made to the existing piping system, as per N.J.A.C. 5:23-2.7,
Ordinary Maintenance.
(3) Mechanical fixtures and equipment:
(a)
A fee in the amount of $85 for each of the following items in
R-3 or R-5 use groups: steam or hot-water boilers, furnaces, and HVAC
units. There shall be no extra charge for gas or oil piping or water
connections, including condensate drains.
(b)
The above fixtures and equipment items shall be on the mechanical
inspection technical section in R-3 and R-5 use groups only.
(4) Electrical fixtures and devices:
(a)
The fees for receptacles, fixtures, wall switches, smoke and
heat detectors, or similar devices shall be as follows:
[2]
Each additional 25 items or part thereof: $25.
(b)
Fees for site lighting shall be as follows:
(c)
Appliance of motor, R-3 and R-5 dwellings only. Heating, cooking,
and cooling equipment, pumps, dryers, water heater, and other appliances:
[1]
Less than 10 kw outlets for units: $30.
(d)
Service entrance panels/subpanels/motor controls:
[4]
1,001 amps or greater: $500.
(e)
Motors, motor controls, transformers, heating, air-conditioning
units, generators, solar or other electrical devices:
(f)
Fees for signs/outline lights:
(i)
Lawn sprinklers/rain sensor: $85.
(j)
Sound system/intercoms with low-voltage wiring: $85.
(k)
Pools/spas and hot tubs:
[3]
Hydromassage tubs/Jacuzzi/hot tubs: $100.
(l)
Air conditioner fee and disconnects: $85.
(m)
Communication points, one- and two-family dwellings: $85.
(n)
Communication points, multifamily and commercial:
[2]
Over 25 points: $20 per each block of 20.
(5) Fire protection. The fees for fire protection and other hazardous
equipment shall be as follows:
(a)
Sprinkler heads:
[5]
401 to 1,000 heads: $1,150.
[6]
Over 1,000 heads: $1,469.
(b)
Smoke and heat detector systems:
[2]
Each additional device: $5.
(d)
Fire pump/GPM type, dry pipe/alarm, pre-action valves: $250.
(e)
Pre-engineered system: $250.
(f)
Gas- or oil-fired appliance not connected to the plumbing system:
$85.
(g)
Pull station water/flow supervisory devices and emergency exit
signal devices:
[2]
Each additional device: $5.
(h)
Miscellaneous fire fees:
[1]
Commercial kitchen exhaust system: $200.
[2]
Commercial smoke-control system: $200.
[3]
Fireplace venting/metal chimney: $85.
[6]
Fire annunciator control panel: $100.
[7]
Oil tanks (installed or removed): $100.
(6) Miscellaneous fees:
(a)
The fee for a certificate of occupancy shall be $150 for R-3
and R-5 and $300 for all others.
(b)
The fee for a change of use group shall be $100.
(c)
The fee for an application for a variation in accordance with
N.J.A.C. 5:23-2.10 shall be $654 for Class I structures and $132 for
Class II and Class III structures. The fee for resubmission of an
application for a variation shall be $252 for Class I structures and
$72 for Class II and Class III structures.
(7) Exempt from fees. The following shall be exempt from the payment
of fees under this chapter:
(a)
Any religious, charitable, benevolent, fraternal or nonprofit
associations, corporations or organizations at the discretion of the
Township Council.
(b)
Pursuant to N.J.A.C. 52:27D-126e, fees will be waived for certain
construction projects to benefit persons with disabilities.