[Ord. No. 94-29 § 118-14A]
All improvements shall be installed in complete accordance with
the standards of this chapter, with other particular specifications
approved by the Planning Board and Township Engineer and with all
other applicable municipal, County, State and Federal regulations.
Should improvements be required which are not provided for within
the particular sections of this chapter, they shall be designed and
constructed in accordance with good engineering practice and recognized
design standards. The developer, or his engineer, shall submit detailed
design calculations and construction specifications in each such instance.
Prior to the initiation of such specialized design, the particular
standards to be utilized shall be submitted for review by the Planning
Board and Township Engineer.
[Ord. No. 94-29 § 118-14B]
The Standard Specifications for Road and Bridge Construction
of the New Jersey Department of Transportation, 1989 (or as currently
amended), including all addenda, and the Standard Construction Details
of the New Jersey Department of Transportation (latest revisions),
as modified, supplemented, amended or superseded by the requirements
of this chapter, by the approved final plat, by particular agreement
among the Planning Board, Township Council and developer or by other
applicable municipal, County, State or Federal regulations, shall
govern the completion of the required improvements. Such Standard
Specifications and Standard Construction Details are made a part of
this chapter by reference and will not be herein repeated. It is the
responsibility of all developers to familiarize themselves with these
standards, copies of which may be examined at the offices of the Township
Clerk and Township Engineer and may be obtained, upon payment of the
cost thereof, from the New Jersey Department of Transportation. The
requirements of this chapter, of an approved final plat or of particular
agreements and conditions of approval and of applicable municipal,
County, State or Federal regulations shall govern and prevail in the
case of conflict between them and the Standard Specifications or Standard
Construction Details.
[Ord. No. 94-29 § 118-14.1A]
All site plan and subdivision plats shall conform to design
standards that will encourage desirable development patterns within
the Township. Where either or both an Official Map or Master Plan
have been adopted, the site plan or subdivision shall conform to the
proposals and conditions shown thereon. The streets, drainage rights-of-way,
school sites, public parks and playgrounds and other municipal facilities
shown on an adopted Master Plan or Official Map shall be considered
in the review of site plans and subdivision plats. Where no Master
Plan or Official Map exists, or makes no provisions therefor, streets
and drainage rights-of-way shall be shown on the final plat in accordance
with N.J.S.A. 40:55D-38 and shall be such as to lend themselves to
the harmonious development of the municipality and the enhancement
of the public welfare.
[Ord. No. 94-29 § 118-14.1B]
Within the criteria established by and subject to the review
and approval of the Board, all design of a site plan or subdivision
is the responsibility of the developer, and he shall be responsible
for and bear the entire cost of any and all investigations, tests,
reports, surveys, samples, calculations, environmental assessments,
designs, researches or any other activity necessary to the completion
of the design. The standards set forth in this chapter shall be taken
to be the minimum necessary to meet its purposes, as set forth elsewhere
herein. The responsibility of the Board shall be to see that these
minimum standards are followed and, in those cases not covered by
these standards, sufficient precautions are taken to assure that the
eventual design is conducive to the implementation of the purposes
of this chapter and the Township Master Plan. The Board may employ
professionals in various disciplines to advise and assist it in its
determinations. Any decisions of the Board regarding the suitability
or sufficiency of any design proposal, taken upon advice of its professionals
and subject to the provisions of this chapter, shall be deemed conclusive.
[Ord. No. 94-29 § 118-14.1C]
To properly execute the design of a site plan or subdivision,
it is anticipated that the developer will obtain or cause to be obtained
certain design data, including but not limited to soil tests and analyses,
environmental assessments, traffic studies and traffic projections,
surveys, reports and similar design data. Any and all such data obtained
by the developer, or by others retained by him to complete the design,
shall be made available to the Board and its employees and professional
consultants for the purpose of reviewing the proposed design. Nothing
contained herein shall be interpreted to prevent the Board from making
or causing to be made such independent studies, calculations or other
undertakings as it deems necessary in the review of any application
for development.
[Ord. No. 94-29 § 118-14.1D]
When a developer determines that it will be necessary to utilize
design standards in addition to or other than those minimum requirements
established herein, he is advised to consult with the Board Engineer,
prior to beginning his detailed design, for review and approval of
his proposed design standards. Standards utilized should generally
be recognized as industry standard and in common use in this area.
Design standards may not be utilized if they do not have the approval
of the Board Engineer.
[Ord. No. 94-29 § 118-14.1E; Ord. No. 02-49-OAB § 5]
It is recognized that, in certain instances, preexisting conditions
or the uniqueness of a particular proposal may require the waiver
of some of the standards presented herein. The Board may consider
and, for cause shown, may waive strict compliance with such of these
detailed design standards as it sees fit. Waiver may be granted only
with full consideration and provision for traffic safety, accessibility
for firefighting equipment, ambulances and other emergency vehicles.
Any developer desiring such action shall present with the application
for development a listing of all such waivers desired, together with
the reasons therefor. The burden is on the developer to demonstrate
that a waiver can be granted with due provision for emergency rescue
vehicles such as fire trucks, first aid ambulances and other emergency
rescue vehicles as well as mail trucks and garbage trucks for collection
of solid waste provided by the municipality. The developer shall also
demonstrate that the waivers can be granted with due regard for water,
sewerage and drainage facilities and easements therefor located outside
the property limits of the development but necessitated by construction
or improvements within the development.
[Ord. No. 02-49-OAB § 6]
a. The Department of Engineering shall ascertain, in each drainage instance,
the drainage area of which the specific subdivision or site development
is a part and apportion a fair cost of adequate drainage for the whole
drainage area among land owners who contribute to or who will contribute
to the stormwater runoff if the subdivision or site plan is approved.
Each applicant for a subdivision or site plan requiring provisions
for drainage of stormwater runoff shall install an adequate drainage
system for the specific development and shall also pay in cash or
check to the Township Drainage Trust Fund for the ultimate disposal
of the stormwater runoff to an adequate outlet. Each payment made
to the Township shall be held by it in trust until the overall disposal
system is constructed for the drainage area in question, at which
time the trust funds raised for that drainage area may be used for
construction in for that area. If the improvements are not initiated
within a period of 10 years from the date of payment or any other
mutually agreeable period of time, all deposits shall be returned
to the developer together with the accumulated interest.
[Ord. No. 94-29 § 118-14.2]
a. The block length, width and acreage within bounding roads shall be
such as to accommodate the size and dimensions of lots required for
the zoning district and to provide for convenient access, circulation
control and safety of vehicles and pedestrians.
b. Block lengths may vary between 500 and 3,000 feet, but blocks along
other than local, local collector, minor collector or major collector
streets shall not be less than 1,200 feet long.
c. Interior crosswalks with a right-of-way 10 feet wide containing a
sidewalk of four feet or greater in width and fenced on both sides
may be required for blocks longer than 1,200 feet, and from the ends
of the cul-de-sac to adjacent streets and elsewhere as required by
the public convenience, including the provision of walks giving access
to schools, playgrounds and shopping centers, without the necessity
of crossing traffic thoroughfares.
[Ord. No. 94-29 § 118-14.3; Ord. No. 01-21-OAB § 17; Ord. No. 11-25-OAB § 3]
a. All uses, other than single-family detached, townhouses and two-family
detached dwellings and their accessory uses shall provide buffer areas
along all sides and rear property lines which abut areas zoned residentially
or containing existing residential uses (including single-family detached,
two-family or multifamily detached dwellings) and along front property
lines on local, local collector, minor collector and major collector
streets which abut areas zoned for such residential uses. Buffers
shall not be required adjacent to lagoons or NJDEPE wetlands.
b. Wherever this chapter imposes a landscaping or seeding requirement,
natural vegetation may be substituted in all areas where it exists
and has attained a height of at least six feet. The landscaping and
seeding requirement shall still apply, however, in all areas not so
covered.
c. In conjunction with commercial or industrial uses, all areas of a
lot not occupied by buildings, pavement or other surfacing and other
required improvements shall be landscaped by the planting of grass
and/or ground cover, shrubs and trees. The placement of the plant
material shall be appropriate to the enhancement of the property and
in accordance with a landscape plan approved by the Board. All such
area shall be continuously maintained.
d. In order to provide adequate buffering between differing classifications,
buffer zones shall be provided in conjunction with any nonresidential
use abutting a lot zoned for residential purposes or containing an
existing residential use. Such buffer requirements shall apply to
every property line that abuts a residentially zoned lot or use. The
required width of a buffer shall be in addition to any required yard
areas and shall include a screening strip as herein prescribed. The
minimum width of any buffer zone shall be 10 feet for a building or
group of buildings on one lot up to 10,000 square feet of gross floor
area. The width of the buffer zone shall be increased by one foot
for each 1,000 square feet or fraction thereof that a building or
group of buildings exceeds 10,000 square feet, up to a maximum width
of buffer zone of 100 feet.
e. Where a nonresidential building or group of buildings proposed within
any zone will exceed 200,000 square feet and will abut previously
developed residential uses, the Board may require an earth mound with
screen plantings to provide a sight and sound barrier. Such mound
shall be not less than six feet in height nor 36 feet in width at
its base and shall be greater if required to visually screen to the
maximum extent feasible parking, lighting and buildings from the residential
area or to provide for a maximum noise level at the property line,
measured 10 feet above ground level, in accordance with the following
table.
f. Buffer areas shall be maintained and kept free of all debris, rubbish,
weeds and tall grass.
g. No structure, activity, storage of materials or parking of vehicles
shall be permitted within the buffer area, except that where approved
by the Planning Board the buffer area may be broken for vehicular
or pedestrian access and appropriate directional safety signs provided.
h. Screening. Within required buffer areas there shall be provided screening
in accordance with the following regulations:
1. Location.
(a)
The location of screening within buffer areas wider than 20
feet shall be arranged in order to provide maximum protection to adjacent
properties and to avoid damage to or interference within desirable
existing plant material and shall be subject to approval by the Board.
(b)
Those portions of the buffer area not included within the screening
strip shall either contain existing vegetation approved by the Board
and/or be planted with trees and shrubs in accordance with a landscaping
plan approved by the Board.
2. The screening area shall be a minimum of 20 feet in width. The trees
shall conform to the current American Standard for Nursery Stock sponsored
by the American Association of Nurserymen, Inc. The trees may be planted
in either of the following manners:
(a)
The trees shall be planted in two rows, the rows being eight
feet apart, and the plant material shall be evergreen trees of between
five and eight feet in height. The plant material within the rows
shall be staggered and planted in ten-foot centers.
(b)
The planting shall occur in a naturalistic manner consisting
of groupings of mixed plant varieties and sizes. The planting shall
consist of evergreen trees between five and eight feet in height planted
10 feet on center; shade trees 2.5 inches minimum in caliper; flowering
trees four to five feet in height and shrubs two feet in height planted
in naturalistic pattern of mixed plant varieties and sizes. The shade
trees shall be planted at 10/1,000 linear feet of screening area;
the flowering trees shall be planted at 10/1,000 linear feet of screening
area; and the shrubs shall be planted at 50/1,000 linear feet of screening
area.
3. In cases where it is determined to be desirable by the Board, evergreen
trees planted with a minimum height of four feet may be substituted
for the five to eight-foot trees provided that the developer shall
install a solid six-foot high stockade fence along the outside of
the required screening strips prior to commencing the construction
of improvements on the site. The stockade fence shall be maintained
in good condition by the developer until such time as the evergreen
trees have grown to a minimum height of 10 feet, at which time the
developer may remove the stockade fence.
4. Where existing specimen trees exist within a screening area, they
should be retained and supplemented with shade-tolerant evergreen
trees to provide the equivalent of the required screening.
5. Where all proposed buildings, parking areas and other improvements
are located 100 feet or more from a property line abutting a residential
zone, the Board may permit a screening area 10 feet in width planted
with a single row of evergreen trees in a location approved by the
Board planted on ten-foot centers with a minimum height of six to
eight feet of a type and species to be substituted for the screening
area.
6. The required height for a screening area shall be measured in relationship
to the elevation of the land at the nearest required rear, side or
front yard setback line of the abutting residentially zoned properties.
Where the average ground elevation of the location at which the screening
strip is to be planted is less than the average ground elevation at
the nearest required rear, side or front setback line on the abutting
residentially zoned property, the Board may require that the height
of trees planted in the required screening strip be increased by an
amount equal to the difference in elevation. Where the average ground
elevation of the location at which the screening strip is to be planted
is greater than the average ground elevation at the nearest required
rear, side or front setback line on the abutting residentially zoned
property, the Board may permit the height of trees planted in the
required screening strips to be decreased by an amount equal to 1/2
the difference in elevation, except that in no case shall the required
height be reduced to less than four feet.
7. All trees in a screening area shall be watered weekly through the
first growing season. The developer shall construct a six inch deep
earth saucer around each tree to hold water and fill with woodchips
or other suitable mulch. Trees shall be nursery grown, balled and
bagged, sheared and shaped, of the required height and planted according
to accepted horticultural standards.
8. At the following locations within required screening areas, evergreen
shrubs with a maximum mature height of 30 inches or less, shall be
provided in lieu of the evergreen trees specified above.
(a)
Within sight triangle easements.
(b)
Within 25 feet of intersections measured along the edge of pavement/curbline
where sight triangle easements are not required.
(c)
Within 25 feet of access drives measured along the edge of pavement/curbline.
9. Waiver. The Board, after favorable recommendation by the Board Engineer,
and after examination and review, may waive, fully or partially, provisions
of this section in heavily wooded areas, in areas unsuitable for plantings
or because of other exceptional conditions and/or may require supplementary
plantings.
i. Roadway Screening Strip. Such strips are required where the rear
of residential lots or units directly abut Ocean County roadways.
Such strips shall provide the following:
1. Provide for a continuous landscape area of not less than 50 feet
in width. The width of the area occupied by screening material shall
not be less than 10 feet.
2. Berms shall be incorporated in a variable fashion both horizontally
and vertically to achieve a rolling landscape. The height of the berm
shall be appropriate to the existing topography, but shall not average
less than three feet in height. The width should vary with side slopes
of 5:1 to 3:1 being provided.
3. Sidewalks, if required, may meander through, around and over the
berms, and around existing and proposed vegetation. In such a case,
a sidewalk easement over the entire screening strip may be established.
4. The screening strip shall be planted in accordance with the following:
Deciduous Trees
|
10/1,000 lf.
|
Evergreen Trees
|
10/1,000 lf.
|
Deciduous Shrubs
|
50/1,000 lf.
|
Evergreen Shrubs
|
50/1,000 lf.
|
5. Plants shall be provided with a minimum size of 2.5 inches measured
six inches above the base for deciduous trees; evergreen trees shall
have a minimum size of five feet in height; ornamental trees shall
have a minimum height of five feet; and shrubs shall have a minimum
size of 24 inches in height.
6. Species shall be native to the area and shall be appropriate for
planting in the Coastal Area and/or Pinelands Area, as applicable.
j. Tract Screening Strip. Screening strips shall not be required where
single-family uses abut a single family zoning classification. Where
proposed multi-family uses abut a single family zone, there shall
be a tract screening strip provided. Such strips shall be as follows:
1. Provide for a continuous landscape area of not less than 15 feet
in width. The width of the area occupied by screening material shall
not be less than 10 feet.
2. If berming is to be utilized, such berms shall be incorporated in
a variable fashion both horizontally and vertically to achieve a rolling
landscape. The height of the berm shall be in character with the existing
topography, but shall average not less than two feet in height. The
width should vary with side slopes of 5:1 to 3:1 being provided.
3. The screening strip shall be planted with groupings of trees, and
shrubs in accordance with the following:
Deciduous Trees
|
30/1,000 lf
|
Evergreen Trees
|
100/1,000 lf
|
4. Plants shall be provided with a minimum size of 2.5 inches measured
six inches above the base for deciduous trees; evergreen trees shall
have a minimum size of five feet in height; ornamental trees shall
have a minimum height of five feet; and shrubs shall have a minimum
size of 24 inches in height.
5. Species shall be native to the area and shall be appropriate for
planting in the Coastal Area and/or Pinelands Area, as applicable.
k. Landscaping.
1. Topsoil preservation. No topsoil shall be removed from the site or
used as spoil, except as may be provided for in a soil removal permit
issued in accordance with the ordinances of the Township regulating
mining operation or excess topsoil remaining after all improvements
have been installed in accordance with an approved site plan or subdivision
map after topsoil has been redistributed in accordance with this Subsection.
All topsoil moved during the course of construction shall be redistributed
on all regraded surfaces so as to provide an even cover and shall
be stabilized by seeding or planting. All regraded areas and all lawn
areas shall be covered by a four inch minimum thickness of topsoil.
If sufficient topsoil is not available on the site, topsoil meeting
the requirements of the Ocean County Soil Conservation District shall
be provided to result in a four inch minimum thickness.
2. Tree removal. All tree removal shall be in accordance with the requirements
of the Berkeley Township Tree Removal Permit Ordinance.
3. Protection of trees. No material or temporary soil deposits shall
be placed within six feet of any trees or shrubs designated to be
retained on the preliminary and/or final plat.
4. Removal of debris. All tree stumps and other tree parts or other
debris shall be removed from the site and disposed of in accordance
with law. No tree stumps, portions of a tree trunk or limbs shall
be buried anywhere in the development. All dead or dying trees, standing
or fallen, shall be removed from the site. If trees and limbs are
reduced to chips they may, subject to the approval of the Township
Engineer, be used as mulch in landscaped areas.
5. Slope plantings. Landscaping of the area of all cuts or fills and
terraces shall be sufficient to prevent erosion and shall be approved
by the Board. All roadway slopes steeper than one foot vertically
to three feet horizontally shall be planted with suitable cover plants
combined with grasses and/or sodding. Grasses or sodding alone shall
not be acceptable.
6. Selective thinning. Throughout the development, except in areas specifically
designated to remain in their natural state, in landscaped or buffer
areas, on building lots and in open space areas for public or quasi-public
use, the developer shall selectively thin or remove all dead or dying
vegetation, either standing or fallen, and shall remove, including
grubbing out stumps, all undesirable trees and other growth. The developer
shall, in accordance with overall site development and his proposed
landscaping scheme, provide pathways approximately four feet wide
through all public or common open space in heavily wooded areas. Such
pathways should be sited to conform to the existing natural conditions
and should remain unobstructed. They are not intended to provide improved
walkways but only to provide easy access through open space areas.
7. Additional trees in single-family and two-family subdivisions. Besides
the screening and shade tree requirements, additional trees shall
be planted throughout the subdivision in accordance with a planting
plan approved by the Board at the time of final approval. The number
of trees planted shall be not less than one per dwelling unit. These
trees may be planted on the individual lots; clustered in groupings
in areas of open space; or added to the screening and buffering requirements
contained herein. Flowering trees or evergreens may comprise up to
30% of the total plantings.
8. Additional Landscaping. In conjunction with all uses, all areas of
the site not occupied by buildings, pavement, sidewalks, required
screening, required parking area landscaping, required safety islands
or other required improvements shall be landscaped by the planting
of grass or other appropriate ground cover. Two shrubs and one tree
shall be planted for each 250 square feet of upland common open space.
On waterfront lots or open spaces, the Board may allow a suitable
stabilizing ground cover other than seeding.
9. Trees shall be planted with a minimum diameter of 2 1/2 inches
measured six inches from the base.
10. The Board, after favorable recommendation by the Board Engineer,
and after examination and review, may waive, fully or partially, provisions
of this section in heavily wooded areas, in areas unsuitable for plantings
or because of other exceptional conditions.
11. Specifications. All planting, clearing, selective thinning, topsoiling,
seeding and other landscaping work shall conform to the applicable
requirements of the Standard Specifications.
12. Landscaping Plan. The placement of landscaping shall be in accordance
with a landscaping plan submitted and approved as part of the final
plat.
13. Relocated Plantings. Existing plants may be salvaged and/or relocated
from clearing areas within the development and utilized to meet planting
requirements, provided that:
(a)
Each three items of salvaged and/or relocated plant material
shall be considered equivalent to two items of new plant material.
(b)
All such salvaged and/or relocated plant material shall be of
a type, size and quality acceptable to the Township Engineer.
(c)
All such salvaged and/or relocated plant material shall be dug,
transported and replanted at a season of the year and using a schedule
and equipment, methods and materials conforming to the requirements
of the Standard Specifications.
(d)
The developer has received the approval of the Township Engineer
of the items to be relocated and the schedule and methods of relocation
prior to any work of salvaging and/or relocation taking place.
14. In the Pinelands Area, all landscaping shall also comply with the standards of §
35-157 of this chapter.
l. Shade Trees.
1. In each development of land, the developer shall plant within the
shade tree and utility easements, or between the sidewalk and property
line where such easements are not provided, proper shade and/or decorative
trees at a maximum distance of 50 feet between trees. The minimum
distance between such trees planted shall be 40 feet. Planting sites
shall be indicated on the final plat. Such plantings shall not be
required within sight easements as required elsewhere herein.
2. Planting Requirements.
(a)
All trees planted in accordance with the provisions of this
chapter shall be placed in a proper manner and in a good grade of
topsoil and within the area of the tree well at the point where the
tree is planted. In the event that any individual person or group
of individual persons desires to plant a tree or trees in a tree well
or within the jurisdiction of the Township, such person or persons
may do so, provided that they conform to the provisions of this chapter
and further provided that permission of the Township is obtained.
(b)
All trees planted that are balled and burlapped will require
one stake parallel to the trunk and secured at two points using the
common hose and wire binding methods. All trees planted bare root
will require two stakes parallel to the trunk opposite each other
and secured to same using the common hose and wire binding method.
(c)
All trees will require a three-inch thick mulch layer covering
the area of the hole.
(d)
An identification tag attached at the nursery indicating the
exact variety will be required on at least one tree of each variety
planted.
(e)
The use of more than one species of street tree within a development
is encouraged in order to avoid problems associated with monoculture.
3. All shade trees to be hereafter planted in accordance with this chapter
shall be nursery grown or of substantially uniform size and shape
and shall have straight trunks. In the event that circumstances arise
where the use of an ornamental tree is applicable, a formal request
should be made to the Board for review.
4. Subsequent replacement plants shall conform to the type of existing
tree in a given area. In a newly planted area, only one type of tree
may be used on a given street. Trees shall be planted with a minimum
diameter of 2 1/2 inches measured at six inches from the base.
5. A hole in which a tree is to be planted shall, in each case, be 1/3
larger in width and in depth than the existing root ball of the particular
tree to be planted. The hole for a tree to be planted shall contain
proper amounts of topsoil and peat moss, but no chemical fertilizer
shall be added until the tree has been planted for one year.
6. In areas adjacent to salt water, such as bays, brackish rivers or
lagoons, plantings may be one of the following kinds of trees, the
maximum size and characteristics of which follow:
(a)
Sycamore maple (Acer pseudo-platanus): 60 to 70 feet tall; rapid
growing shade tree; large spreading head.
(b)
London plane tree (Platanus acerifolia): 70 to 100 feet tall;
grows rapidly, especially on moist sites.
7. In the upland, which is away from rivers, bays and lagoons, and not
adjacent to large bodies of water, plantings shall be one of the following
kinds of trees, the maximum size and characteristics of which follow:
(b)
Hop hornbeam (Ostrya virginiana): 30 to 40 feet tall; leaves
turn yellow in fall; broad rounded crown.
(c)
Bradford callery pear (Pyrus calleryana Bradford): grows 30
to 40 feet high; masses of white flowers; glossy green foliage turns
bright crimson in fall.
(d)
Mount hope norway maple (Acer platanoides f. erectum): grows
30 to 40 feet high; globe-shaped top.
(e)
Japanese zelkova (Zelkova serrata village green): grows to greater
than 40 feet tall; dark green foliage turning rusty red color in fall.
(f)
Scholar tree (Sophora japonica regent): 30 to 40 feet tall;
with creamy white flowers from July through September; lovely spreading
tree.
(g)
Red oak (Quercus rubra): 60 to 80 feet tall; leaves turn deep
red or orange in fall; broad symmetrical crown.
(h)
Pin oak (Quercus palustris): 60 to 80 feet tall; grows rapidly
in well-drained soils; pyramidal crown; excellent autumn foliage.
(i)
Willow oak (Quercus phellos): 70 to 80 feet tall; leaves turn
yellow in fall; dense rounded crown.
(j)
Summershade norway maple (Acer platanoides): grows to heights
greater than 40 feet; dark green foliage; shapely upright head.
(k)
Ginkgo biloba (Salisburia): 50 to 75 feet high; picturesque,
exotic stately.
(l)
Green spire linden (Tilia cordata greenspire): 30 to 40 feet
high; attractive fragrant flowers; small leathery dark green foliage.
8. In areas adjacent to fresh water rivers and lakes, plantings shall
be one of the following kinds of trees, the maximum size and characteristics
of which follow:
(a)
Sweet gum (Liquidambar styraciflua): 80 to 120 feet high; rich
red foliage in fall; tall and symmetrical.
(b)
Willow oak (Quercus phellos): 70 to 80 feet tall; pyramidal
shape; leaves turn yellow in fall.
(c)
London plane tree (Platanus acerifolia): 70 to 100 feet tall;
grows rapidly, especially on moist sites.
(d)
Crimson king maple (Acer platanoides); height to 50 feet; brilliant
crimson leaves; color retained throughout summer.
(e)
Thornless honey locust (Gleditsia
triacanthos var. inermis): 60 to 70 feet high. Acceptable varieties
are:
[1]
Skyline honey locust, pyramid form with ascending branches (60°
to 90° angle); compact dark green leaves.
[2]
Shademaster (Plant Patent No. 151) ascending branches, dark
green leaves.
(f)
Marshall's green ash (Fraxinus Pennsylvania marshall's): deep
rooted; glossy foliage; can withstand moist soils.
9. On other beaches, both oceanfront and bay front:
(a)
Regent scholar tree (Sophora japonica regent): grows 40 to 50
feet tall.
(b)
Japanese black pine (Pinus thunbergii): grows 30 to 40 feet
tall; plant in full sun.
10. All shade trees shall be planted in accordance with the landscaping requirements of the Standard Specifications. Other trees not listed in Subsections
6 through
9 above may be utilized if approved by the Board Engineer.
11. Street trees shall be planted in one of the following manners:
(a)
Formal alee of street trees with a uniform distance between
trees on both sides of the street.
(b)
A naturalized grouping of street trees where the street varieties
are varied, spacing the trees three feet to 15 feet from the curbline.
The total number of street trees shall average one for every 45 linear
feet of street, measured at the curbline. If existing trees are preserved
within five feet of the curb, the requirements for street tree planting
may be reduced.
m. Route 9 Corridor. (Diagrams referred to herein may be found at the end of Subsection
m.)
1. In addition to the applicable requirements of this section, the following
standards shall apply to all properties fronting on NJ Route 9 and
located in the Highway Business (HB) zoning district. They shall apply
specifically to the area within 50 feet of the highway right-of-way
line. All subdivision and site plan applications involving such properties
shall provide a landscaping plan that demonstrates compliance with
these standards. If unique site-specific circumstances such as wetlands,
existing vegetation, or unusual lot configuration preclude the installation
of any of the prescribed landscaping elements, the applicant shall
provide an alternative plan that incorporates as many elements as
is feasible. In all cases, however, the sidewalk element must be provided.
2. General Corridor Plan. Diagrams 1 and 2 depict the overall design
concept to be achieved along the corridor.
3. Planting Details (General). Plant selection should conform to the
following general design principles:
(a)
All landscape plants shall be typical full specimens conforming
to the American Association of Nurserymen Standards (ANA) for quality
and installation.
(b)
Local soil conditions and water availability shall be considered
in the plant selection. All plants shall be tolerant of specific site
conditions. The use of indigenous species may be appropriate.
(c)
Landscaping shall not inhibit access by emergency vehicles or
inhibit visibility within required vehicular sight triangles.
(d)
Irrigation systems are to be provided for all new plantings.
(e)
An appropriate variety of tree species shall be provided to
avoid die-out due to species-specific diseases.
4. Street Tree Details. In addition to the requirements found in Subsection
38-45.1, street trees shall be provided in accordance with the following:
(a)
Placement of street trees shall conform to Diagrams 1 and 2.
(b)
The number of street trees shall average one for every 35 linear
feet of property frontage.
(c)
Spacing between trees shall be determined based upon species
selection. In general, trees should be between 30 and 50 feet on center.
(d)
Trees should be a minimum of 3 1/2 to four inches caliper,
based on ANA standards.
(e)
Trees are to be disease resistant and tolerant of road salts
and air pollution.
(f)
On properties with more than one tree species, species shall
not be alternated one-by-one; instead a single species shall be grouped
together to create a canopy effect.
(g)
Branching height shall bear a relationship to the size and species
of tree but shall have a minimum clearance height of seven feet above
grade before branching begins.
5. Buffer Details. A landscaped buffer shall be provided in the last
10 feet of the setback area in accordance with the following:
(a)
A shrub mass of deciduous and/or evergreen species shall be
planted within the required buffer area to provide for a visual and
physical screen along the entire frontage. Shrubs within the buffer
shall primarily include evergreen species, although deciduous plants
may be used provided that their use does not result in significant
visual openings during the winter season. This landscape mass shall
be interspersed with the required ornamental and evergreen trees to
provide for a natural, random and visually interesting plant scheme.
The purpose of the buffer plantings is to define the corridor visually
as a pedestrian way by providing scale and to lessen the impact of
a harsh edge due to development.
(b)
Location, placement and spacing of plant material shall conform
to Diagrams 1 and 2.
(c)
Selection of plants species shall provide for a variety and
mixture of landscaping. Varieties shall consider susceptibility to
disease, shapes, seasonal display, textures, flowers, and foliage.
(d)
The plant quantities constituting the buffer shall include:
(1)
Shrubs averaging 25 per 100 linear feet of frontage.
(2)
Ornamental trees averaging two per 100 linear feet of frontage.
(3)
Evergreen trees averaging two per 100 linear feet of frontage.
(4)
Lawn or groundcover to complete the required ten-foot wide landscape
buffer outside of the required shrub/tree planted area.
(e)
Required plantings in the buffer area shall meet the minimum
size requirements as follows:
(1)
Shrubs: planted size is to be a minimum of 24 inches to 36 inches
in height.
(2)
Ornamental trees: planted size is to be a minimum of five feet
to six feet in height.
(3)
Evergreen trees: planted size is to be a minimum of five feet
to six feet in height.
6. Grass Berm Details. Grass berms shall be provided in accordance with
the following:
(a)
Berms shall be limited to the areas indicated in Diagrams 1
and 2.
(b)
Berms are to be both vertically and horizontally meandering
to achieve a naturalistic landscape by de-emphasizing the linearity
of the Route 9 corridor. Requirements for berm design are noted in
Diagrams 1 and 2. Berms are not to be continuous for the entire length
of the frontage but shall allow for breaks as indicated in Diagram
1. Berms are not to be terminated abruptly at the ends of the lot
lines but are to transition to existing grade in a naturalistic fashion.
(c)
Berm design shall not adversely affect natural drainage.
(d)
Berms at driveway openings should conform to Diagram 3.
7. Sidewalk Details. A continuous sidewalk shall be provided in accordance
with the following:
(a)
The location and placement of a sidewalk shall conform to Diagrams
1, 2 and 3 as applicable.
(b)
Standard Township construction details for the sidewalk shall
be utilized and shall be approved by the Township Engineer.
8. Driveway Crossing Details. The following elements and standards apply
to all driveway crossings. Driveway crossing treatment is necessary
to warn both pedestrians and motorists of each other's presence. Certain
elements contained herein will provide visual cues to motorists that
pedestrian crossing zones are nearby. The arrangement of the design
elements is depicted in Diagram 3. Additional elements and standards
specific to the driveway crossings are set forth below.
(a)
Painted crosswalks shall be provided in accordance with the
following:
(1)
Location and placement of painted crosswalks shall conform to
Diagram 3.
(2)
Standard Township construction details for such striping shall
be utilized and shall be approved by the Township Engineer. In the
event that the Township has not adopted such standards, then generally
accepted engineering standards, as set forth in engineering and construction
manuals shall be used as approved by the Township Engineer.
(3)
Painted crosswalks shall be skid-resistant.
(b)
Handicapped ramps shall be provided in accordance with the following:
(1)
Location and placement of handicapped ramps shall conform to
Diagram 3.
(2)
All sidewalks shall taper down to meet grade at the intersection
with a driveway. Ramps shall be provided in these areas to allow for
full accessibility as per Americans with Disabilities Act (ADA) guidelines.
Standard Township construction details for such ramps shall be utilized
and approved by the Township Engineer. In the event that the Township
has not adopted such standards, then generally accepted engineering
standards, as set forth in engineering and construction manuals shall
be used as approved by the Township Engineer.
(c)
A raised median shall be provided if the driveway opening into
the developed property exceeds two lanes and shall conform to the
following:
(1)
Median shall be placed at the centerline of all new driveways
extending from the intersection with the Route 9 right-of-way to the
fifty-foot minimum setback line required for parking and/or interior
drives into new developments.
(2)
Median shall be a four-foot wide brick paver island edged by
a six-inch vertical granite block curb.
(3)
Brick shall be a four-inch by eight-inch rectangular shape and
placed in a herringbone pattern. Brick color shall be a red/charcoal
blend. A suitable alternative material, pattern and color may be substituted
if approved by the Planning Board and Township Engineer, although
some consistency should be maintained throughout the corridor.
(4)
The median shall allow for an opening at the crosswalk locations.
Location and placement of crosswalks shall conform to Diagram 3.
(d)
Bollards shall be provided wherever the planning board determines
that the expected volume of traffic accessing the site necessitates
additional pedestrian safety features. The bollards shall be located
where a sidewalk engages a driveway in accordance with Diagram 3.
Bollards shall conform to the following:
(1)
Lighted bollards shall be located and placed to warn both pedestrians
and motorists of each other's presence at the crosswalks. Lighted
bollards will provide visual cues to motorists.
(2)
Lighted bollards shall be a minimum 36 inches in height with
a 100-watt metal halide or high-pressure sodium lamp. Bollards should
provide a minimum maintained illumination level of 0.5 footcandles
in the crosswalk area.
9. Flower Pocket Details. The installation of flower pockets is optional.
If they are installed they shall be provided in accordance with the
following:
(a)
Location and placement of flower pockets shall conform to Diagrams
1, 2 and 3.
(b)
A minimum of 200 square feet of wildflowers and/or perennials
constitutes one pocket. One pocket shall be provided per 100 linear
feet of frontage with additional pockets provided at driveway crossings.
(c)
Wildflowers, if used, are to be hardy and native regional mixtures.
Mixture selection shall provide for a blend of species in approximate
equal amounts. Mixtures shall include a variety of colors. The selection
of mixtures should consider the existing soil conditions. The specific
blend is subject to the approval of the Township Engineer or landscape
architect. Wildflower pockets shall be mowed once a year. Mowing shall
occur in the late fall while the wildflowers are dormant.
(d)
Perennials shall be hardy and include either a mix of colors
or single stands of one color. Perennials shall be approved by the
Township Engineer or landscape architect.
Diagram 1
(Section 30-48m)
|
Diagram 2
(Section 30-48m)
|
Diagram 3
(Section 30-48m)
|
n. Buffer areas where deemed appropriate by the engineer shall be utilized
for stormwater management by disconnecting impervious surfaces, incorporating
low-impact design and green stormwater facility concepts such as rain
gardens.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
o. Buffer areas shall include additional landscape standards incorporating
native vegetation.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
[Ord. No. 94-29 § 118-14.4A]
All development and lots on tidal lagoons, navigable waterways
or other bodies of water, either existing or proposed shall provide
for bulkheading. The areas shall be enclosed with pressure-treated
timber bulkheads or precast or poured reinforced concrete bulkheads
or marine alloy steel conforming to design plans prepared by a licensed
professional engineer in the State of New Jersey, and the plan shall
be approved in writing by the Township Engineer and the Construction
Code Official before such work is begun.
[Ord. No. 94-29 § 118-14.4B; Ord. No. 09-15-OA § 2; reserved
by Ord. Nos. 2016-34-OAB, 2017-01-OAB, 2017-16-OAB]
[Ord. No. 94-29 § 118-14.5]
In zoning districts where bulk storage is a permitted use, the
following minimum requirements shall apply:
a. No bulk storage of materials or equipment shall be permitted in any
required front yard area or within 100 feet of any public street,
whichever is greater.
b. No bulk storage of materials or equipment shall be permitted between
any side or rear lot line and the required side or rear setback line.
c. All bulk storage areas shall be screened from public view by means
of suitable fencing and/or evergreen plantings as required by the
Board.
d. No fence used to screen a bulk storage area shall be placed closer
to any property line than the distance constituting the required front,
side or rear setbacks, and all setback areas shall be landscaped in
accordance with the requirements of this chapter.
e. All service roads, driveways and bulk storage areas shall be paved
with bituminous concrete or other surfacing materials, as required
by the Board, which shall be of sufficient strength to handle the
anticipated use.
f. In no instance shall on-site bulk storage of material exceed the
height of 10 feet.
g. No heavy equipment shall be operated or parked closer to the front
property line than the required front setback, except as the same
may be in transit to or from the site.
h. No bulk storage shall be stored within 50 feet of a stormwater management
basin/facility, as deemed appropriate by the Municipal Engineer.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
[Ord. No. 94-29 § 118-14.6]
a. All grading, excavation or embankment construction shall be in accordance
with the approved construction drawings and shall provide for the
disposal of all stormwater runoff and such groundwater seepage as
may be encountered. All clearing, excavation and embankment construction
shall be in accordance with the applicable requirements and approved
construction drawings. No excavated material may be removed from the
site except in accordance with an approved construction drawing nor
without the prior approval of the Township Engineer. Where borrow
excavation materials from off-site sources are required to complete
the necessary grading, such material shall meet the requirements of
the Standard Specifications for Borrow Excavation, and shall be subject
to the approval of the Township Engineer.
b. Material which the Township Engineer judges unsuitable for use in
roadway embankment may be used for grading outside the roadway right-of-way
and for grading outside of building areas. Any unsuitable material
which cannot be satisfactorily utilized on the site shall be removed
from the site and disposed of as required by law.
c. All construction layout and grading stakes shall be set by a licensed
land surveyor or professional engineer employed by the developer or
his contractor.
d. All rough grading within rights-of-way must be completed prior to
the construction of roadway subgrade. All sidewalk areas and slope
areas must be fully graded prior to the construction of finished pavements
or pavement base courses.
e. To preserve the integrity of pavements, embankments and excavations
for streets or roadways shall be provided with slopes no steeper than
one foot vertical rise for every three feet of horizontal distance.
f. Such slopes shall be suitably planted with perennial grasses or other
ground cover plantings in accordance with the plans approved by the
Board. In areas where excavations or embankments would extend significantly
beyond road rights-of-way, thereby causing disruption to the natural
environment of the development, the Board may, upon the application
of the developer, consider or may, upon its own initiative, direct
the use of terraces, retaining walls, crib walls or other means of
maintaining roadway slopes. In any event, the entire roadway right-of-way
shall be fully graded, and any retaining walls, crib walls or terraces
shall be located outside of the roadway right-of-way, and their maintenance
shall be the responsibility of the owner of the property on which
they are constructed. The developer shall make suitable provisions
in the instruments transferring title to any property containing such
terraces, retaining walls or crib walls and shall provide a copy thereof
to the Board and the Township Clerk. All unpaved graded areas within
or outside of the roadway right-of-way shall be neatly graded, topsoiled,
fertilized and seeded to establish a stand of perennial grasses.
g. Top of slopes in excavations and the top of slopes in embankment
areas shall not extend into the right-of-way line or, where provided,
the exterior lines of the six-foot wide shade tree and utility easement
required herein. Sidewalk and easement areas shall slope at 2% to
the top of the curb elevation, and sidewalk construction shall conform
to this slope.
h. Lot and Road Grading. Lots shall be graded to secure proper drainage
and to prevent the ponding of stormwater. The grading shall be performed
in a manner which will minimize the damage to or destruction of trees
growing on the land. Topsoil shall be provided and/or redistributed
on the surface as cover and shall be stabilized by seeding or planting.
Grading plans shall have been submitted with the preliminary and final
plats, and any departure from these plans must be approved in accordance
with the requirements of this chapter for the modification of improvements.
Grading shall be designed to prevent or minimize drainage to structures
or improvements when major storms exceeding the design basin of the
storm drainage system occur.
1. The land shall be graded so that the stormwater from each lot shall
drain directly to the street. If it is impossible to drain directly
to the street, it shall be drained to a system of interior yard drainage
designed in accordance with the standards for drainage facilities,
and suitable drainage easements shall be provided.
2. The minimum slope for lawns shall be 2% and, for smooth hard-finished
surfaces, other than roadways, 5/10 of 1%.
3. The maximum grade for lawns within five feet of a building shall
be 10% and, for lawns more than five feet from a building, 25%.
4. Retaining walls installed in slope control areas shall be constructed
of heavy treated timber or logs, concrete, other masonry or of other
construction acceptable to the Board Engineer and adequately designed
and detailed on the final plat to carry all earth pressures, including
any surcharges.
5. Trees which do not interfere with the operations shall not be removed
but shall be protected during the progress of the work. Branches of
trees overhanging the traveled way shall be cut off to a height of
14 feet above it, and cuts made more than one inch in diameter shall
be painted. Tree stumps shall be grubbed out within all areas to be
graded.
6. The Township Engineer or Construction Code Official shall keep a
constant check on debris from development and construction of buildings
and shall not permit accumulations in any development. In the event
that there is any substantial accumulations of such debris in any
development, the Township shall forthwith give written notice to the
developer to remove the debris from the development. In the event
that such debris is not promptly removed, the Township Engineer or
Construction Code Official is hereby authorized and directed to refrain
from giving certificates of occupancy for buildings in the development
and to refrain from issuing building permits until the debris is cleared
up and removed from the development.
7. Wherever the subgrade is established to be coincident with the existing
ground surface, the vegetation and underlying topsoil of the existing
ground surface within excavation and embankment areas shall be stripped
off to a depth of not less than four inches and not more than six
inches. Street and roadway excavation shall be carried out so that
the subgrade throughout the work is kept properly drained.
8. Excavated materials shall be placed in embankment when suitable therefor
or shall be used for backfill or other purposes. Material in excess
of that required shall be disposed of by the developer, contractor
or subcontractor as required by law.
9. Borrow excavation for road construction shall include the furnishing,
transporting, placing and consolidating of materials required for
embankment in excess of that obtained from other excavation and other
incidental work. All borrow excavation shall be suitable for embankment
and approved by the Township Engineer.
10. Where construction occurs adjacent to or in close proximity of any
river, stream, lagoon, channel, wetland or other natural or man-made
body of water, as determined by the Ocean County Soil Conservation
District, the developer/builder contractor shall be required to erect,
prior to commencing construction, a temporary snow fence and silt
fence for the purpose of preventing construction debris and waterborne
or airborne silt from entering the body of water. The snow fence and
silt fence shall be erected parallel to the shoreline, bulkhead line
or wetlands delineation line without destruction or disruption of
water bodies or sensitive areas.
11. Whenever the plans call for pipes and other types of drainage structures
to be located in wet embankment or embankments which will be affected
by high water, except when necessary to maintain flow, such pipes
shall not be placed in embankment until the embankment has been constructed
and consolidated not less than three feet above the top level of the
drain or to the finished level of the embankment, and a trench shall
then be excavated for the placing of the drains.
12. Lot grading shall be in compliance with Chapter
11, Building and Housing, Subsection
11-1.5 of the Township Code.
i. Burying or burning of construction debris or construction materials
shall be prohibited.
1. All builders or owners undertaking construction projects in the Township
of Berkeley shall, as a prerequisite to the Construction Official's
final inspection of the building in question, supply to the Construction
Official verified written documentation that all debris resulting
from the construction has been properly disposed of with the location
and method of the disposal being made known therein.
Common open space or public open space areas proposed to be
provided in conjunction with applications for development for subdivisions
or site plans shall be subject to the following requirements:
[Ord. No. 94-29 § 118-14.7A]
Open space areas within cluster or multi-family developments
shall be subject to all provisions of this section and the zone requirements
and the following specific requirements:
a. The required percentage of open space of the tract of land proposed
for development shall not be included in building lots or streets
and shall be set aside for open space. If the project is to be developed
in sections, it shall be designed in a manner that at any stage of
development the required percentage of land area of the sections approved
is set aside for open space.
b. Each open space area shall contain a minimum of one contiguous acre.
c. Open space areas shall not be less than 50 feet in width at any location,
except that where such open space is to be utilized primarily for
walkway access from a public street to the open space at the rear
of building lots, it may have a minimum width of 20 feet for a length
not to exceed 250 feet.
d. Where possible, all of the following land areas and features shall
be preserved as open space:
1. Floodway and flood hazard areas.
2. Areas containing a significant number of specimen trees.
3. Land and slopes in excess of 10%.
4. Existing watercourses, ponds, bogs and swamps.
5. Land with a seasonal high-water table of less than two feet. Berryland
and Atsion soils usually have a seasonal high-water table of less
than two feet.
6. Coastal or freshwater wetlands and wetlands transition areas, as
defined by the New Jersey Wetlands Act of 1970 and delineated on wetlands
maps prepared by the New Jersey Department of Environmental Protection
and Energy.
7. Open space areas shall show significant stormwater quality and quantity
stormwater management capabilities as deemed appropriate by the Municipal
Engineer. Open space shall include additional landscape standards
incorporating native vegetation.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
[Ord. No. 94-29 § 118-14.7B]
Within upland open space areas, the developer shall make certain
site preparation improvements which may include but are not limited
to the following:
a. Removal of dead or diseased trees.
b. Thinning of trees or other growth to encourage more desirable growth.
c. Removal of trees in areas planned for ponds, lakes, active recreational
facilities or pathways.
[Ord. No. 94-29 § 118-14.7C]
a. If the Master Plan or the Official Map provides for the reservation
of designated streets, public drainageways, flood control basins or
public areas within the proposed development, before approving a subdivision
or site plan the Board may further require that such streets, ways,
basins or areas be shown on the plat in locations and sizes suitable
to their intended uses. The Board may reserve the location and extent
of such streets, ways, basins or areas shown on the plat for a period
of one year after the approval of the final plat or within such further
time as may be agreed to by the developer. Unless during such period
or extension thereof the municipality shall have entered into a contract
to purchase or institute condemnation proceedings according to law
for the fee or a lesser interest in the land comprising such streets,
ways, basins or areas, the developer shall not be bound by such reservations
shown on the plat and may proceed to use such land for private use
in accordance with applicable development regulations. The provisions
of this section shall not apply to streets and roads, flood control
basins or public drainageways necessitated by the subdivision or land
development and required for final approval.
b. The developer shall be entitled to just compensation for actual loss
found to be caused by such temporary reservation and deprivation of
use. In such instance, unless a lesser amount has previously been
mutually agreed upon, just compensation shall be deemed to be the
fair market value of an option to purchase the land reserved for the
period of reservation, provided that determination of such fair market
value shall include but shall not be limited to consideration of the
real property tax apportioned to the land reserved and prorated for
the period of reservation. The developer shall be compensated for
the reasonable increased cost of legal, engineering or other professional
services incurred in connection with obtaining subdivision approval
or site plan approval, as the case may be, caused by the reservation.
[Ord. No. 94-29 § 118-14.7D]
Portions of proposed open spaces may be designated for passive
and/or active recreational activities. Passive recreational activities
may include but are not limited to pedestrian paths, bicycle paths,
sitting areas and naturally preserved areas. Active recreational activities
may include but are not limited to swimming pools, tennis courts and
ball fields. The location and shape of any land to be designated for
recreational activities shall be approved by the Board based on but
not limited to the following standards:
a. The Board shall consider the natural topography and shall attempt
to preserve the same to the greatest extent possible.
b. The Board shall attempt to tailor the location and shape of recreational
areas to harmonize with the shape of the entire development.
c. The Board shall consider the recreational areas in terms of their
effect upon the ordinances of the Township governing tree removal,
soil disturbance and other environmental factors.
d. The Board shall consider the extent to which specific recreational
areas shall be used for passive or active recreational purposes.
e. The Board shall request and consider recommendations from the Township
Recreation Department.
f. The Board shall consider the extent to which the residents of the
development shall be served by other existing or future recreational
facilities or lands within or in the vicinity of the development.
g. The Board shall consider the sequence of development.
h. The Board shall consider the effect which the location and shape
of recreational areas in the development will have upon the application
of sound planning principles as well as the general welfare, health
and safety of the residents of the development.
[Ord. No. 94-29 § 118-14.7E]
a. The type of ownership of land dedicated for open space purposes shall
be selected by the owner, developer or subdivider subject to the approval
of the Board and may include but is not necessarily limited to the
following:
1. The Township of Berkeley, subject to acceptance by the Township Council.
2. Other public jurisdictions or agencies, subject to their acceptance.
3. Quasi-public organizations, subject to their acceptance.
4. Homeowners' or condominium associations or analogous organizations.
5. Shared, undivided interest by all property owners in the development.
b. Any lands dedicated for open space purposes shall contain appropriate
covenants and deed restrictions approved by the Board, which ensure
that:
1. The open space area will not be further subdivided in the future.
2. The use of the open space areas will continue in perpetuity for the
purpose specified.
3. Appropriate provisions are made for the maintenance of the open space
areas.
[Ord. No. 94-29 § 118-14.7F]
a. The Township or other governmental agency may, at any time and from
time to time, accept the dedication of land or any interest therein
for public use and maintenance, but the Board shall not require, as
a condition of approval, that land proposed to be set aside for common
open space be dedicated or made available to public use.
b. The developer shall provide for an organization for the ownership
and maintenance of any open space for the benefit of owners or residents
of the development, if the open space is not dedicated to the Township
or other governmental agency. Such organization shall not be dissolved
and shall not dispose of any open space, by sale or otherwise, except
to an organization conceived and established to own and maintain the
open space for the benefit of such development, and thereafter such
organization shall not be dissolved or dispose of any of its open
space without first offering to dedicate the same to the Township.
c. In the event that such organization shall fail to maintain the open
space in reasonable order and condition, the Township may serve written
notice upon the organization or upon the owners of the development
setting forth the manner in which the organization has failed to maintain
the open space in reasonable condition, and the notice shall include
a demand that such deficiencies of maintenance be cured within 35
days thereof, shall state the date and place of a hearing thereon
which shall be held within 15 days of the notice. At such hearing,
the Township may modify the terms of the original notice as to deficiencies
and may give a reasonable extension of time not to exceed 65 days
within which they shall be cured. If the deficiencies set forth in
the original notice or in the modification thereof are not cured within
the 35 days or any permitted extension thereof, the Township, in order
to preserve the open space and maintain the same for a period of one
year, may enter upon and maintain such land. The entry and maintenance
shall not vest in the public any rights to use the open space except
when the same is voluntarily dedicated to the public by the owners.
Before the expiration of the year, the Township shall, upon its initiative
or upon the request of the organization theretofore responsible for
the maintenance of the open space, call a public hearing upon 15 days'
written notice to such organization and to the owners of the development,
to be held by the Township, at which hearing such organization and
the owners of the development shall show cause why such maintenance
by the Township shall not, at the election of the Township, continue
for a succeeding year. If the Township shall determine that such organization
is ready and able to maintain the open space in reasonable condition,
the Township shall cease to maintain the open space at the end of
the year. If the Township shall determine that such organization is
not ready and able to maintain the open space in a reasonable condition,
the Township may, in its discretion, continue to maintain the open
space during the next succeeding year, subject to a similar hearing
and determination in each year thereafter. The decision of the Township
in any such case shall constitute a final administrative decision
subject to judicial review.
d. The cost of such maintenance by the Township shall be assessed pro
rata against the properties within the development that have a right
of enjoyment of the open space in accordance with assessed value at
the time of imposition of the lien and shall become a lien and tax
on the properties and shall be added to and be a part of the taxes
to be levied and assessed thereon and shall be enforced and collected
with interest by the same officers and in the same manner as other
taxes.
[Ord. No. 94-29 § 118-14.8A]
All concrete used in any subdivision or site improvement shall
be prepared in accordance with the requirement of the standard specifications
for the various classes of concrete used, except that the twenty-eight-day
compressive strength of the concrete used shall not be less than the
following:
Type of Concrete
|
Strength
(pounds per square inch)
|
---|
Class A
|
4,500
|
Class B
|
3,500
|
Class C
|
3,000
|
Class D
|
2,500
|
[Ord. No. 94-29 § 118-14.8B]
Unless specific written permission is obtained from the Township
Engineer to the contrary, only concrete obtained from dry-batched
redi-mixed trucks shall be allowed.
[Ord. No. 94-29 § 118-14.8C]
Concrete curbing shall be constructed along the edge of all
paved surfaces. This curb shall have a minimum top width of six inches,
a minimum depth of 18 inches, a minimum base width of eight inches
shall extend six inches above the paved gutter. Construction of the
curb shall be in conformance with the Standard Specifications.
[Ord. No. 94-29 § 118-14.8D]
Curb and/or combination curb and gutter shall be constructed
along both sides of every street within a development. Any existing
pavements damaged by curb construction shall be repaired to the standards
herein and/or as shown on the final plat. Where one side of the development
boundary is along an existing street, the curb and/or curb and gutter
shall be constructed only on the development side. Curbs and/or combination
curbs and gutters shall be constructed of Class B concrete, air-entrained,
in accordance with the requirements of the Standard Specifications.
Preformed bituminous cellular-type joint filler, 1/2 inch thick, cut
to match the cross section of the curb, shall be used at all expansion
joints at intervals not greater than 20 feet. Intermediate plate joints
shall be provided at intervals not exceeding 10 feet. At places where
a concrete curb abuts portland cement concrete pavement, joints in
the curb shall be placed to match the paving joints, and intermediate
joints shall be placed so as to create equal curb panels not longer
than 20 feet. When concrete curb and gutter is required, the gutter
shall be eight inches thick and shall be constructed of Class B air-entrained
concrete. Joints in the gutter shall be formed simultaneously with
joints in the curb. The requirements of the Standard Specifications
regarding curing precautions must be strictly observed.
[Ord. No. 94-29 § 118-14.8E]
Use of combination curb and gutter will be allowed in all areas
with the following exceptions:
a. Both sides of a street for the entire block length shall be constructed
with one type of curb; that is, where only a portion of a block is
required to have combination curb and gutter, the entire block shall
be constructed using the combination curb and gutter.
b. Where 50% or more of the curb length of any street would be required
to have combination curb and gutter, the entire street shall be constructed
with combination curb and gutter.
c. Where 50% or more of any subdivision is required to have a combination
curb and gutter, the entire subdivision shall be constructed with
combination curb and gutter.
[Ord. No. 94-29 § 118-14.8F]
In areas with bituminous concrete pavement, required curb and/or
curb and gutter shall be constructed prior to the construction of
the bituminous base courses. Any required repairs to curbs and/or
combination curb and gutter which are not suitable for acceptance
shall be made prior to construction of the final pavement wearing
course.
[Ord. No. 94-29 § 118-14.8G]
In certain instances it may be necessary or desirable to construct
alternate curb types. For example, these may be required by the Board
on the perimeter of channelizing islands or in the areas of unusually
heavy gutter drainage flow, or may be desired by the developer for
decorative purposes or to preserve vegetation (e.g., granite block
curb, rolled concrete curb, etc.). If alternate curb types are to
be permitted, an appropriate construction detail shall be submitted
for approval by the Board as a design exception with the preliminary
and final plats. Continuous slip-formed curb or combination curb and
gutter may be permitted if such is considered to be acceptable by
the Township Engineer. The use of continuous slip-formed curb or combination
curb and gutter may only be permitted if the applicant submits for
review and approval details and specifications concerning equipment,
materials and methods proposed for use and if the Township Engineer
has inspected the installation and tested and approved a suitable
sample section of curb or combination curb and gutter. In the event
that the Township Engineer does not approve the sample section of
curb or combination curb and gutter, the developer shall remove the
sample section and replace it with a type of curb or curb and gutter
permitted by this chapter or such other alternate as may be approved
by the Board.
[Ord. No. 94-29 § 118-14.8H]
a. Forms for concrete curbs shall be metal and shall be constructed
to conform to the lines and grades established by the Engineer and
to the exact dimensions of the structure. They shall be substantially
constructed, strong, rigid and mortar-tight and properly braced and
tied. Forms shall be designed so that they can be removed without
causing damage to the concrete. Forms must be cleaned and oiled before
use. Forms for curved alignment may be dressed lumber or plywood of
sufficient strength, properly braced, cleaned, oiled, to exact dimensions
of the curb, true to line and grade, without bulges and warps. Unsatisfactory
form work shall be removed and replaced.
b. Straight forms shall not be used on curbs where the Engineer or his
representative determines upon the need for the use of acceptable
flexible metal or wooden forms. Curves of less than 250 feet radius
will require flexible forms.
[Ord. No. 94-29 § 118-14.81]
a. The concrete shall be tamped and spaded or vibrated so that the forms
are completely filled, the concrete thoroughly compacted and the mortar
flushed to the face and top. Before initial set, the top and, as soon
as the front forms can be removed, the face, shall be finished with
a wood float to an even, smooth and dense surface. Expansion joints
shall be provided at intervals of 20 feet and shall be filled with
a 1/2 inch cellular compression material to within 1/4 inch of the
top and face. Where the curb is adjacent to other concrete, 1/4 inch
premolded expansion joints shall be provided. Concrete curbs shall
not be constructed when the atmospheric temperature is liable to be
below 32° F. in the ensuing 24 hours. If, and where, after form
removal, air holes or very slight imperfections appear in the top
and face of the curb, they may be evened up by wetting the face of
the curb with clean water brushed on and rubbed with a wooden float.
Patching extensive honeycombed faces is not permitted, and such curbing
shall be removed and replaced. Slight honeycombing in the rear of
curbs may be patched with one to two mortar mix if done before the
concrete has taken its final set. Serious honeycombing must be avoided
in order to offset such curb removal and replacement.
b. The top one-corner edge of all curbs adjoining streets shall be rounded
with a one inch radius tool prior to initial set.
[Ord. No. 94-29 § 118-14.8J]
All curbing placed shall be cured in accordance with standard
practice, that is, kept moist by covering with wet burlap bags or
straw and kept soaked with water for a period of seven days. In cold
weather, the curing shall be done with a straw covering, as directed
by the Township Engineer.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
Curb cuts or flush curbs with curb stops shall be constructed
to disconnect impervious areas by allowing for the discharge of impervious
areas to landscaped vegetative swales for stormwater management, as
deemed appropriate by the Municipal Engineer.
[Ord. No. 94-29 § 118-14.9]
a. In all developments, the property owner or developer seeking approval
shall be obligated and required to delineate any driveways created
by such subdivision or site plan which are required to fulfill off-street
parking requirements. The driveways shall be properly drained, uniformly
graded and well-compacted, where applicable, and shall be constructed
of bituminous concrete or portland cement concrete. The Township will
inspect the location and suitability of the material used prior to
the issuance of a certificate of occupancy. The Township will not
assume any responsibility for the installation or quality of workmanship.
In addition, all residential driveways shall be six-inch thick portland
cement concrete with a twenty-eight-day compressive strength of at
least 3,500 pounds per square inch from the depressed curb to the
rear of the sidewalk. A 10/10 six-inch by six-inch welded wire fabric
temperature reinforcement shall be provided. The construction beyond
the right-of-way shall either be a continuation of this apron construction
or a two inch FABC surface constructed on a six-inch thick dense graded
aggregate base course.
b. Driveways shall be required as access to any garage or other off-street
parking spaces.
c. Driveways shall be constructed of permeable materials to minimize
stormwater runoff and promote groundwater recharge in accordance with
Section 9.7, Pervious Paving Systems, of the New Jersey Stormwater
Best Management Practices Manual, as amended and supplemented, as
deemed appropriate by the Municipal Engineer.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
[Ord. No. 94-29 § 118-14.10A]
a. If the property on which a proposed development is to be located
is or is proposed to be traversed by a drainage facility of any kind,
including a pipe, channel, stream or swale, the Board may require
that a stormwater and drainage easement or right-of-way along the
facility be provided by the developer. If existing land drainage structures,
such as french drains, are encountered during the course of construction
of any development, such drainage structures shall either be removed
entirely or a revised final plat showing the location of such drainage
structures and accompanied with detailed cross sections thereof shall
be filed with the Board Engineer for consideration by the Board. The
Board, after consulting its Engineer and other appropriate agencies,
shall either require a drainage easement, require that the structure
be removed in part or in its entirety or recommend such other action
to the Governing Body as it deems appropriate.
b. All easements shall be shown on the final plat with a notation as
to the purpose and restrictions of the easement. Easement lines on
the final plat shall be shown with accurate dimensions and bearings
unless the easement lines are parallel or concentric with lot lines.
c. The land which is the subject of an easement or right-of-way shall,
in the case of storm drains or constructed channels, be of a suitable
width meeting the requirements for design of drainage facilities or
be a strip which conforms substantially to the flood plain of any
watercourses along both sides of the watercourse. The easement and
right-of-way shall include provisions assuring the following:
1. Preservation of the channel of the watercourse.
2. Except in the course of an authorized drainage improvement, prohibition
of alteration of the contour, topography or composition of the land
within the easement and right-of-way.
3. Prohibition of construction within the boundaries of the easement
and right-of-way which will obstruct or interfere with the natural
flow of the watercourse.
4. Reservation of a public right-of-entry for the purpose of maintaining
the storm drain, drainage channel or the natural flow of drainage
through the watercourse, of maintaining any and all structures related
to the exercise of the easement and right-of-way and of installing
and maintaining a storm or sanitary sewer system or other public utility.
d. The minimum width of easement for installation of a storm sewer up
to 48 inches diameter shall be 20 feet. For pipe sizes over 48 inches
diameter the minimum width of easement shall be the pipe diameter
plus 20 feet rounded to the next highest five-foot increment.
e. For open channels. The minimum width of easement for channel sections
shall be the maximum design top width of the channel section segment
plus 20 feet rounded to the next highest five-foot increment.
[Ord. No. 94-29 § 118-14.10B]
a. Conservation easements may be required along all drainage and stormwater
rights-of-way in the development and may be required also along ponds,
marshes, bogs and streams or other watercourses along which drainage
rights-of-way are not required. Such easements are intended to help
prevent the siltation of streams and other courses and the erosion
of stream banks, other watercourses and adjacent lands. The land subjected
to a conservation easement shall be a strip at least 25 feet independently
located or running adjacent to each side of any required drainage
or stormwater right-of-way. Such conservation easement shall contain
provisions to restrict the removal of trees and ground cover except
for the following purposes: removal of dead or diseased trees; thinning
of trees and other growth to encourage the more desirable growth;
removal of trees to allow for structures designed to impound water;
and removal of trees in areas to be flooded for the creation of ponds
or lakes. The easements shall also prohibit filling or grading of
the lands or the disposal of refuse or waste material of any type
within the limits of the easement.
b. The easement shall be indicated on the plat and shall be marked on
the land by iron stakes wherever the lines of such easement change
direction or intersect lot lines.
c. Replanting within easement areas shall incorporate native vegetation
as deemed appropriate by the Municipal Engineer.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
[Ord. No. 94-29 § 118-14.10C]
In addition to right-of-way widths required for the full design
of all streets and the wider intersections as specified, sight triangle
easements may be required on all corners at all street intersections.
Such easements shall include provisions to restrict the planting of
trees or other plantings or the location of structures exceeding 30
inches in height that would obstruct the clear sight across the area
of the easements and a reservation to the public of a right-of-entry
for the purpose of removing any object, natural or otherwise, that
obstructs the clear sight. Such easements shall include the area on
each street corner that is bounded by points which are the following
distances from the intersection of the curblines, or of their prolongations:
a. Where a local, local collector or minor collector street intersects
another local, local collector or minor collector: 90 feet on each
right-of-way measured along the centerline of the curb lanes of each
approach.
b. Where a local, local collector or minor collector street intersects
a major collector street: 90 feet on the local, local collector or
minor collector and 150 feet on the major collector.
c. Where a local, local collector, minor collector or major collector
street intersects a minor arterial or principal arterial highway:
90 feet on the local street, local collector or minor collector, 150
feet on the major collector and 250 feet on the minor arterial or
principal arterial highway.
d. Where a minor arterial or principal arterial highway intersects a
minor arterial or principal arterial highway: 250 feet on each right-of-way.
e. Where intersections occur on highways or roadways under the jurisdiction
of the State of New Jersey or County of Ocean, the sight triangle
easements required by the State or the County of Ocean may be substituted
in lieu of the requirements above.
f. An applicant may propose, as an alternative to Subsection
35-55.3a through
e,
a reduction in the sight distance along the minor leg of an intersection to 15 feet from the face of the curb of the major leg if a traffic control plan is submitted and approved by the Traffic Safety Officer.
[Ord. No. 94-29 § 118-14.10D]
a. There shall be provided, where possible, practical and deemed necessary
by the Board, a shade tree and utility easement with a minimum width
of six feet in the following locations:
1. Adjacent and parallel to both sides of each new street in a subdivision.
2. Adjacent and parallel to existing streets bordering the proposed
development.
3. At such other locations and/or at greater widths as may be required
by the Board.
b. Such shade tree and utility easements will be utilized for the construction
and maintenance of drainage, utilities, landscaping and shade trees
and for such other municipal or public utility purposes as required.
Such easements shall be considered part of the lots they traverse
for the purpose of determining lot depths, setbacks, frontages and
areas.
c. In cases where a proposed development provides for the extension
of an existing street or abuts an existing street, where shade trees
and utilities have already been installed in a location other than
as specified above, the Board may approve alternate shade tree and
utility easement locations in order to provide for the continuation
of existing construction.
[Ord. No. 94-29 § 118-14.11A;
§ 118-14.11B; § 118-14.11C; § 118-14.11D; § 118-14.12;
§ 118-14.13; amended 9-21-2020 by Ord. No. 20-29-OAB
The impact on the environment associated with development projects
necessitates a comprehensive analysis of the variety of problems that
may result and the measures that can be taken to minimize the adverse
impacts. It is recognized that the level of detail required for the
variety of development applications will vary depending on the size
of the project, the site conditions, the location of the project and
the information already in the possession of the Township. Some flexibility
is needed in preparing the environmental impact statement (EIS). The
EIS requirements pertaining to different types of development application
are listed below:
a. All agricultural operations conducted in accordance with a plan approved
by the Soil Conservation District and all silviculture operations
conducted in accordance with a plan prepared by a professional forester
are specifically exempt from the environmental impact statement requirements.
b. Any variance applications to the Zoning Board of Adjustment not involving
a site plan or subdivision application shall not require an environmental
impact statement unless specifically requested by the Board. The Zoning
Board of Adjustment shall inform the applicant regarding any information
that may be required.
c. All subdivision applications and/or site plan applications shall
be accompanied by an environmental impact statement which shall be
submitted as a prerequisite to a complete application.
d. Amended subdivision or site plan applications shall be accompanied
by a supplemental environmental impact statement which assesses the
environmental impacts associated with any modifications to the original
plan.
e. Any development application or amended development application located
in the Coastal Zone and for which an environmental impact statement
has been prepared and submitted to the NJDEPE as part of a CAFRA application
shall not be bound by the provisions of this section, provided that
a copy of the environmental impact statement submitted as part of
the CAFRA application also accompanies any development application
to the Township Planning Board or Board of Adjustment.
g. Assessment of stormwater impacts, both quantity and quality, shall
be provided within the environmental impact statement and proposed
mitigation strategies as deemed appropriate by the Municipal Engineer.
[Added 12-21-2020 by Ord.
No. 20-46-OAB]
a. All clearing and soil disturbance activities shall be limited to
that which is necessary to accommodate an activity, use or structure
which is permitted by this chapter.
b. Where practical, all clearing and soil disturbance activities associated
with an activity, use or structure, other than agriculture, forestry
and resource extraction, shall:
1. Avoid wooded areas, including New Jersey's Record Trees as published
by the New Jersey Department of Environmental Protection in 1991 and
periodically updated; and
2. Revegetate or landscape areas temporarily cleared or disturbed during
development activities using native, noninvasive plant species appropriate
for the soil types identified on-site, as identified in the County
Soil Survey. Forested areas shall be replanted consistent with N.J.A.C.
7:38-3.9(h)1-10, and any subsequent amendment thereto, to the maximum
extent possible.
c. All applications for subdivision or site plan shall contain a landscaping or revegetation plan which incorporates the elements set forth in Subsection
d below.
d. In order to conserve water, conserve natural features and reduce pollution from the use of fertilizers, pesticides and other soil supplements, all landscaping or revegetation plans prepared pursuant to Subsection
c above shall incorporate the following elements:
1. The limits of clearing shall be identified;
2. Existing vegetation, including New Jersey's Record Trees as published
by the New Jersey Department of Environmental Protection in 1991 and
periodically updated, shall be incorporated into the landscape design
where practical;
3. Permanent lawn or turf areas shall be limited to those specifically
intended for active human use such as play fields, golf courses and
lawns associated with a residence or other principal nonresidential
use. Existing wooded areas shall not be cleared and converted to lawns
except when directly associated with and adjacent to a proposed structure;
and
4. Native, noninvasive plant shrubs and trees species appropriate for
the soil types identified on-site, as identified in the County Soil
Survey, shall be used for revegetation or landscaping purposes. Forested
areas shall be replanted consistent with N.J.A.C. 7:38-3.9(h)1-10,
and any subsequent amendment thereto, to the maximum extent possible.
Other shrubs and trees may be used in the following circumstances:
(a)
For limited ornamental purposes around buildings and other structures;
or
(b)
When limited use of other shrubs or tree species is required
for proper screening or buffering.
e. Development Prohibited in the Vicinity of Threatened or Endangered
Plants. No development shall be carried out by any person unless it
is designed to avoid irreversible adverse impacts that jeopardize
the survival of any local populations of threatened or endangered
plants pursuant to the Endangered Plant Species List Act, N.J.S.A.
13:1 B-15.151 et seq., and any species or subspecies of plant designated
as listed, proposed, or under review by the federal government pursuant
to the Endangered Species Act of 1973, 16 U.S.C. §§ 1531
et seq.
f. Required projects shall demonstrate compliance with this section by conducting an environmental assessment in accordance with §
35-56.4.
g. If the project site contains threatened or endangered plants, then
a habitat evaluation shall be performed in accordance with N.J.A.C.
7:7E-3C.2 and shall include a plan for habitat preservation and protection.
a. No development shall be allowed unless it is designed to avoid irreversible
adverse impacts to habitat that is critical to the survival of local
populations of threatened or endangered animals pursuant to the Endangered
and Nongame Species Conservation Act, N.J.S.A. 23:2A-I 3 et seq.,
and any species or subspecies of wildlife appearing on any federal
endangered species list designated as listed, proposed, or under review
by the federal government pursuant to the Endangered Species Act of
1973, 16 U.S.C. §§ 1531 et seq.
b. Protection of Wildlife Habitat. All development shall be carried
out in a manner which avoids disturbance to distinct fish and wildlife
habitats that are essential to the continued nesting, resting, breeding
and feeding of significant populations of fish and wildlife in the
Township of Berkeley.
c. Required projects shall demonstrate compliance with this section by conducting an environmental assessment in accordance with §
35-56.4.
d. If the project site contains threatened or endangered animals and/or
habitat for threatened or endangered animals, then a habitat evaluation
shall be performed in accordance with N.J.A.C. 7:7E-3C.3 and shall
include a plan for habitat preservation and protection.
When an environmental impact statement is required, the applicant
shall retain one or more competent professionals to perform the necessary
work. The qualifications and background of the professionals shall
be provided, and the method of investigation shall be described. All
applicable material on file in the Township pertinent to evaluation
of regional impacts shall also be considered, including the Township
Master Plan and the Natural Resources Inventory, the New Jersey Department
of Environmental Protection (NJDEP) data and other information as
available. Furthermore, as much original resource as necessary shall
be conducted to develop the environmental impact statement. The inventory
required by this section shall be accompanied by a log indicating
the dates, times, weather conditions and specific site locations of
all on-site inspections. All environmental impact statements shall
consist of written and graphic materials which clearly present the
required information utilizing the following format:
a. Project Description. Indicate the purpose and scope of the proposed
project. Enumerate the benefits to the public which will result from
the proposed project and describe the suitability of the site for
the intended use. A description of the proposed project shall be presented
to indicate the extent to which the site must be altered, the kinds
of facilities to be constructed and the uses intended. The resident
population, working population and visitor population shall be estimated.
The compatibility or incompatibility of the proposed project shall
be described in relation to the following:
1. Township Master Plan, land use and zoning.
2. Berkeley Township Natural Resource Inventory.
3. Master Plan of adjacent municipalities for projects within 200 feet
of an adjacent municipality.
4. Ocean County Master Plan.
5. Regional and state planning guides for development of property over
150 acres or 500 dwelling units.
6. Other pertinent planning documents.
b. Site Description and Inventory. Provide an inventory of environmental
conditions on the site which shall include the following items:
1. Geology. Describe the geologic formations, confining layers, etc.,
including surficial deposits.
2. Soils. The site location should be outlined on a copy of the Ocean
County Soil Survey. A minimum of one soil boring per three acres shall
be performed to a depth of six feet in the area of any disturbance.
The location of the soil borings shall be included on a plan of the
site. Soil profile characteristics shall be described using the standards
set forth in N.J.A.C. 7:9A-5.2(g) and 7:9A-5.3, and any subsequent
amendment thereto.
3. Surface water. Identify and describe all surface water features on
the subject site, including downstream receiving water bodies. The
applicant should incorporate best management practices and best available
technology to minimize impacts associated with stormwater runoff into
surface water bodies. In addition, the applicant shall comply with
federal, state or county surface water requirements and submit any
test results as part of the environmental impact statement.
4. Subsurface water. Describe subsurface water conditions on the site
in terms of aquifers present, depth to ground water and water supply
capabilities. If the area for development is proposed water supply
wells, the name of the aquifer to be utilized must be provided. In
addition, provide information on existing wells within 500 feet of
the site, from existing sources such as the State of New Jersey Department
of Environmental Protection and/or the Ocean County Health Department
relative to depth, capacity, water quality and recharge capabilities.
The Board Engineer and/or the Township Environmental Commission reserves
the right to request additional site-specific information when warranted.
5. Topography and existing development features. Provide topographic
contours and any existing features that are not considered to be part
of the natural environment on the site and a minimum of 100 feet surrounding
the site.
6. Wetlands and State open waters. Freshwater wetlands, transition areas
and state open waters shall be delineated and certified pursuant to
the Freshwater Wetlands Protection Act Rules (N.J.A.C. 7:7A) outside
of the state Pinelands area, and pursuant to the Pinelands Protection
Act rules within the state Pinelands area. The delineation report
and plan shall be submitted as part of the EIS.
7. Floodplains. The floodplain shall be identified and included on the
site plan. Construction within the 100-year floodplain must be approved
by the New Jersey Department of Environmental Protection, Bureau of
Floodplain Management.
8. Vegetation. Describe the existing vegetation on the site. A map shall
be prepared showing the location of major vegetative groupings such
as woodlands, open fields and wetlands. Where woodlands are delineated,
the forest types shall be indicated. The dominant vegetation on the
site shall be listed by genus and species.
9. Wildlife. Prepare an inventory of all wildlife species which may
utilize the subject site, including terrestrial and aquatic vertebrates
and avian species. This inventory shall identify all such species
which were encountered through on-site investigations. All habitat
on-site which is unique to Berkeley Township or the Ocean County region
shall be identified. All habitat which is critical in the maintenance
of wildlife shall also be identified. These areas may include, but
are not limited to, stream corridors, Atlantic White Cedar swamps,
extensive ecotones or cranberry bogs.
10. Endangered or threatened species. Identify any endangered or threatened
species (plant or animal) protected by the state or federal government
which may utilize any portion of the site. The New Jersey Natural
Heritage Program and/or the New Jersey Division of Fish, Game and
Wildlife shall be contacted regarding all endangered or threatened
species sightings within three miles of the project location for animals
or 1.5 miles of the project location for plants. A description of
the type of habitat utilized by any species identified within the
limits described above shall be provided, as well as the identification
of such habitat which is found on-site.
11. Air quality. Provide the most recent quantitative air quality data
from the nearest state sampling station.
12. Noise. Describe the existing noise conditions at the site, including
sources.
13. Cultural, historical and archaeological resources. Identify, describe
and map any existing cultural, historical or archaeological resources.
The Berkeley Township Historical Society and the Office of New Jersey
Heritage shall be contacted for the most recent resource records.
14. Land use. Describe existing land uses and zoning on and within 500
feet of the site.
c. Impact. Provide an assessment of both the adverse and positive impacts
during and after construction. The specific concerns that shall be
considered include the following and shall be accompanied by specific
quantitative measurements where possible and necessary:
1. Soil erosion and sedimentation resulting from surface runoff.
2. Flooding and floodplain disruption.
3. Degradation of surface water quality.
5. Reduction of groundwater capabilities.
8. Vegetation destruction and disruption of vegetative communities.
9. Disruption of wildlife habitats, particularly those of endangered
and protected species.
10. Destruction or degradation of scenic and historic features.
d. Environmental Performance Controls. A description of steps to be
taken to minimize adverse environmental impacts during construction
and operation, both at the project site and in the surrounding region.
Such description shall be accompanied by necessary maps, schedules
and other explanatory data that may be needed to clarify and explain
the action to be taken.
e. Commitment of Resources. A statement concerning any irreversible
and irretrievable commitment of resources which would be involved
in the proposed project and a statement concerning steps which could
be taken which might avoid some or all of the adverse environmental
effects including the no-action alternate.
f. Unavoidable Impacts. A listing and evaluation of adverse environmental
impacts which cannot be avoided, with particular emphasis upon air
or water pollution, increase in noise, damage to natural resources,
displacement of people and businesses, displacement of existing farms,
increase in sedimentation and siltation. Describe all increases in
municipal services and consequences to municipal tax structures. Off-site
impact shall also be set forth and evaluated.
g. Other Required Approvals. As a direct result of the investigations
made under the environmental impact statement, an inclusive listing
shall be provided stipulating the licenses, permits and approvals
required by federal, state, county or municipal law. The status or
copies of these permits and approvals shall also be included.
The environmental impact statement, including appropriate references,
shall be submitted to the Board having jurisdiction with respect to
the development application and the Environmental Commission for its
review and recommendation. Five copies of the environmental impact
statement shall be submitted with the development application prior
to the determination of a complete application.
Notwithstanding the foregoing, the appropriate board may, at
the request of an applicant, waive the requirement for an environmental
impact statement if the Environmental Commission and the appropriate
board find that sufficient evidence is submitted to support a conclusion
that the proposed development will have a negligible environmental
impact. Portions of such requirement may likewise be waived upon a
finding that the complete report need not be prepared in order to
evaluate adequately the environmental impact of a particular project.
a. A certificate of occupancy shall not be issued for any residential
structure located in an area serviced by a public or private water
company unless the distance from the midpoint of the frontage of such
premises to a functioning fire hydrant, which has been tested and
approved by the Township Fire Official, as measured down to the center
line of connecting public streets, is 300 feet or less.
b. Final plats shall not be approved by the Board unless fire hydrants
are indicated on the final plat in accordance with the requirement
herein contained as to location of a distance between fire hydrants.
Prior to the issuance of a certificate of occupancy, such hydrant
shall be full functioning and shall have been tested and approved
by the Township Fire Official or appropriate public or private utility.
c. Fire hydrants shall not be placed at the closed end of a turnaround
of a cul-de-sac unless the distance between the open end and the closed
end is greater than 400 feet, in which event, the fire hydrants shall
be placed at both the open end and the closed end of the cul-de-sac.
However, blowoffs shall be required at the closed end.
d. The installation of fire hydrants with respect to any subdivision
shall not be considered a subdivision improvement to be included in
the bonding requirements of this chapter, but rather the proper installation
of fire hydrants shall be a condition of the issuance of certificates
of occupancy.
e. Flow Capacity Classification.
1. All fire hydrants shall be classified as follows:
(a)
Class A: flow capacity greater than 1,000 gallons per minute.
(b)
Class B: flow capacity of 500 gallons per minute.
(c)
Class C: flow capacity of less than 500 gallons per minute.
2. The flow capacities are to be rated by a flow measurement test at
a period of ordinary demand, the rating to be based on 20 pounds per
square inch of residual pressure. Flow tests shall be conducted at
all points of connection.
f. At all fire stations, a fire hydrant and suction line shall be installed
in accordance with plans and specifications prepared by and filed
in the office of the Township Engineer.
g. Fire hydrant and suction line construction.
1. At fire stations designed on plans, a fire hydrant and suction line
shall be constructed in strict accordance with approved plans.
2. The hydrant shall be of the same type and design as currently in
use by Berkeley Township and shall be approved by the Township Fire
Official.
3. From the hydrant, eight-inch PVC or ductile iron water pipe, with
necessary reducer, elbow or strainer, shall extend to the lagoon.
As per plan, the ten-foot wide easement shall be paved six inches
deep with dense graded aggregate.
4. Final acceptance of fire hydrant and suction lines' installations
shall be subject to field test by the Township Fire Official.
[Ord. No. 94-29 § 118-14.13]
a. Guiderails, pipe railing or other appropriate barricades, as required
by the Board, shall be designed and placed at drainage structures,
streams, embankment limits, curves and other required locations. Guiderails
shall be standard steel-beam type with galvanized steel posts in accordance
with the Standard Construction Details. Alternate designs of guiderails
and barricades may be used and shall be submitted for approval as
part of the final plat submission.
b. Guiderails and/or railings shall be placed at all drainage structures
where the interests of pedestrian or vehicular safety would dictate.
The Board may require that any open channel other than naturally occurring
streams be fenced with forty-eight-inch high chain link fencing if
the banks of the channel are steeper than one foot vertical for every
four feet horizontal and either the total depth of the channel exceeds
four feet or the channel would be expected to have a depth of flow
greater than two feet more often than once every 10 years. For maintenance
purposes, gates may be required by the Board at intervals specified
by the Board.
[Ord. No. 94-29 § 118-14.14]
Lagoons shall be bulkheaded along the water's edge. Bulkheads
shall be constructed at all points along lagoons which abut land dedicated
to public use. This shall apply to streets, rights-of-way, drainage
easements, fire stations, common open space areas for active recreation
and similar areas, except where prohibited by NJDEPE regulations.
[Ord. No. 94-29 § 118-14.15; Ord. No. 06-20-OAB § 4]
a. Lot dimensions and area shall not be less than the requirements of
the respective zone district.
b. Each lot must front upon an approved street at least 50 feet in width.
c. Where extra width is required and dedicated for the future road widening
of existing streets, lot area calculations shall begin at said extra-width
line and all required setbacks shall be measured from said line. All
residential and nonresidential development along the Route 9 Corridor
and all proposed site improvements as defined herein shall be located
outside of the NJDOT Desirable Typical Section.
d. When either on-site sewage disposal or water supply, or both, are
proposed, the minimum lot size may have to be increased. The Board
of Health may require a larger lot size if it deems that such increased
lot size is necessary to accommodate on-site wells and septics.
1. The Planning Board may require larger lots where additional area
will partially or completely eliminate the necessity of changes in
grade which in the opinion of the Board would cause unreasonable destruction
of the topography or environment or would create drainage or erosion
problems.
2. The Planning Board may require larger lots adjacent to major collector,
minor arterial or principal arterial streets where, in the opinion
of the Board, the larger lots would promote the health, safety and
general welfare of the public and the residents of the development.
e. Lot and Block Numbers.
1. In accordance with the Tax Map specifications of the State of New
Jersey dated May 1975, prepared by the State of New Jersey Department
of the Treasury, as amended, subdivided lots and blocks shall generally
bear the original numbers with a number added as a subscript.
2. Prior to final plat approval by the Board, two copies of the map
shall be submitted to the Township Assessor for proper assignment
of lot and block numbers. One copy of the map shall be returned with
the new lot and block numbers shown. The other copy will be retained
for Tax Map purposes.
f. House Numbers.
1. House numbers shall be assigned each lot by the Township Engineer
prior to final plat approval by the Board.
2. The subdivider, upon completion of curbs and streets, shall place
the street number of each lot in the subdivision on the curb or other
conspicuous place.
g. Area and Side Lot Lines. Except as otherwise provided in this chapter,
lot dimensions and area shall not be less than the requirements of
the zoning district. Insofar as is practical, side lot lines shall
be at right angles to straight streets and radial to curved streets.
h. Unsuitable Lots. All lots shall be suitable for the purpose for which
they are intended to be used. To prevent the use of lots which are
not suitable because of adverse topography, rock formation, flood
conditions or similar circumstances, the Board may require such revisions
in a layout of the subdivision as will accomplish one of the following:
1. That the area of the unsuitable lot is included in other lots by
increasing the size of the remaining lots.
2. That it is included in an area to be deeded to the Township or other
public or quasi-public body and will be held in its natural state
for conservation and/or recreation purposes.
3. That some other suitable arrangement is made.
[Ord. No. 94-29 § 118-14.16]
Monuments shall be of a size and shape required by Section 4,
Chapter 358 of the Laws of 1953, and shall be set by a New Jersey
professional land surveyor in accordance with the Statute.
[Ord. No. 94-29 § 118-14.17]
Buildings occupied by the uses hereafter enumerated shall provide
off-street loading spaces as established by this section:
a. Required Number of Off-Street Loading Spaces.
1. School: one loading space.
2. Hospital with a gross floor area under 10,000 square feet: one loading
space; from 10,000 to 30,000 square feet of gross floor area: two
loading spaces.
3. Funeral home: one loading space.
4. Office, hotel, retail service, wholesale, warehouse, manufacturing
or processing or repairing uses with a gross floor area under 10,000
square feet: no loading spaces required; from 10,000 to 25,000 square
feet of gross floor area: one loading space; from 25,001 to 40,000
square feet of gross floor area: two loading spaces; from 40,001 to
60,000 square feet of gross floor area: three loading spaces; from
60,001 to 100,000 square feet of gross floor area: four loading spaces.
b. Size and Location. Each loading space shall be not less than 12 feet
in width, 35 feet in length and have a minimum vertical clearance
of 14 feet and may occupy all or any part of a required yard.
c. Off-street loading facilities for separate uses may be provided jointly
if the total number of spaces so provided is not less than the sum
of the separate requirements for each use, and provided that all regulations
governing the location of accessory spaces in relation to the use
served are adhered to and that no accessory space or portion thereof
shall serve as a required space for more than one use.
d. Unless otherwise permitted, fire zones designated by the Township
Fire Official shall not be used as standing, loading or unloading
areas.
e. Loading areas, as required under this section, shall be provided
in addition to off-street parking spaces and shall not be considered
as supplying off-street parking spaces.
f. No off-street loading and unloading area shall be permitted in any
required front yard area.
[Ord. No. 94-29 § 118-14.18]
In all zones and in connection with every industrial, commercial,
institutional, professional, recreational, residential or any other
use, there shall be provided off-street parking spaces in accordance
with the following requirements and parking lot standards except as
otherwise provided herein.
[Ord. No. 94-29 § 118-14.18A]
a. Each off-street parking space may be perpendicular with the aisle,
parallel with the aisle or at any angle between 60° and 90°.
No angle-parking layout shall be permitted with an angle less than
60°. The following are minimum stall and aisle dimensions.
1. Perpendicular parking and angle parking of 60° to 90°: minimum
stall width for standard parking, nine feet; stall depth, 18 feet;
minimum aisle width, 24 feet.
2. Parallel parking: stall width, 23 feet; stall depth, 10 feet; aisle
width, 12 feet single lane and 20 feet double lane.
3. Parking requirements for disabled individuals shall be in compliance
with the Americans with Disabilities Act Accessibility Guidelines
(ADAAG).
b. No area shall be used for parking if it is not large enough to provide
for at least two contiguous stalls, unless approval otherwise is obtained
from the body, agency or official having jurisdiction over the plan.
c. When the parking area is designed for angle parking and two way traffic,
the stalls on both sides shall be so included as to permit a driver
approaching from either end of the aisle to have access to the stalls
on one side.
d. In parking lots having a capacity of more than 100 cars, a main access
drive shall be provided from points of ingress and egress. No parking
shall be permitted on the main access drive.
e. All parking areas and driveways shall be paved and curbed.
f. Entrance and exit drives shall have a minimum width of 16 feet for
those designed for one-way traffic and 24 feet for those carrying
two-way traffic.
g. All access drive curb radii shall provide a minimum curb radius of
15 feet.
h. Individual parking stalls shall be delineated by hairpin striping
which will be 18 inches to 24 inches in width from outside edge to
outside edge of the stripes and shall be centered over the nine-foot
dimension line at the edge of a parking stall.
[Ord. No. 94-29 § 118-14.18B]
Where parking is permitted between the front building line and
the street line, a safety island or raised median separating the public
street from the parking area shall be provided in accordance with
the following minimum requirements:
a. The width of the safety island shall be that width between the proposed
street curbline and a point five feet inside the property line. When
this width is less than 15 feet, the parking area shall be reduced
to provide a minimum width for the safety island of 15 feet. All required
tree and shrub plantings shall be planted on the on-site portion of
the safety island.
b. Safety islands shall be raised a minimum of six inches above the
adjacent parking area.
c. Safety islands shall be topsoiled and seeded or otherwise landscaped,
except that they may, in the alternative, be constructed of maintenance-free
materials which provide a clear and unmistakable distinction between
the parking area and the safety island.
d. Notwithstanding the use of maintenance-free materials, there shall
be provided at least one deciduous tree two inches in diameter at
breast height every 40 feet or part thereof on all safety islands.
A greater distance will be allowed for plantings if necessary for
traffic safety. The area between trees shall be planted with a minimum
of three evergreen-type shrubs not exceeding 36 inches in height.
e. When parking areas abut the safety island, a continuous wheel stop
shall be provided 2.5 feet from the normal edges of the island and
the minimum depth of stalls shall be increased by one foot. If cast-in-place
curb is used for the wheel stop, it shall be placed as above stated
and the stall depth shall be measured from a point two feet outside
the face of the curb.
[Ord. No. 94-29 § 118-14.18C]
Parking lots having 10 or less spaces shall comply with all applicable requirements of Subsections
35-63.1 and
35-63.2 of this section and shall also be bordered by a five-foot unbroken, landscaped dividing strip along all side property lines from the street line to the rear lot line, unless the Planning Board for good cause shall waive such requirements.
[Ord. No. 94-29 § 118-14.18D]
Parking areas having more than 10 spaces but less than 51 spaces
shall be designed to fulfill the following minimum requirements:
a. A safety island or raised median shall be provided as herein described.
b. A five-foot unbroken, landscaped dividing strip shall be provided
along all side property lines from the street line to the rear lot
line, unless otherwise specified herein.
c. Not more than one two-way access driveway or two one-way access driveways
shall be provided on any one street unless approval otherwise is obtained
from the body, agency or official having jurisdiction over the plan.
d. All safety islands and landscaped dividing strips shall be planted
with at least one deciduous tree having a trunk two inches in diameter
at breast height every 40 feet or part thereof, and the area between
trees shall be planted with a minimum of three evergreen-type shrubs
not exceeding 36 inches in height.
e. All entrance and exit driveways shall be curbed on both sides from
the street curb to a point at the beginning of access driveways or
parking stalls.
[Ord. No. 94-29 § 118-14.18E]
Parking lots which have a capacity for parking more than 50
vehicles shall incorporate the following minimum design standards:
a. All entrance and exit driveways shall be curbed on both sides a minimum
distance of 100 feet back from the street curb or to a major collector
aisle.
b. No parking stalls which shall require the use of the entrance and
exit driveways as access aisles shall be permitted.
c. All access driveways located along one-way streets or divided highways
shall be separate one-way driveways.
d. All directional (one-way) driveways shall be marked by appropriate
signs facing all peripheral service roads serving the property as
well as the parking area.
e. On lots having a frontage of 100 feet or less, driveways, exits and
entrances shall be located as far as practical from an intersection.
On lots having a frontage in excess of 100 feet, driveways, exits
and entrances shall be located as near the middle line as practical.
However, on such lots the entrance or exit driveways need not be located
more than 500 feet from the intersection. For the purpose of locating
the driveways, measurements shall be taken from the curbline of the
intersection.
f. No driveway shall be located less than 10 feet from the side property
line or within 30 feet of an existing drive, whichever is greater.
g. No property having a frontage of less than 100 feet shall have more
than one deciduous tree two inches in diameter at breast height every
40 feet or part thereof on all safety islands. A greater distance
will be allowed for plantings if necessary for traffic safety. The
area between trees shall be planted with a minimum of three evergreen-type
shrubs not exceeding 36 inches in height.
[Ord. No. 94-29 § 118-14.18F]
a. In the event that parking is proposed on a lot or site having a slope
greater than 10%, regardless of size it shall be terraced, utilizing
retaining walls or properly reinforced landbanks and providing for
adequate safety, stability and drainage. At no time should a landbank
that is not reinforced, nor any other earthen material having a greater
elevation than the adjacent parking area, having a slope exceeding
two to one, be used.
b. When retaining walls or landbanks or similar types of earthen material
are necessitated adjacent to or within the parking area, they shall
be kept in good repair or otherwise maintained so as to keep the parking
area free of debris and dirt.
[Ord. No. 94-29 § 118-14.19G]
All uses, including existing uses that are changed, expanded
or modified as to structure or function, shall be bound by the above
requirements. In addition, no unrestricted vehicular access shall
be permitted between adjacent properties. Vehicular access, if agreed
upon by the owners or possessors of adjacent properties, shall be
limited to one opening providing two lanes of traffic and shall be
located in such a manner as to offer continuity of a similar access
drive on the adjacent property. The opening shall occur at a point
having the greatest distance from the street line that would facilitate
the joining of properties. Access shall be denied across the remainder
of the side line by the construction of a landscaped dividing strip
five feet in width on the property being developed. If and when the
adjacent property is developed, there shall be a similar dividing
strip at least five feet wide. All dividing strips shall be landscaped
as provided herein. However, nothing contained in this section shall
be construed as requiring an applicant applying for site plan approval
of an extension of an existing use to adhere to the minimum standards
established by this section for such parking areas as preexisted the
enactment of this chapter, so long as the extended parking area is
not interconnecting with the existing parking area.
[Ord. No. 94-29 § 118-14.19H]
Those areas adjacent to or within the parking area designated
as refuse storage and pickup areas shall be properly screened to prevent
the unsightly display and the scattering of debris. The following
minimum requirements shall apply:
a. The area shall be surrounded on at least three sides by a solid uniform
fence or wall not less than five feet nor more than eight feet in
height and maintained in good condition. The wall of an adjacent building
may serve as one side. The fence shall be exempt from the provisions
of any ordinance of this municipality regulating the height of fences
and requiring permits therefor.
b. The opening in the screening wall or fence shall be so located as
to prevent the visual display of refuse from any adjacent parking
area or street.
[Ord. No. 94-29 § 118-14.19I]
All parking areas shall provide paint striping to delineate
parking stalls, barrier lines, lane lines, directional arrows, stop
lines, fire lanes and other striping as may be required to ensure
safe and convenient traffic circulation. Such striping shall be in
substantial conformance with the Uniform Manual on Traffic Control
Devices.
[Ord. No. 94-29 § 118-14.19J]
All parking areas shall provide traffic control signs and devices
necessary to ensure safe and convenient traffic circulation. Such
devices shall be in substantial conformance with the Uniform Manual
on Traffic Control Devices.
[Ord. No. 94-29 § 118-14.19K]
Any change in use to a use which requires parking and/or storage
space for a greater number of vehicles larger than automobiles than
the previous use shall be required to make application for site plan
approval.
[Ord. No. 94-29 § 118-14.19L]
a. Automotive Repair, Garage, Body Shop. One parking space for each
400 square feet of gross floor area.
b. Automobile Sales. One and five-tenths parking spaces for each 1,000
square feet of gross floor area for exclusive use of customers. In
addition, there shall be provided at least 170 square feet of lot
area for each vehicle stored on the premises to be sold, rented or
otherwise used in the operation of the business. The lot area to be
used to compute the number of vehicles that can be stored on the premises
shall be the total lot area not used for building or customer parking
as herein provided.
c. Automotive Service Station. Five parking spaces for the first service
bay and three parking spaces for each additional service bay.
d. Banks, Savings and Loan Associations and Similar Financial Institutions.
One parking space for each 300 square feet of gross floor area.
e. Bar, Cocktail Lounge, Nightclubs, Restaurants, Cafes and Diners.
One parking space for every four seats and one additional parking
space for each 400 square feet of gross floor area.
f. Barber and Beauty Shops. Three parking spaces for each chair.
g. Bowling Alley. Three and five-tenths parking spaces for each alley.
Parking spaces for other commercial uses within the same building
shall be computed separately in accordance with this chapter.
h. Business Offices. One parking space for each 200 square feet of gross
floor area.
i. Car Washes. Five parking spaces for employees plus off-street storage
space equal to at least three times the number of cars that can be
in the wash process at one time. For self-wash or self-service car
washes, the requirement for employee parking shall be eliminated.
j. Church, Temple or Chapel. One parking space for each four seats in
the main auditorium. Where no individual seats are provided, 24 inches
of bench shall be considered as one seat.
k. College or School, Including Academies, Universities, Technical and
Art Schools and Similar Institutions of Learning. One parking space
for each four seats in the main auditorium plus one parking space
for each administrator, teacher and any other employees.
l. Public or Private Junior High Schools and Elementary Schools. One
parking space for each six seats in the main auditorium plus one parking
space for each administrator, teacher and any other employees.
m. Nursery Schools, Day Camps and Similar Uses. One space for every
employee, one parking space for each vehicle used to transport students
and one additional space for each 500 feet of gross floor area.
n. Community Center, Library, Museum, Art Gallery. One parking space
for each 200 square feet of gross floor area.
o. Community Club, Private Club, Lodge. One parking space for each 100
square feet of gross floor area plus 1 1/2 spaces for each boat
slip where applicable.
p. Convalescent Home, Nursing Home, Rest Home. One parking space for
each three beds plus one parking space for each two employees, including
nurses and other staff.
q. Meeting Rooms, Assembly or Exhibition Halls. Without fixed seats:
One parking space for each 50 square feet of gross floor area; with
fixed seats: one parking space for every four seats.
r. Dental or Medical Offices, Behavioral Health Care Facility, or Residential
Medical Detoxification Center. One parking space for each employee,
one additional parking space for each 250 square feet of gross floor
area.
[Amended 12-16-2019 by Ord. No. 19-44-OAB]
s. Drive-In Restaurant. One parking space for each 35 square feet of
enclosed floor area plus one parking space for each four seats.
t. Driving Range, Miniature Golf. One parking space for each tee or
hole.
u. Furniture, Appliance Stores or Similar Types of Uses Requiring Large
Amounts of Storage. One parking space for each 400 square feet of
gross floor area up to 4,000, plus one parking space for each 800
square feet of gross floor area above 4,000.
v. Government, County or Municipal Offices. Four parking spaces for
each 1,000 square feet of gross floor area.
w. Hardware, Auto Supply Stores. One parking space for each 400 square
feet of gross floor area in the public areas of the store.
x. Hospital — General, Private or Public, Mental, Sanitarium.
One parking space for each 1 1/2 beds plus one space for each
employee on the shift having the greatest number of employees plus
one space for each staff and visiting doctor.
y. Hotel, Motel. One parking space for each rental unit. Parking space
for each commercial use within the building shall be computed separately
according to the requirements for such use set forth herein. The Board
having jurisdiction may allow up to 30% of the required parking for
commercial uses in the hotel or motel to be satisfied by guest room
parking.
z. Laundromats or Similar Coin-Operated Cleaning. One parking space
fore each three cleaning units or fraction of three cleaning units.
aa. Manufacturing or Industrial Establishment, Research or Testing Laboratory,
Bottling Plant or Similar Uses: One parking space for each 500 square
feet of gross floor area or two parking spaces for each three employees,
whichever is greater. If the number of employees or the gross square
footage of the principal building(s) cannot be determined at the time
of application, then sufficient land area shall be reserved to provide
a total number of spaces at the rate of one space for each 300 square
feet of maximum lot coverage.
bb. Marina, Boatyard, Boat Sales. One and one-half parking spaces for
each boat slip plus one space for each employee.
cc. Mortuary, Funeral Home. One parking space for every 50 square feet
in slumber rooms, parlors and funeral service rooms.
dd. Personal Service Establishment. One parking space for each 200 square
feet of gross floor area plus one space for each vehicle used in connection
with the business.
ee. Professional Office, Such as Architectural, Clerical, Engineering,
Legal and Similar Uses. One parking space for each 250 square feet
of gross floor area.
ff. Outdoor Active Recreational Facilities Not Specifically Enumerated.
Two parking spaces per acre for the first 20 acres, one parking space
per acre for the next 20 acres and one parking space for each 10 acres
in excess of 40 acres.
gg. Public and Private Utilities - Electrical Substation, Gas Regulator,
Waterworks, Pumping Station and Similar Facilities. One parking space
for each vehicle stored on the premises plus one parking space for
each employee on the shift which has the greatest number of employees.
hh. Retail Stores, Except Otherwise Specified. One parking space for
each 150 square feet of gross floor area.
ii. Studio - Art, Music Dance - For the Purpose of Giving Instruction.
One parking space for each 100 square feet of floor area used for
giving such instruction.
jj. Shopping Centers. Four and five-tenths parking spaces for each 1,000
square feet of gross floor area. If more than 5% of the enclosed gross
floor area of any shopping center is occupied by malls, lobbies, corridors,
heating plants or other space not utilized for direct commercial purposes,
the Board may allow the required parking to be based on the "gross
leasable area," which, for the purposes of this chapter, shall be
defined as the total floor area designed for tenant occupancy and
exclusive use, including basements, mezzanines and upper floors. This
definition shall not, however, include offices, theaters or similar
non-retail occupancy.
kk. Theater. One parking space for each three seats.
ll. Veterinary or Animal Hospital. One parking space for each 200 square
feet of gross floor area plus one parking space for each staff veterinarian
and employee.
mm. Warehouse, Wholesale, Machinery or Large-Equipment Sales. One parking
space for each 1,500 square feet of gross floor area plus one space
for each vehicle used in connection with the business.
nn. The parking space required for a use not specifically mentioned herein
shall be the same as required for a use of similar nature as determined
by the Board based upon the use enumerated herein which is most similar
to the proposed use. If there is no use enumerated herein having sufficient
similarity to the proposed use to enable the Board to establish rational
parking requirements, the Board may, in its discretion, direct the
applicant to furnish the Board with such data as may be necessary
to enable the Board to establish rational parking requirements.
oo. Medical Marijuana Treatment Center or Alternative Treatment Center.
One parking space for each 200 feet of gross floor area.
[Added 12-16-2019 by Ord.
No. 19-44-OAB]
[Ord. No. 94-29 § 118-14.19M]
In computing the number of above-required parking spaces, the
following rules shall govern:
a. Where fractional spaces result, the required number shall be construed
to be the next highest whole number.
b. Nothing in the above requirements shall be construed to prevent the
joint use of off-street parking facilities by two or more uses, provided
the total of such spaces shall not be less than the sum of the requirements
for various individual uses computed separately by the above requirements.
c. Nothing contained in Subsection
b above shall be deemed to apply to the parking requirements established for shopping centers in Subsection
35-63.12 above unless a use within any particular shopping center shall require parking facilities exceeding 75% of the parking spaces available within the shopping center as a whole.
d. If any one use within any particular shopping center shall require
parking in excess of 75% of the parking spaces available in the shopping
center as a whole, the overall number of parking spaces required for
the shopping center shall be increased by a number equal to 60% of
the number of parking spaces required for the use requiring the highest
number of parking spaces within the shopping center.
e. No part of off-street parking required for a structure or use shall
be included as part of an off-street parking requirement for another
use unless substantial proof and assurances are established that the
use of this parking will not be simultaneous.
f. All required parking facilities shall be located on the same lot
or parcel as the structure or use they shall serve. In the case of
nonresidential uses, parking facilities may be provided on other lots
or parcels but shall not be greater than 300 feet from the structure
or use they shall serve.
g. Where special traffic problems exist, the Board may require a special
survey of conditions at applicant's cost and require the location
of entrances and exits in the parking lot to be altered to minimize
congestion and hazard.
[Added 11-21-2022 by Ord.
No. 22-47-OAB]
a. Purpose. The purpose of this subsection is to promote and encourage
the use of electric vehicles by requiring the safe and efficient installation
of EVSE and Make-Ready parking spaces through municipal parking regulations
and other standards. EVSE and Make-Ready parking spaces will support
the State's transition to an electric transportation sector, reducing
automobile air pollution, greenhouse gas emissions, and storm water
runoff contaminants. The goals are to:
1. Provide adequate and convenient EVSE and Make-Ready parking spaces
to serve the needs of the traveling public.
2. Provide opportunities for residents to have safe and efficient personal
EVSE located at or near their place of residence.
3. Provide the opportunity for non-residential uses to supply EVSE to
their customers and employees.
4. Create standard criteria to encourage and promote safe, efficient,
and cost-effective electric vehicle charging opportunities in all
zones and settings for convenience of service to those that use electric
vehicles.
b. Definitions.
CERTIFICATE OF OCCUPANCY
The certificate provided for in N.J.A.C. 5:23-2, indicating
that the construction authorized by the construction permit has been
completed in accordance with the construction permit, the act and
the regulations. See "State Uniform Construction Code Act," P.L. 1975,
c. 217 (N.J.S.A. 52:27D-119 et seq.) and regulations adopted pursuant
thereto.
CHARGING LEVEL
The amount of voltage provided to charge an electric vehicle
varies depending on the type of EVSE as follows:
1.
Level 1 operates on a 15 to 20 amp breaker on a 120 volt AC
circuit.
2.
Level 2 operates on a 40 to 100 amp breaker on a 208 or 240
volt AC circuit.
3.
Direct-current fast charger (DCFC) operates on a 60 amp or higher
breaker on a 480 volt or higher three phase circuit with special grounding
equipment. DCFC stations can also be referred to as "rapid charging
stations" that are typically characterized by industrial grade electrical
outlets that allow for faster recharging of electric vehicles.
ELECTRIC VEHICLE
Any vehicle that is licensed and registered for operation
on public and private highways, roads, and streets; and operates either
partially or exclusively using an electric motor powered by an externally
charged on-board battery.
ELECTRIC VEHICLE SUPPLY/SERVICE EQUIPMENT or (EVSE)
The equipment, including the cables, cords, conductors, connectors,
couplers, enclosures, attachment plugs, power outlets, power electronics,
transformer, switchgear, switches and controls, network interfaces,
point of sale equipment, and associated apparatus designed and used
for the purpose of transferring energy from the electric supply system
to a plug-in electric vehicle. "EVSE" may deliver either alternating
current or, consistent with fast charging equipment standards, direct
current electricity. "EVSE" is synonymous with "electric vehicle charging
station."
MAKE-READY PARKING SPACE
The pre-wiring of electrical infrastructure at a parking
space, or set of parking spaces, to facilitate easy and cost-efficient
future installation of Electric Vehicle Supply Equipment or Electric
Vehicle Service Equipment, including, but not limited to, Level Two
EVSE and direct current fast chargers. Make-Ready includes expenses
related to service panels, junction boxes, conduit, wiring, and other
components necessary to make a particular location able to accommodate
Electric Vehicle Supply Equipment or Electric Vehicle Service Equipment
on a "plug and play" basis. "Make-Ready" is synonymous with the term
"charger ready," as used in P.L. 2019, c. 362 (N.J.S.A. 48:25-1 et
seq.).
PRIVATE EVSE
EVSE that has restricted access to specific users (e.g.,
single- and two-family homes, executive parking fleet parking with
no access to the general public).
PUBLICLY ACCESSIBLE EVSE
EVSE that is publicly available (e.g., park and ride, public
parking lots and garages, on-street parking, shopping center parking,
non-reserved parking in multi-family parking lots, etc.).
c. Approvals and Permits.
1. An application for development submitted solely for the installation
of EVSE or Make-Ready parking spaces shall be considered a permitted
accessory use and permitted accessory structure in all zoning or use
districts and shall not require a variance pursuant to N.J.S.A. 40:55D-70.
2. EVSE and Make-Ready Parking Spaces installed pursuant to paragraph
d below in development applications that are subject to site plan
approval are considered a permitted accessory use as described in
paragraph c1 above.
3. All EVSE and Make-Ready parking spaces shall be subject to applicable
local and/or Department of Community Affairs permit and inspection
requirements.
4. The Zoning Officer shall enforce all signage and installation requirements
described in this subsection. Failure to meet the requirements in
this subsection shall be subject to the same enforcement and penalty
provisions as other violations of Berkeley Township's land use regulations.
5. An application for development for the installation of EVSE or Make-Ready
spaces at an existing gasoline service station, an existing retail
establishment, or any other existing building shall not be subject
to site plan or other land use board review, shall not require variance
relief pursuant to N.J.S.A. 40:55D-1 et seq. or any other law, rule,
or regulation, and shall be approved through the issuance of a zoning
permit by the administrative officer, provided the application meets
the following requirements:
(a)
The proposed installation does not violate bulk requirements
applicable to the property or the conditions of the original final
approval of the site plan or subsequent approvals for the existing
gasoline service station, retail establishment, or other existing
building;
(b)
All other conditions of prior approvals for the gasoline service
station, the existing retail establishment, or any other existing
building continue to be met; and
(c)
The proposed installation complies with the construction codes
adopted in or promulgated pursuant to the "State Uniform Construction
Code Act," P.L. 1975, c. 217 (N.J.S.A. 52:27D-119 et seq.), any safety
standards concerning the installation, and any State rule or regulation
concerning electric vehicle charging stations.
(d)
Within the Pinelands Area, the proposed installation complies
with the minimum environmental standards of the Pinelands Comprehensive
Management Plan (N.J.A.C. 7:50-6.1 et seq.).
6. An application pursuant to paragraph c5 above shall be deemed complete
if:
(a)
The application, including the permit fee and all necessary
documentation, is determined to be complete;
(b)
A notice of incompleteness is not provided within 20 days after
the filing of the application; or
(c)
A one-time written correction notice is not issued by the Zoning
Officer within 20 days after filing of the application detailing all
deficiencies in the application and identifying any additional information
explicitly necessary to complete a review of the permit application.
(d)
In the Pinelands Area, an application pursuant to paragraph c5 above shall also require the submission of a Certificate of Filing issued by the New Jersey Pinelands Commission, unless the proposed development meets the criteria of Subsection
35-162a7 of the Code of Berkeley Township.
7. Upon deeming an application complete pursuant to paragraph c6 above, the Zoning Officer shall issue a zoning permit in accordance with Subsection
35-131.2 of the Code of Berkeley Township, and the following:
(a)
In the Pinelands Area, said zoning permit shall not take effect and no development shall be carried out until the provisions of Section
35-165 and Section
35-166 have been met, unless the proposed development meets the criteria of Subsection
35-162a7 of the Code of Berkeley Township.
8. EVSE and Make-Ready parking spaces installed at a gasoline service
station, an existing retail establishment, or any other existing building
shall be subject to applicable local and/or Department of Community
Affairs inspection requirements.
9. A permitting application solely for the installation of electric
vehicle supply equipment permitted as an accessory use shall not be
subject to review based on parking requirements.
d. Requirements for New Installation of EVSE and Make-Ready Parking
Spaces.
1. As a condition of preliminary site plan approval, for each application
involving a multiple dwelling with five or more units of dwelling
space, which shall include a multiple dwelling that is held under
a condominium or cooperative form of ownership, a mutual housing corporation,
or a mixed-use development, the developer or owner, as applicable,
shall:
(a)
Prepare as Make-Ready parking spaces at least 15% of the required
off-street parking spaces, and install EVSE in at least 1/3 of the
15% of Make-Ready parking spaces;
(b)
Within three years following the date of the issuance of the
certificate of occupancy, install EVSE in an additional 1/3 of the
original 15% of Make-Ready parking spaces; and
(c)
Within six years following the date of the issuance of the certificate
of occupancy, install EVSE in the final 1/3 of the original 15% of
Make-Ready parking spaces.
(d)
Throughout the installation of EVSE in the Make-Ready parking
spaces, at least 5% of the electric vehicle supply equipment shall
be accessible for people with disabilities.
(e)
Nothing in this subsection shall be construed to restrict the
ability to install electric vehicle supply equipment or Make-Ready
parking spaces at a faster or more expansive rate than as required
above.
2. As a condition of preliminary site plan approval, each application
involving a parking lot or garage not covered in paragraph d1 above
shall:
(a)
Install at least one Make-Ready parking space if there will
be 50 or fewer off-street parking spaces.
(b)
Install at least two Make-Ready parking spaces if there will
be 51 to 75 off-street parking spaces.
(c)
Install at least three Make-Ready parking spaces if there will
be 76 to 100 off-street parking spaces.
(d)
Install at least four Make-Ready parking spaces, at least one
of which shall be accessible for people with disabilities, if there
will be 101 to 150 off-street parking spaces.
(e)
Install at least 4% of the total parking spaces as Make-Ready
parking spaces, at least 5% of which shall be accessible for people
with disabilities, if there will be more than 150 off-street parking
spaces.
(f)
In lieu of installing Make-Ready parking spaces, a parking lot
or garage may install EVSE to satisfy the requirements of this subsection.
(g)
Nothing in this subsection shall be construed to restrict the
ability to install electric vehicle supply equipment or Make-Ready
parking spaces at a faster or more expansive rate than as required
above.
(h)
Notwithstanding the provisions of this section, a retailer that
provides 25 or fewer off-street parking spaces or the developer or
owner of a single-family home shall not be required to provide or
install any electric vehicle supply equipment or Make-Ready parking
spaces.
e. Minimum Parking Requirements.
1. All parking spaces with EVSE and Make-Ready equipment shall be included in the calculation of minimum required parking spaces, pursuant to Subsection
35-63.12.
2. A parking space prepared with EVSE or Make-Ready equipment shall
count as at least two parking spaces for the purpose of complying
with a minimum parking space requirement. This shall result in a reduction
of no more than 10% of the total required parking.
3. All parking space calculations for EVSE and Make-Ready equipment
shall be rounded up to the next full parking space.
4. Additional installation of EVSE and Make-Ready parking spaces above
what is required in paragraph d above may be encouraged, but shall
not be required in development projects.
f. Reasonable Standards for All New EVSE and Make-Ready Parking Spaces.
1. Location and layout of EVSE and Make-Ready parking spaces is expected
to vary based on the design and use of the primary parking area. It
is expected flexibility will be required to provide the most convenient
and functional service to users. Standards and criteria should be
considered guidelines and flexibility should be allowed when alternatives
can better achieve objectives for provision of this service.
2. Installation:
(a)
Installation of EVSE and Make-Ready parking spaces shall meet
the electrical subcode of the Uniform Construction Code, N.J.A.C.
5:23-3.16.
(b)
Each EVSE or Make-Ready parking space that is not accessible
for people with disabilities shall be not less than nine feet wide
or 18 feet in length. Exceptions may be made for existing parking
spaces or parking spaces that were part of an application that received
prior site plan approval.
(c)
To the extent practical, the location of accessible parking
spaces for people with disabilities with EVSE and Make-Ready equipment
shall comply with the general accessibility requirements of the Uniform
Construction Code, N.J.A.C. 5:23, and other applicable accessibility
standards.
(d)
Each EVSE or Make-Ready parking space that is accessible for
people with disabilities shall comply with the sizing of accessible
parking space requirements in the Uniform Construction Code, N.J.A.C.
5:23, and other applicable accessibility standards.
3. EVSE Parking:
(a)
Publicly accessible EVSE shall be reserved for parking and charging
electric vehicles only. Electric vehicles shall be connected to the
EVSE.
(b)
Electric vehicles may be parked in any parking space designated
for parking, subject to the restrictions that would apply to any other
vehicle that would park in that space.
(c)
Public Parking. Pursuant to N.J.S.A. 40:48-2, publicly accessible
EVSE parking spaces shall be monitored by the municipality's Police
Department and enforced in the same manner as any other parking. It
shall be a violation of this section to park or stand a non-electric
vehicle in such a space, or to park an electric vehicle in such a
space when it is not connected to the EVSE. Any non-electric vehicle
parked or standing in a EVSE parking space or any electric vehicle
parked and not connected to the EVSE shall be is subject to fine and/or
impoundment of the offending vehicle as described in the general penalty
provisions of this Municipal Code. Signage indicating the penalties
for violations shall comply with paragraph f5 below. Any vehicle parked
in such a space shall make the appropriate payment for the space and
observe the time limit for the underlying parking area, if applicable.
(d)
Private Parking. The use of EVSE shall be monitored by the property
owner or designee.
4. Safety.
(a)
Each publicly accessible EVSE shall be located at a parking
space that is designated for electric vehicles only and identified
by green painted pavement and/or curb markings, a green painted charging
pictograph symbol, and appropriate signage pursuant to paragraph f5
below.
(b)
Where EVSE is installed, adequate site lighting and landscaping
shall be provided in accordance with the Township of Berkeley's ordinances
and regulations.
(c)
Adequate EVSE protection such as concrete-filled steel bollards
shall be used for publicly accessible EVSE. Non-mountable curbing
may be used in lieu of bollards if the EVSE is setback a minimum of
24 inches from the face of the curb. Any stand-alone EVSE bollards
should be three feet to four feet high with concrete footings placed
to protect the EVSE from accidental impact and to prevent damage from
equipment used for snow removal.
(d)
EVSE outlets and connector devices shall be no less than 36
inches and no higher than 48 inches from the ground or pavement surface
where mounted, and shall contain a cord management system as described
in paragraph f4(e) below. Equipment mounted on pedestals, lighting
posts, bollards, or other devices shall be designated and located
as to not impede pedestrian travel, create trip hazards on sidewalks,
or impede snow removal.
(e)
Each EVSE shall incorporate a cord management system or method
to minimize the potential for cable entanglement, user injury, or
connector damage. Cords shall be retractable or have a place to hang
the connector and cord a safe and sufficient distance above the ground
or pavement surface. Any cords connecting the charger to a vehicle
shall be configured so that they do not cross a driveway, sidewalk,
or passenger unloading area.
(f)
Where EVSE is provided within a pedestrian circulation area,
such as a sidewalk or other accessible route to a building entrance,
the EVSE shall be located so as not to interfere with accessibility
requirements of the Uniform Construction Code, N.J.A.C. 5:23, and
other applicable accessibility standards.
(g)
Publicly accessible EVSEs shall be maintained in all respects,
including the functioning of the equipment. A twenty-four-hour on-call
contact shall be provided on the equipment for reporting problems
with the equipment or access to it. To allow for maintenance and notification,
the Township of Berkeley shall require the owners/designee of publicly
accessible EVSE to provide information on the EVSE's geographic location,
date of installation, equipment type and model, and owner contact
information.
5. Signs.
(a)
Publicly accessible EVSE shall have posted regulatory signs,
as identified in this subsection, allowing only charging electric
vehicles to park in such spaces. For purposes of this subsection,
"charging" means that an electric vehicle is parked at an EVSE and
is connected to the EVSE. If time limits or vehicle removal provisions
are to be enforced, regulatory signs, including parking restrictions,
shall be installed immediately adjacent to, and visible from the EVSE.
For private EVSE, installation of signs and sign text is at the discretion
of the owner.
(b)
All regulatory signs shall comply with visibility, legibility,
size, shape, color, and reflectivity requirements contained within
the Federal Manual on Uniform Traffic Control Devices as published
by the Federal Highway Administration.
(c)
Wayfinding or directional signs, if necessary, shall be permitted
at appropriate decision points to effectively guide motorists to the
EVSE parking space(s). Wayfinding or directional signage shall be
placed in a manner that shall not interfere with any parking space,
drive lane, or exit and shall comply with paragraph f5(b) above.
(d)
In addition to the signage described above, the following information
shall be available on the EVSE or posted at or adjacent to all publicly
accessible EVSE parking spaces:
(1)
Hour of operations and/or time limits if time limits or tow-away
provisions are to be enforced by the municipality or owner/designee;
(2)
Usage fees and parking fees, if applicable; and
(3)
Contact information (telephone number) for reporting when the
equipment is not operating or other problems.
6. Usage Fees.
(a)
For publicly accessible municipal EVSE. In addition to any parking
fees, the fee to use parking spaces within the municipality identified
as EVSE spaces shall be $0 to $5 for each hour that the electric vehicle
is connected to the EVSE, as determined by resolution adopted by the
governing body.
(b)
This fee may be amended by a resolution adopted by the governing
body.
(c)
Private EVSE. Nothing in this subsection shall be deemed to
preclude a private owner/designee of an EVSE from collecting a fee
for the use of the EVSE, in accordance with applicable State and Federal
regulations. Fees shall be available on the EVSE or posted at or adjacent
to the EVSE parking space.
[Ord. No. 94-29 § 118-14.19A]
In the calculation of area for off-street parking and loading,
there shall be excluded that area, having a minimum width of 15 feet,
which is to be reserved for access from the road to the loading area,
thereby serving as a service access for the premises on which the
building is to be erected. Service access may be located in all or
any part of any required yard.
[Ord. No. 94-29 § 118-14.19B]
Every parcel of land hereafter used as a public or private parking
area for five or more cars or as a loading area, including a commercial
parking lot, shall be developed and maintained in accordance with
the following requirements:
a. Screening and Landscaping. Off-street parking areas for five or more
vehicles and off-street loading areas shall be screened on the side
or sides which adjoin residential zones.
b. Minimum Distances and Setbacks. No off-street loading area or parking
area for five or more vehicles, or part thereof, shall be closer than
10 feet to any dwelling, school, hospital or other institution for
human care located on an adjoining lot nor two feet from any lot line.
c. Surfacing. Any off-street parking area for five or more vehicles
or off-street loading areas shall be bituminous-surfaced, concrete-paving
or equivalent. All areas shall be marked so as to provide for the
orderly and safe loading, parking and storage of self-propelled vehicles.
d. Lighting.
1. Lighting used to illuminate any off-street parking or loading area
shall be arranged so as to reflect the light away from adjoining premises
or the adjoining street.
2. Off-street parking facilities for multi-family structures containing
four or more families shall be adequately lighted.
e. Any off-street parking area and off-street loading area shall be
graded and drained so as to dispose of all surface water without detriment
to surrounding uses. Natural vegetated swales, where applicable, shall
be utilized for drainage of the water quality design storm with overflow
for larger storm events directed into storm sewers as deemed appropriate
by the Municipal Engineer.
[Amended 12-21-2020 by Ord. No. 20-46-OAB]
f. Paving and Curbing.
1. Paving. All paving or other surfaces in off-street parking or loading
areas shall have a compacted depth of six inches of NJDOT Soil Aggregate
Mix I-5 base course in accordance with the specifications of the New
Jersey Department of Transportation and have a 2 1/2 inch bituminous
stabilized base course and a 1 1/2 inch FABC surface course.
2. Curbing. The perimeter of all parking areas and internal islands
within all parking areas open to the general public shall have continuous
cast-in-place concrete curbing. All curbing shall be constructed of
concrete or other approved material and have a minimum top with of
six inches and a minimum depth of 18 inches and shall extend six inches
above the paved gutter and shall be constructed in the manner established
by such ordinances of the Township of Berkeley as may establish standards
for such construction.
3. Curb cuts or flush curbs with curb stops shall be provided to allow
for the discharge of impervious areas to landscaped areas for stormwater
management as deemed appropriate by the Municipal Engineer.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
g. Fire zones shall be provided in parking and loading areas as required
by the Township Fire Official.
[Ord. No. 94-29 § 118-14.20]
a. General Improvements. Roadways and all appurtenances, including subgrade,
subbase, base courses and pavements, shall be constructed in accordance
with the applicable requirements of the New Jersey Department of Transportation's
Standard Specifications for Road and Bridge Construction 1989, as
amended and supplemented from time to time, herein referred to as
"Standard Specifications."
b. All streets or roads which are designed to become part of the street
or road system of the Township of Berkeley shall be coterminous with
adjoining links in the system and at the same or greater widths. Dead-end
street shall be avoided wherever possible. If their use is unavoidable,
turnarounds having a minimum right-of-way radius of 50 feet shall
be provided at the street ends. The Board may modify the turnaround
requirements in cases where undue hardship would be imposed.
c. Street Widths; Paving Width.
1. Street widths. The distance from property line to property line shall
be no less than:
(a)
Fifty feet in subdivision streets and avenues of secondary importance.
(b)
Sixty feet in subdivision streets and avenues of primary importance.
2. Paved surfaces shall be no less than 30 feet in width.
d. Road, street and avenue grades shall be no less than 0.5%.
e. In all rectangular lots and so far as possible in all lots, the lot
side lines shall be at right angles to the street on which the lot
faces or radiates to curved streets.
f. No street or road shall be submitted to the Township Council for
acceptance into the Township system until:
1. The street or road is indicated as public right-of-way on an approved
and filed plan.
2. The roadway has been improved by the construction of a paved surface
conforming to the following specifications:
(a)
Have a paved minimum width of 30 feet; or
(b)
Have a paved minimum width of less than 30 feet as shown on
the approved and signed final plan.
g. Type of Pavement. All roadways shall be constructed with either a
bituminous concrete flexible-pavement structure or a portland cement
concrete rigid-pavement structure. Only one type of pavement shall
be utilized throughout any development.
h. Pavement Structure Design.
1. The pavement structure design for each particular development utilizing
either a flexible- or rigid-pavement type shall be the responsibility
of the developer or his engineer. The pavement design shall be based
upon traffic loading projections and field sampling and laboratory
analysis of the subgrade soils to be encountered in roadway areas
in the development and shall follow current design recommendations
of the Asphalt Institute, the Portland Cement Concrete Association
or such other generally recognized standards as may be acceptable
to the Township Engineer.
2. As minimum requirements, rigid portland cement paving shall be expansion-joint-type
paving utilizing joints similar to Type A expansion joints, according
to the Standard Construction Details of the New Jersey Department
of Transportation, shall be reinforced, constructed with Class B air-entrained
concrete and shall have a minimum thickness of six inches for local,
local collector, minor collector streets, and parking areas and eight
inches for other classifications. Flexible bituminous concrete pavements
shall have an equivalent structural depth of at least 10 inches for
local, local collector and minor collector streets, or roads with
a functional equivalent ADT having a minimum wearing surface of not
less than 1 1/2 inches of pavement, Type FABC-1, a minimum bituminous
stabilized base course of not less than 2 1/2 inches and a dense
graded aggregate base course to provide the remaining depth; and an
equivalent structural depth of at least 13 inches for other street
classifications, having a minimum wearing surface of not less than
two inches of pavement, Type FABC-1, a minimum bituminous stabilized
base course of not less than three inches and a dense graded aggregate
base to provide the remaining depth. Bituminous stabilized base may
be substituted for aggregate base on a one to three ratio (stabilized
base to aggregate base), all in accordance with the applicable requirements
of the Standard Specifications. Parking areas shall have a minimum
stabilized base course of 2 1/2 inches and a minimum wearing
surface of not less than 1 1/2 inches of Type FABC-1 pavement.
i. Subgrades. All subgrade shall be prepared in accordance with the
applicable requirements of the Standard Specifications for bituminous
concrete and reinforced concrete pavements. Prior to the construction
of any subbase, base or pavement course, all soft or unyielding portions
of the subgrade which do not attain the required stability will be
removed and replaced with the suitable material, and the whole surface
of the subgrade shall be compacted. The provision of a uniform roadway
subgrade meeting the requirements of the Standard Specifications shall
be the full responsibility of the developer. In certain cases, special
treatment may be required because of the character or nature of the
subsoil. Such special treatment may include lime or cement stabilization,
wet excavation or construction of underdrainage fields. Any proposal
by the developer to stabilize subgrade shall be subject to the approval
of the Township Engineer.
j. Subbase and/or Aggregate Base Courses. Where granular subbase courses
are included in the pavement design section proposed by the developer,
they shall be constructed in accordance with the applicable requirements
of the Standard Specifications. Bituminous concrete pavements (and
stabilized bases) may be constructed on subgrade without subbase or
aggregate base courses, provided that the subgrade can be satisfactorily
prepared as hereinbefore described. Dense graded aggregate base courses
shall comply with the requirements of the Standard Specifications
for Soil Aggregate, Mix I-5. Portland cement concrete pavements must
be constructed with a minimum of six inches of a granular-type subbase
meeting the requirements of the Standard Specifications for Soil Aggregate,
Type 4, Class E. Any subbase course or aggregate base course to be
utilized with any type of pavement shall have a minimum thickness
of four inches.
k. Bituminous Base Courses.
1. Bituminous base courses for use with bituminous concrete pavements
shall consist of plant-mixed bituminous stabilized base course (stone
mix or gravel mix) in accordance with the requirements of the Standard
Specifications.
2. Prior to placement of any bituminous stabilized base course, the
finished surface of any underlying subbase or aggregate base shall
receive a prime coat in accordance with the requirements of the Standard
Specifications.
l. Bituminous Pavements. Bituminous pavements shall consist of a bituminous
concrete surface course, Type FABC-1, Mix I-5, in accordance with
the requirements of the Standard Specifications. The bituminous pavement
wearing surface should generally not be installed until just prior
to the time the streets are prepared for final acceptance. Prior to
the installation of a bituminous concrete surface, the bituminous
base course shall be inspected by the Township Engineer. Any areas
of the base course in need of repair shall be removed and replaced
at the direction of the Township Engineer. If the Township Engineer
directs, a leveling course of FABC material shall be placed on any
uneven or below-grade base courses prior to the placement of finished
pavement. No pavement surfaces shall be placed unless permission to
do so has been granted by the Township Engineer.
m. Concrete Pavements. Concrete pavements shall be constructed in accordance
with the requirements of the Standard Specifications. Expansion joints
shall be New Jersey State Department of Transportation Type A expansion
joints. The developer may submit, at the time of the submission of
the preliminary plat, an alternate expansion joint detail. The use
of such an alternate detail must be recommended by the Township Engineer
and approved by the Board. Where existing concrete roadways are being
widened as the result of the development of abutting properties, the
widened pavement shall be required to be of portland cement concrete.
The remaining pavement in the development may, if the subdivider elects,
be bituminous concrete. This will be an exception to the requirements
that all pavement constructed within a development be of one type.
n. Alternate Pavement Types. In areas where alternate pavement types
are proposed or desired either for decorative purposes, because of
physical restrictions or existing conditions, or because of limitations
or shortages in certain types of construction materials, a detail
of the type and/or location of alternate pavement types proposed shall
be submitted for approval with the preliminary and/or final plat.
The use of alternate pavement types may only be permitted if the applicant
submits for review and approval details and specifications concerning
the equipment, materials and methods proposed for use, and if the
Township Engineer has inspected the installation of and tested and
approved a suitable sample section of such pavement. In the event
that the Township Engineer does not approve the sample section of
pavement, the developer shall remove the same section and replace
it with a type of pavement permitted by this chapter or such other
alternate as may be approved by the Board.
o. All subsurface utilities, including service connections (terminating
at least two feet behind sidewalk) to each lot, and all storm drains
shall be installed in all roadway areas prior to the construction
of final pavement surfaces.
[Ord. No. 94-29 § 118-14.21]
a. The design, construction or approval of all public systems for extensions
of existing system, either publicly or privately owned, shall be under
the jurisdiction of the Berkeley Sewerage Authority.
b. Prior to the approval of any final plat, the full approval of any
sewage disposal system must have been obtained from the Berkeley Sewerage
Authority and filed with the Board, or the final approval will be
conditioned upon full approval of the Berkeley Sewerage Authority.
c. All development not required to connect to the Berkeley Sewerage
Authority sewer system shall be required to furnish proof of acceptance
and approval from the Berkeley Township Board of Health of an adequate
sanitary sewer system or individual sewage disposal system.
d. No sanitary sewer plant or collection system shall be installed without
first obtaining approval of the New Jersey Department of Environmental
Protection and Energy.
e. In the event that the Berkeley Sewerage Authority determines that
the lots in any development cannot be served as the time of application
by a public sewage disposal system, septic systems may be installed,
provided that:
1. The requirements of State Statute, including the New Jersey Realty
Improvements Act, are met.
2. They are installed in accordance with the regulations of the Berkeley
Township Board of Health.
3. The minimum lot size shall not be less than that permitted in the
respective zoning district. However, the Board of Health may require
a larger lot size if it deems such increased lot size is necessary
for such purposes. The Board shall abide by the decisions of the Board
of Health in this matter.
4. If any existing land drainage structures, such as french drains,
are encountered during the course of construction of any development,
no septic system or any part thereof shall be installed on any lot
within 400 feet thereof without the prior approval of the Township
Board of Health. Such approval shall only be granted if new percolation
tests, taken at least two months after such drainage structures are
removed, show that satisfactory soil conditions exist and that installation
of such septic system in the area affected by the removal of the drainage
structures will not be detrimental to the health of the Township residents
or cause pollution of any of its waters.
5. The developer conforms to all conditions set forth in any report
of the Sewerage Authority which originally provided that public sewage
was not available.
[Ord. No. 94-29 § 118-14.22A]
a. Sidewalks shall be constructed on both sides of all streets within
a development and entirely around the perimeter of all cul-de-sacs.
Where the development abuts an existing street, the sidewalk shall
be constructed only on that side. Sidewalks shall also be constructed
at any other places, such as pedestrian walkways or access points
to open space, as shown on or required at the approval of the final
plat.
b. The requirements of the Standard Specifications regarding curing
precautions must be strictly observed.
c. Sidewalks, where feasible, shall be designed and constructed to discharge
stormwater to neighboring lawns to disconnect these impervious surfaces
as deemed appropriate by the Municipal Engineer.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
[Ord. No. 94-29 § 118-14.22B]
Sidewalks within street rights-of-way shall generally be located
three feet from the street, road or highway right-of-way line thereby
creating a three-foot wide strip of land between the sidewalk and
the property line. Sidewalks shall be constructed a minimum distance
of three feet from the face of the curb. Sidewalks not within street
rights-of-way shall be located to provide for the most likely routes
of pedestrian travel. In cases where the topography dictates or a
proposed development provides for the extension of an existing street
or abuts an existing street, where sidewalks have already been installed
in a location other than as specified above or where such variations
in sidewalk locations are needed to preserve trees or natural features,
the Board may approve alternate sidewalk locations in order to provide
for the preservation of physical features or the continuation of the
existing sidewalks.
[Ord. No. 94-29 § 118-14.22C]
a. Sidewalks shall be four feet wide and four inches thick, except crossing
driveways, where the thickness shall be increased to six inches for
residential uses and all drives to parking areas of less than 50 spaces
and to eight inches for all other uses. Where the Board determines
that a sidewalk may be subject to unusually heavy pedestrian traffic
it may require that its width be increased to a maximum of eight feet.
All sidewalk construction shall be in accordance with the applicable
requirements of the Standard Specifications. Concrete shall be Class
B, air-entrained. Preformed bituminous cellular joint fillers 1/2
inch thick shall be placed at intervals not exceeding 20 feet. Dummy
(formed) joints shall be cut into the concrete sidewalk between the
expansion joints at equal intervals not exceeding the width of the
sidewalk.
b. The sidewalk subgrade shall be compacted prior to the placement of
any sidewalk. Any unsuitable material encountered in the subgrade
shall be removed and replaced with suitable material acceptable to
the Engineer. All six inch or eight-inch sidewalk areas crossing driveways
shall be reinforced at a point 1/3 from the bottom of the sidewalk
section. Reinforcing shall be welded wire fabric (66-1010) or an equivalent
approved by the Township Engineer.
c. Sidewalks shall be constructed of permeable materials in accordance
with Section 9.7, Pervious Paving Systems, of the New Jersey Stormwater
Best Management Practices Manual, as amended and supplemented, as
deemed appropriate by the Municipal Engineer.
[Added 12-21-2020 by Ord. No. 20-46-OAB]
[Ord. No. 94-29 § 118-14.22D]
Reinforced concrete aprons shall be constructed at all driveways
between the concrete curb (or combination curb and gutter) and the
concrete sidewalk. Such aprons shall be six inches thick for residential
uses and all drives to parking areas of less than 50 spaces and eight
inches for all other uses and shall be reinforced with welded wire
fabric (66-1010) or an equivalent approved by the Township Engineer,
located at the midpoint or 1/3 points, respectively, of the apron
section. Concrete shall be Class B, air-entrained.
[Ord. No. 94-29 § 118-14.22E]
At each driveway without curb return radii, the concrete curb
or combination curb and gutter shall be depressed to form a driveway
opening. The depression shall be equal in length to the width of the
driveway plus 10 feet, but not less than 20 feet. At driveways with
curb return radii, the curb depression shall accommodate the exterior
limits of the radii. The depression shall be smoothly formed to maintain
a lowered curb face across the depression of at least one inch, but
not more than two inches. The bottom of the curb shall be lowered
to maintain full curb depth across the depression.
[Ord. No. 94-29 § 118-14.22F]
In areas where alternate sidewalk or apron types and/or locations
are proposed or desired, either for decorative purposes or because
of physical restrictions or existing conditions, a detail of the type
and/or location of sidewalk and apron proposed shall be submitted
for approval with the preliminary and/or final plat.
[Ord. No. 94-29 § 118-14.22G]
a. Curb ramps for the physically handicapped shall be constructed on
all street curb returns and, where appropriate, in parking areas.
In general, two curb ramps shall be constructed at each corner. A
single ramp at the center of the corner is acceptable when site conditions
preclude the use of the two ramp system.
b. Curb ramps for the physically handicapped shall be constructed in
accordance with the Standard Specifications and the ADA Accessibility
Guidelines (A.D.A.A.G.). If there is a grass or landscaped area between
the curb and the sidewalk, side ramps need not be provided. Curb ramps
shall be provided at all four corners of full intersections and at
the two corners plus a location across the street from both of the
ramps at T-intersections.
c. The developer shall submit a detailed intersection grading plan for
approval of the Township Engineer prior to installation of the curbs,
sidewalks and curb ramps at the intersection.
d. Curb ramps shall be constructed with a rough broom finish in accordance
with the Standard Specifications and shall be flush with the street
pavement at the gutter line.
[Ord. No. 05-06-OAB § 1]
All applicants seeking preliminary major subdivision or site
plan approval to create residential lots or units shall be required
to provide for active and passive recreational areas and facilities
within the subject property of the proposed development in accordance
with the following standards:
a. Reservation of Recreational Lands.
1. All applicants shall reserve an area equal to 5% of the overall tract
area for active and passive recreational needs of the future residents.
2. The area so reserved shall consist of contiguous lands; the exact
location and configuration thereof to be approved by the Board.
3. At least 50% of the reserved tract area shall be devoted to active
recreational uses including but not limited to children's playgrounds,
athletic fields, bocce courts, tennis courts, and other similar facilities.
4. The remaining portion of the reserved recreational area may be devoted
to passive recreational uses including, but not limited to nature
trails, dedicated open space, and animal/bird sanctuaries.
5. All reserved recreation areas shall be outside any established wetland
or wetland buffer areas and/or areas of steep slopes, except that
50% of the area to be reserved for passive recreation may consist
of such lands.
b. Construction I Provision of Active Recreation Facilities.
1. As a condition of any approval, the applicant shall construct and/or
provide all proposed recreational facilities within the areas reserved
for active recreation. These facilities shall be a bondable item and
shall be included within applicant's performance guarantees following
approval.
c. Recreation Plan.
1. At the time of submission of the application for preliminary major subdivision or site plan approval, the applicant shall be required to submit a recreation plan to show the location and configuration of the reserved recreation area together with the location and specifications of the proposed facilities to be constructed therein. Said plan is to be prepared by a New Jersey licensed engineer, land surveyor, or landscape architect. The submission of said plan shall be required prior to the application being deemed complete in accordance with N.J.S.A. 50:55D-10.3, unless a waiver is sought by the applicant and approved by the Board in accordance with Subsection
e1 below.
d. Ownership/Maintenance of Reserved Recreation Area.
1. As a condition of approval, the applicant shall establish a Homeowner's
Association, which shall consist of the record owners of all residential
lots or units in the proposed development. Said Homeowner's Association
will be responsible for the future maintenance and repair of the reserved
recreational areas and facilities located therein. Prior to the signing
of the plat, the applicant shall deliver copies of the proposed Articles
of Incorporation and bylaws of said Association for review and approval
by the Board Attorney. Said documents shall establish the right of
the municipality to enforce the obligation of the future homeowners
to maintain and repair the reserved recreation area and facilities
by instituting the appropriate legal proceeding and shall also provide
assessment powers to the municipality. The applicant shall also prepare
and record a deed restriction outlining the obligations of the Homeowner's
Association prior to conveyance of any lot or unit within the development
and further shall provide a point of sale disclosure of the same to
all prospective purchasers within the subdivision.
2. As an alternative to the establishment of a Homeowner's Association,
the applicant may dedicate the reserved recreation area to the Township
of Berkeley upon payment of a fee equal to $750 per residential unit
approved. This dedication shall occur following the filing of the
final subdivision plat with the Ocean County Clerk, or upon the construction,
inspection and approval of the required recreational facilities within
the reserved recreation area, whichever shall occur last.
e. Contribution in Lieu of Reservation.
1. The Board may grant a waiver of the required reservation of recreational
lands pursuant to this section only upon the applicant's agreement
to pay a contribution in lieu thereof equal to $1,500 per residential
unit approved within the subdivision.
2. All payments made by applicants pursuant to Subsections
d2 or
e1 of this section shall be deposited into the Township's Special Recreation Trust Account, which funds shall be used to further the active and/or passive recreational needs of Berkeley Township and its residents.
[Ord. No. 94-29 § 118-14.25]
Solid wastes from all uses other than single- or two-family
homes and townhouse development, if stored outdoors, shall be placed
in metal receptacles within a screened refuse area subject to the
following minimum standards:
a. The screened refuse area shall not be located within any front yard
area.
b. The refuse storage area shall be surrounded on three sides by a solid
uniform fence or wall not less than five feet nor more than eight
feet in height. Such fence shall be exempt from the provisions of
any ordinance of the Township regulating the height of fences and
requiring permits therefor.
c. A five-foot minimum width landscaping area shall be provided along
the fence or wall enclosing the refuse storage area. The landscaping
to be provided shall be shown on the site plan submitted for Board
approval.
d. The opening in the enclosed refuse area should be located to minimize
the view of refuse from adjoining properties or public streets.
e. If located within or adjacent to a parking area or access drive,
the enclosed refuse areas shall be separated from such parking area
or access drive.
f. The enclosed refuse area shall not be located so as to interfere
with traffic circulation or the parking of vehicles.
g. All refuse shall be deposited in containers maintained within the
refuse area. No containers shall be maintained anywhere on a site
except in a refuse area meeting these requirements.
h. No refuse storage area shall be placed within 10 feet of any public
right-of-way or any property line.
i. All uses, other than single- or two-family dwellings, shall provide
adequate areas for the storage of mandatory recyclable materials.
[Ord. No. 94-29 § 118-14.26; Ord. No. 02-49-OAB § 7; Ord. No. 04-06-OAB § 6; 12-21-2020 by Ord. No.
20-44-OAB]
a. Storm drains shall include the excavation for and construction of
pipe drains for surface drainage in accordance with plans approved
by the Township Engineer and the provisions of the Standard Specifications.
b. The drains shall be the type and size specified and shall be constructed
to the prescribed lines and grades at the locations shown on the plans.
c. Inlets, manholes and other drainage structures shall be constructed
at the locations specified, and shall be the type specified on the
approved plans.
d. Within Township rights-of-way, storm drain pipes shall be reinforced
concrete pipe in all cases and shall be of the size specified and
laid to the exact lines and grades approved by the Township Engineer.
Reinforced concrete pipe shall conform to the most current ASTM Specifications
C76. All pipe shall be Class III, Wall B strength except where stronger
pipe is required as determined by the Board Engineer. All pipe shall
be designed for AASHO H20-44 loading, and shall meet the manufacturer's
minimum cover requirements.
1. In locations other than within the right-of-way of public roads,
corrugated aluminum pipe, pipe arch, polyethylene pipe, helical corrugated
pipe, or fully coated corrugated metal pipe may be used. The material
used shall comply with the Standard Specifications for Corrugated
Aluminum Alloy Culvert Pipe and Pipe Arch AASHO designation M-196-62
or the Standard Specifications for Aluminum Alloy Helical Pipe AASHO
designation M-211-65. The minimum thickness of the aluminum pipe to
be used shall be less than twenty-four-inch diameter or equivalent,
0.075 inches (14 gauge); twenty-four-inch diameter and less than forty-eight-inch
diameter or equivalent, 0.15 inches (12 gauge); forty-nine-inch diameter
but less than seventy-two-inch diameter or equivalent, 0.135 inches;
and seventy-two-inch diameter or equivalent, and larger, 0.165 inches
except where stronger pipe may be required as determined by the Board
Engineer.
e. The adequate drainage systems shall be and include not only the proper
drainage of the area of the specific development, but shall also include
the disposal of the stormwater runoff from the specific subdivision
to an adequate outlet or other means of final disposal of the stormwater,
such as ocean, river, running stream, lagoon or existing adequate
storm sewer.
f. The Township Department of Engineering shall ascertain, in each drainage
instance, the drainage area of which this specific subdivision or
site is a part and apportion the fair cost of adequate drainage for
the whole drainage area among the landowners who contribute to or
will contribute to the stormwater runoff if the development is improved.
g. Each applicant for a development requiring provisions for drainage
of stormwater runoff shall install an adequate drainage system for
the specific development and shall also pay in cash or certified funds
to the Township drainage trust fund for the ultimate disposal of the
stormwater runoff to an adequate outlet. Each payment made to the
Township shall be held in trust until the overall disposal system
is constructed for the drainage area in question, at which time the
drainage trust funds raised for that drainage area may be used for
construction in that area. If the improvements are not initiated within
a period of 10 years from the date of payment or any other mutually
agreeable period of time, all deposits shall be returned to the developer
together with the accumulated interest.
h. Layout of Storm Sewer System.
1. Inlet spacing shall not exceed 600 feet or a design inlet flow of
five cubic feet per second for Type B inlets and two cubic feet per
second for Type E inlets and, in addition, gutter flow shall also
be limited to provide a maximum gutter flow surface width of eight
feet.
2. Gutter flow across intersections will not be allowed, and sufficient
inlets will be placed to prevent flow across intersections. No swales
or dish gutters will be permitted. Manholes shall be placed at all
sewer junctions where inlets are not required and at maximum intervals
of 600 feet in continuous drainage runs.
3. Where feasible, natural swales shall be used in lieu of piping and
inlets, as deemed appropriate by the Municipal Engineer.
i. Types of Inlets. All street inlets shall be New Jersey Department
of Transportation standard Type B or equal, and all yard inlets shall
be standard Type E or equal. Casting heights on street inlets shall
be two inches greater than the specified curb face, and the gutter
shall be properly transitioned approximately 10 feet on either side
of the inlet. All inlets located within roadways, parking lots, and
pedestrian areas shall be bicycle-safe grates with N-ECO-type curb
inlets with a curb opening no bigger than two inches high.
j. Conduit Sizing. The sizing of conduit for the transmission of storm
flow shall be determined by the use of the Manning Formula. No pipe
size in any storm drainage system shall be less than fifteen-inch-diameter
reinforced concrete pipe or its equivalent.
k. Open Channels.
1. Generally, unlined open channel cross sections shall have side slopes
not steeper than four to one. Lined open channel side slopes shall
not be steeper than two to one.
2. The bottom of all unlined open channels and the channel side slopes
to at least the design flow level will be sodded with suitably coarse
grass sod.
3. All unlined open channel side slopes above the design minimum flow
level will be topsoiled and seeded or otherwise suitably stabilized
in accordance with an approved soil disturbance permit.
4. All unlined open channels which can be expected to have base flow
of five cubic feet per second or more for at least two out of every
12 months will be provided with a low-flow channel using gabions,
rip-rap, lining, 1/3 pipe sections or other arrangements approved
as part of the final plat submission.
l. Basis of Calculations for Storm Drains.
1. Intensity of rainfall.
(a)
For closed conduits.
(1)
All subdivision and site plan drainage collection systems shall
be designed for a ten-year frequency rainfall; or if the above results
in a conduit size at least equivalent to a twenty-seven-inch reinforced
concrete pipe, then a twenty-five-year frequency rainfall shall be
used; or if the above results in a conduit size at least equivalent
to a fifty-four-inch reinforced concrete pipe, then a fifty-year frequency
rainfall shall be used for the corresponding time of concentration.
(2)
In lieu of the above, all subdivision and site plan drainage
collection systems shall be designed for a ten-year frequency rainfall
intensity for the corresponding time of concentration. In conjunction
with this collection system, an overland relief system shall be provided
for the fifty-year frequency rainfall.
(3)
Rainfall data shall be taken from the U.S. Department of Commerce
Technical Paper No. 25 "Rainfall-Intensity-Duration-Frequency-Curves"
using the Atlantic City weather station data. Stream relocations,
bridges, box culverts, pipe over 72 inches in diameter. Culverts conveying
runoff from drainage areas of 50 acres or greater, and other critical
waterways, as determined by the Board Engineer, shall be designed
for a 100-year frequency rainfall. In all cases, proposed grading
shall be designed to eliminate flood damage to buildings and parked
motor vehicles.
(b)
For open channels.
(1)
For a contributory drainage area of up to 50 acres use a twenty-five-year
frequency rainfall.
(2)
For a contributory drainage area of between 51 acres and 250
acres use a fifty-year frequency rainfall.
(3)
For a contributory drainage area of greater than 250 acres use
a 100-year frequency rainfall.
2. Runoff calculations. Runoff determinations should be made using the
rational formula or, in unusual cases, other method with the prior
approval of the Board. Upstream areas should be considered based on
their full development potential according to current zoning or the
current use, whichever produces the greatest runoff. Coefficients
used should generally fall in the following ranges:
Classification Fully Developed
|
Range of Coefficient (c)
|
---|
Public parks, open space and land conservation
|
0.15 to 0.30
|
Low-density residential
|
0.30 to 0.45
|
Medium-density residential
|
0.40 to 0.60
|
High-density residential
|
0.55 to 0.70
|
Commercial and industrial
|
0.60 to 0.90
|
Pavements, roadways and shoulders
|
0.95
|
3. Velocity restrictions.
(a)
In general, velocities in closed conduits at design flow should
be at least two feet per second but not more than that velocity which
will cause erosion damage to the conduit. In general, velocities in
open channels at design flow shall not be less than 0.5 foot per second
and not greater than that velocity which will begin to cause erosion
or scouring of the channel. For unlined earth channels, the maximum
velocity allowed will be two feet per second. For other channels sufficient
design data and soil tests to determine the character of the channel
shall be made by the subdivider and shall be made available to the
Board at the time of drainage review.
(b)
At the transition between closed conduits and open channels
or different types of open channels, suitable provisions must be made
to accommodate the velocity transitions. These provisions may include
rip-rapping, gabions, lining, aprons, chutes and checks or others,
all suitably detailed and approved.
(c)
For all flows of 50 cubic feet per second or more, tailwater
depths and velocity calculations shall be submitted.
4. Design formulas and friction factors. In general, Manning's Formula
will be used by the Board to review the adequacy of proposed drainage
facilities; other formulas may be used in particular cases with the
previous agreement of the Board. A friction factor ("n") of 0.013
will be used for reinforced concrete pipe, and a factor of 0.021 will
be used for fully coated corrugated metal pipe with paved inverts.
Commensurate factors will be used for other pipe types and shapes.
A friction factor ("n") of not less than 0.015 will be used for fully
lined concrete channels. A factor of not less than 0.025 will be used
for fair to poor natural streams and watercourses. Commensurate factors
will be used for other channel types.
5. All drainage facilities carrying runoff from tributary areas larger
than 1/2 square mile must have the approval of the New Jersey Division
of Water Policy and Supply. Such approval shall be granted prior to
approval of the final plat.
6. All encroachments of natural waterways must be referred to the New
Jersey Department of Environmental Protection and Energy for approval
in accordance with statute. The state may retain jurisdiction, in
which case a permit will be necessary as set forth, or may refer the
matter to the County Engineer for review.
7. All nonpipe culverts shall be designed for AASHTO H20-44 loading.
All culverts of any type shall be carried to the roadway right-of-way
and shall terminate with headwalls or other approved end treatment.
All conduits terminating or beginning in open channels shall be provided
with headwalls or other appropriate end treatment.
8. The use of siltation and oil-separation basins with controlled outflows
may be required to prevent pollution of waterways when discharge is
into a lagoon, bay or other standing body of water.
m. Special Drainage Provisions.
1. The existing system of natural drainage within each subdivision shall
be preserved to the maximum extent possible. To this end the Board
may require the preservation of natural drainage swales, recharge
areas, wet-weather ponds and similar features and may require suitable
drainage and conservation easements and possible increases in lot
size to allow usable lots with the preservation of such features.
2. Subject to review and approval by the Board, the design of a subdivision
may be modified to take advantage of the natural drainage features
of the land. In such review the Board will use the following criteria:
(a)
The utilization of the natural drainage system as much as possible
in its unimproved state.
(b)
When drainage channels are required, wide shallow swales with
natural vegetation will be preferred to other sections.
(c)
The construction of flow-retarding devices, detention areas
and recharge berms to minimize runoff value increases.
(d)
Maintenance of base flow in streams, reservoirs and ponds.
(e)
The reinforcement, improvement and/or extension of the natural
drainage system to such an extent as is necessary to eliminate flooding
and excess maintenance requirements.
3. All developments or portions of total schemes of development which, based upon the preliminary plat submission, total 15 or more acres, or add one or more acres of impervious surface, shall be designed and constructed in conformance with Subsection
35-72.1 of the Township Code.
4. All stormwater management facilities, including stormwater detention, retention and infiltration devices shall be designed and constructed in accordance with Subsection
35-72.1 of this chapter.
n. General Drainage Requirements.
1. All development applications must be accompanied by the drainage
area map and drainage calculations.
2. No drainage pipe shall be permitted within 50 feet and no easement
shall be permitted within 25 feet of any existing or proposed individual
sewage disposal system.
o. When a developer or his engineer determines that it will be necessary
to utilize design standards in addition to or other than those minimum
requirements established herein, he is advised to consult with the
Board Engineer prior to beginning his detailed design for review and
approval of his proposed design standards. Standards utilized should
be generally accepted engineering practice and in common use in this
area.
p. Minor modifications or changes to the approved plans and specifications
may be effected only upon written approval of the Board Engineer,
but some changes may require further review and approval of the Board
prior to making any change.
[Ord. No. 94-29 § 118-14.27A
through § 118-14.27G; Ord. No. 01-21-OAB § 18; Ord. No. 06-12-OAB § 1; amended 12-21-2020 by Ord. No. 20-44-OAB]
It is hereby determined that the lakes and waterways within
the Township of Berkeley are at times subjected to flooding; that
such flooding is a danger to the lives and property of the public;
that such flooding is also a danger to the natural resources of the
Township of Berkeley, Ocean County, New Jersey; that development tends
to accentuate such flooding by increasing stormwater runoff, due to
alteration of the hydrologic response of the watershed in changing
from the undeveloped to the developed condition; that such increased
flooding produced by the development of the real property contributes
increased quantities of water-borne pollutants, and tends to increase
channel erosion; that such increased flooding, increased erosion and
increased pollution constitutes deterioration of the water resources
of the Township of Berkeley, Ocean County, New Jersey; and that such
increased flooding, increased erosion and increased pollution can
be controlled to some extent by the regulation of stormwater runoff
from such development. It is therefore determined that it is in the
public interest to regulate the development of real property and to
establish standards to regulate the additional discharge of stormwater
runoff from such developments as provided in this chapter.
The provisions of this chapter shall be applicable to each of
the types of developments named below:
a. All residential subdivisions and site plans shall comply with the provisions of N.J.A.C. 5:21 (Residential Site Improvement Standards), Subchapter 7, Stormwater Management. Nonresidential site plans meeting the latest definition of "major development" per N.J.A.C. 7:8-1.2 shall comply with the provisions of N.J.A.C. 7:8-1.2, shall comply with the provisions of N.J.A.C. 7:8, Stormwater Management, as well as provisions of the Stormwater Control Ordinance for areas of Berkeley Township outside of the Pinelands Area, §
35-74, except as provided in Subsection
f below.
b. All developments or portions of total schemes of developments which,
based upon the preliminary plan/plat submission, total 15 or more
acres.
c. Any construction of one or more of the following uses:
1. Confined feeding and holding areas of animals as determined by the
Soil Conservation Service (SCS) procedure for measuring biochemical
oxygen demand (BOD) producing potential.
2. Pipelines, storage or distribution systems for petroleum products
or chemicals.
3. Storage, distribution or treatment facilities (excluding on-site
sewage disposal systems) for liquid waste.
4. Solid waste storage, disposition, incineration or landfill.
5. Quarries, mines or borrow pits.
6. Land application of sludge or effluence.
d. In the event that control of stormwater runoff is proposed or mandated
for construction covering less than one acre of ground, such lesser
developments shall come under provisions of this chapter.
e. In the case of the projects for which county as well as municipal
approval of proposed drainage facilities is required, the applicants
shall be required to comply with all provisions of this chapter. In
such a case, the only provisions of the Township which shall govern
are those requirements which are stricter than those of Ocean County.
f. The provisions and requirements of this section shall not apply to any development within the Pinelands Area of the Township of Berkeley. Stormwater management standards applicable to development in the Pinelands Area that do not meet the most current definition of "major development" per the Pinelands Comprehensive Management Plan (N.J.A.C. 7:50-1.1 et seq.) are set forth in §
35-159b6 of this chapter. Stormwater management standards applicable to development in the Pinelands Area that do meet the most current definition of "major development" per the Pinelands Comprehensive Management Plan (N.J.A.C. 7:50-1.1 et seq.) shall comply with the provisions of the Stormwater Control Ordinance for areas of Berkeley Township within the Pinelands Area §
35-155.
a. Burden of Proof. Whenever an applicant seeks a municipal approval
of a development to which this chapter is applicable from any board
of the Township, the applicant shall be required to demonstrate that
the project meets the standards set forth in this chapter.
b. Submission Materials Due. The applicant shall submit materials, as required by Subsections
35-72.4 and
35-72.5 hereof, to the municipal board from which he seeks municipal approval prior to or at the same time he submits his application for the municipal approval. Failure to submit the appropriate drainage plans, calculations, test results and reports at the time of submittal will constitute an incomplete application.
c. Review. The applicant's project shall be reviewed by the municipal
board from which he seeks his municipal approval. The municipal board
shall consult with the Township Engineer to determine if the project
meets the standards set forth in this chapter.
d. Time for Decision. The municipal board shall promptly determine if
the project meets the standards set forth in this chapter. The time
for that determination shall be the time permitted to review and act
on the applicant's application for a municipal approval as provided
in the Municipal Land Use Law, Chapter 291, Laws of New Jersey, 1975,
and all amendments thereto.
e. Failure to Comply. Failure of the applicant to demonstrate that the
project meets the standards set forth in this chapter is reason to
deny the applicant's underlying application for a municipal approval.
f. Variance. For good reason, the Board may grant a waiver of the standards given in Subsection
35-72.4 below if the nature of the development, the character of adjacent previously developed areas or other factors make the utilization of natural drainage features or runoff-controlling devices inadvisable or impractical.
Each proposed project not exempted from the operation of this chapter shall meet the following storm drainage standards as outlined in §
35-74:
a. General Standards. The project plans submitted shall demonstrate
careful consideration of the general and specific concerns, values
and standards of the Township Master Plan and applicable county, regional
and state storm drainage control programs, any County Mosquito Commission
Control standards and shall be based on environmentally sound site
planning, engineering and architectural techniques.
b. In all cases, multiple-level outlets or other fully automatic outlets
shall be designed so that discharge rates from the development for
the design storms will not be increased from what would occur if the
development were not constructed. Outlet waters shall be discharged
from the development at such locations and velocities as not to cause
additional erosion or cause additional channels downstream of the
development.
c. Where the project consists of two phases:
1. New construction which requires provisions of storm drainage under
the terms of this chapter.
2. Repair or rehabilitation of structures and surfaces which does not
result in increasing the extent of impervious areas or in rendering
existing surfaces less pervious, the detention requirements may be
computed on the basis of phase (1) exclusively.
d. If detention basins or other detention facilities are provided through
which water passes at times other than following rainfall, the Township
Engineer should be consulted concerning design criteria. It will be
necessary for detention requirements to be met, despite the necessity
of passing certain low flows. This applies to all on-stream or on-line
detention basins.
e. Outlets from detention facilities shall be designed to function without
manual, electric or mechanical controls.
f. The retention of site runoff as required by this chapter will result
in the accumulation of sediment in the detention basin, including
particulate polluting substances, silt and debris. Provision must
be made for periodic removal of accumulated solid materials.
g. Computations for storage capacity shall include estimates for one
year's accumulation of solid materials. In addition, a maintenance
schedule shall be submitted to the Township Engineer which includes
provisions for removal of accumulated materials, basin/system restoration
and identification of the individual or entity responsible for implementation.
h. Dams. Any stormwater basin that impounds water through the use of
an artificial dike, levee or other barrier and raises the water level
five feet or more above usual, mean low-water height when measured
from the downstream toe-of-dam to the emergency spillway crest is
classified as a dam and subject to N.J.A.C. 7:20, the New Jersey Dam
Safety Standards. All such dams must be designed, constructed, operated
and maintained in compliance with the rules of N.J.A.C. 7:20.
i. In many instances, the provisions of separate detention facilities
for a number of single sites may be more expensive and more difficult
to maintain than provisions of joint facilities for a number of sites.
In such cases, the Municipal Board should be willing to consider provisions
of joint detention facilities which will fulfill the requirements
of this regulation. In such cases, a properly planned stage program
of detention facilities may be approved by the Township in which compliance
with some requirements may be postponed at early stages while preliminary
phases are being undertaken and construction funds accumulated. The
necessary planning to facilitate such arrangements may be accomplished
by Phase II planning under provisions of N.J.A.C. 7:8.
j. Detention basins, and all other systems employing techniques delaying
runoff which incorporate principal outlets, shall be constructed a
minimum of two feet above the seasonal high groundwater table.
k. Stormwater basins shall not incorporate provisions for recreational
use.
l. Soil Borings and Hydraulic Conductivity Tests.
1. All development applications subject to the requirements of this
chapter shall be accompanied by a soils investigation report, prepared
by a licensed professional engineer in the State of New Jersey.
2. The report shall include the results of test borings/pits, soil borings
and percolation or permeability tests, which shall be performed at
each stormwater basin, trench, pit or other disposal area and at a
rate of one percolation or permeability test and one test pit per
7,500 square feet of basin or recharge area. A minimum of two soil
borings and permeability/percolation tests shall be required for each
basin or recharge system. The percolation/permeability test results
shall include a description of the test, the depth at which the test
was conducted and a description of the soils encountered. Depth to
the seasonal high-water table shall also be shown. The ground surface
elevation (MSL Datum) at all test locations shall be specified.
3. Percolation/permeability tests and reports.
(a)
At least one percolation or permeability test shall be performed
at the site of each basin or other disposal area. The percolation/permeability
tests shall be performed at a depth corresponding to the bottom of
the basin, trench or disposal area. All percolation/permeability tests
shall be performed under the supervision of a licensed professional
engineer in the State of New Jersey.
(b)
Percolation tests shall not be made in test holes which have
been allowed to remain open to the atmosphere for periods over three
days or in frozen ground. Tests shall not be made in filled ground
unless the soil has been compacted or allowed to settle to the satisfaction
of the Township Engineer.
(c)
Percolation tests shall be performed in accordance with the
following procedures:
(1)
Step 1: Prepare a test hole in the undisturbed soil at the depth
intended to be used for disposal purposes, having horizontal dimensions
of eight inches to 12 inches. Means shall be used to protect the soil
in the test hole from becoming clogged with silt and clay particles.
Establish a fixed point at the top of the hole from which all measurements
shall be taken. Fill the hole with water and allow all of the water
to drain into the soil.
(2)
Step 2: Fill the hole to a depth of approximately seven inches.
At a five- to thirty-minute time interval, depending on the rate of
fall, record the drop in water level in inches during the time interval
selected. Immediately refill the hole to the original depth of approximately
seven inches, and repeat the test using the same time interval and
method. Repeat this procedure until the distance that the water has
fallen in the time interval selected becomes approximately equal.
(3)
Step 3: Calculate the percolation rate of the soil. The time
interval determined in Step 2 divided by the infiltration rate (volumetric
change divided by the infiltration area) of the hole will be the percolation;
or
(4)
Soil percolation tests shall be performed in compliance with
the testing procedures and methodology as described in N.J.A.C. 7:9A-6.4
of the current Standards for Individual Subsurface Sewage Disposal
Systems (Chapter 9A).
(d)
Permeability tests shall be either the tube permeameter test
or the soil permeability class rating technique in accordance with
N.J.A.C. 7:9A-6.2 and 7:9A-6.3 of the current Standards for Individual
Subsurface Sewage Disposal Systems (Chapter 9A).
(e)
Reports shall be furnished to the Board Engineer indicating
the result of each percolation test in minutes per inch (including
unacceptable rates), the date of the test, effect of recent rain or
lack of rain, the apparent moisture of the soil prior to the test,
the depth to groundwater when encountered, number of preliminary tests
made to determine apparent saturation, the type or types of soil encountered,
using the Unified Soil Classification System, together with the thickness
of each layer and all other factors affecting percolation test results.
m. Soil, Geology and Groundwater. The following information shall be
required in all cases:
1. The number of test borings or pits shall be as specified by this
chapter.
2. The minimum depth of test borings or pits shall be 10 feet or four
feet below the bottom elevation of the proposed basin or recharge
system, whichever is greater. Power augers may be used to advance
or clean out test holes to sampling depths but may not be used to
retrieve soil samples. Split spoon samplers, plug samplers or other
sampling devices may be used which retrieve a relatively undisturbed
soil sample. Hand augers may be used as long as the test hole remains
open and does not cave or slump.
3. Reports of the type, nature and depth of the soil as found, the depth
to groundwater when encountered, and the seasonal high-water table
elevation shall be shown on the plans. Three options are open to the
applicant for determining depth to seasonal high-water table. First,
if sole reliance is on the measurement of depth to groundwater (the
actual physical measurement) then the test must be taken between January
and April, inclusive, and with the absence of mottling. Second, the
applicant may use available maps and data from the Soil Conservation
Service, provided the soil series mapped is verified by actual on-site
soils testing. Or third, as determined by mottling.
4. Locations and results of percolation/permeability tests, locations
of soil borings and boring logs shall be shown on the plans.
5. Fill material.
(a)
Fill material used for stormwater facility construction shall
have a percolation rate equal to or greater than existing soil conditions.
Fill material shall be as free of clay soils as possible. Sieve analyses
shall be performed on representative soil samples of all fill material
and the effective size and the uniformity coefficient determined.
Fill material shall meet or exceed the quality of the existing soil
as determined by the sieve analyses.
(b)
Test results shall be obtained by a certified laboratory and
shall be submitted to the Township Engineer prior to the commencement
of grading operations.
(c)
However, the Board Engineer may require additional information
relative to soil structure, geology and groundwater elevations adjacent
to or below the proposed basin or disposal area.
n. Emergency Spillways.
1. Vegetated emergency spillways shall have side slopes not exceeding
three horizontal to one vertical.
2. Emergency spillways excavated from noncompacted soil shall be suitably
lined and shall comply with criteria contained in Standards for Soil
Erosion and Sediment Control in New Jersey.
3. Maximum velocities in emergency spillways shall be checked based
on the velocity of the peak flow in the spillway resulting from the
routed emergency spillway hydrograph. Where maximum velocities exceed
those contained in Standards for Soil Erosion and Sediment Control
in New Jersey, suitable lining shall be provided.
o. Dams and Embankments.
1. The minimum top widths of all dams and embankments are listed below.
These values have been adopted from the Standards for Soil Erosion
and Sediment Control in New Jersey published by the New Jersey State
Soil Conservation Committee.
Minimum Top Widths
|
---|
Height
(Feet)
|
Top Width
(Feet)
|
---|
0 to 15
|
10
|
15 to 20
|
12
|
20 to 25 or greater
|
14
|
2. The design top elevation of all dams and embankments after all settlement
has taken place shall be equal to or greater than the maximum water
surface elevation in the basin resulting from the routed freeboard
hydrograph. Therefore, the design height of the dam or embankment,
defined as the vertical distance from the top down to the bottom of
the deepest cut, shall be increased by the amount needed to ensure
the design top elevation will be maintained following all settlement.
This increase shall not be less than 5%. Where necessary, the Engineer
shall require consolidation tests of the undisturbed foundation soil
to more accurately determine the necessary increase in design height.
3. All earth fill shall be free from brush, roots and other organic
material subject to decomposition.
4. Cutoff trenches are to be excavated along the dam or embankment center
line to impervious subsoil.
5. Safety ledges shall be constructed on the side slopes of all retention
basins having a permanent pool or water. The ledges shall be four
feet to six feet in width and located approximately 2 1/2 to
three feet below and one to 1 1/2 feet above the permanent water
surface.
6. The fill material in all earth dams and embankments shall be compacted
to at least 95% of the maximum dry density obtained from compaction
tests performed by the appropriate method in ASTM D698.
p. Stormwater Basin Bottom.
1. To promote complete emptying and prevent standing water or soggy
surfaces, vegetated bottoms shall have a minimum slope of 2% and shall
be graded to the outlet structure or low flow channel or low point
(for infiltration basin).
2. To promote complete emptying and prevent standing water or soggy
surfaces, the lowest point in the bottom shall be two feet above the
seasonally high groundwater level unless adequate subsurface drains
are provided.
3. To provide adequate drying time, as to avoid delaying scheduled maintenance
efforts, and to prevent mosquito breeding, the maximum storage or
ponding duration should not exceed 48 hours.
4. Subsurface drains connected to a low-flow channel, principal outlet
structure or other downstream discharge point shall be employed whenever
possible to promote quick and thorough drying of the facility bottom.
5. To minimize routine grass maintenance such as mowing and fertilizing,
the use of grass varieties that are relatively slow growing and tolerant
of poor soil conditions are encouraged.
6. To facilitate removal efforts, sedimentation shall be promoted at
localized, readily accessible areas. The use of sediment traps at
inflow and outflow points is encouraged, especially those lined with
materials which have smooth, easily cleaned surfaces such as concrete.
For this reason, the use of loose stone, rip rap and other irregular
linings which require manual removal of weeds, sediment and debris
should be avoided.
7. Subsurface detention/infiltration facilities shall provide suitable
access, observation points and/or monitoring wells to facilitate inspection
and cleaning.
q. Stormwater Basin Access.
1. The facility must be readily accessible from a street or other public
right-of-way. Inspection and maintenance easements, connected to the
street or right-of-way, should be provided around the entire facility.
The exact limits of the easements and rights-of-way should be specified
on the project plans and other appropriate documents.
2. Access roads and gates shall be wide enough to allow passage of necessary
maintenance vehicles and equipment, including trucks, backhoes, grass
mowers and mosquito-control equipment. In general, a minimum right-of-way
width of 15 feet and a minimum roadway width of 12 feet is required.
3. To facilitate entry, a curb cut shall be provided where an access
road meets a curbed roadway.
4. To allow safe movement of maintenance vehicles, access ramps shall
be provided to the bottoms of all detention facilities greater than
three feet in depth. Access ramps should not exceed 10% in grade.
5. Access roads and ramps shall be stable and suitably lined to prevent
rutting and other damage by maintenance vehicles and equipment.
6. When backing up is difficult or dangerous, turnaround areas should
be provided at the end of all access roads.
7. All stormwater basins shall be perimeter fenced for safety purposes.
The minimum fence height shall be six feet.
8. To allow safe movement of maintenance personnel and safe operation
of equipment, fences shall be located at least three feet beyond the
top or toe of any slope steeper than five horizontal to one vertical.
9. Fences shall be constructed of durable, vandal-resistant materials.
Fences must meet all municipal code requirements.
10. To minimize the amount of required trimming, fences in grassed areas
should be installed, whenever practical, with bottom rail set high
enough above finished grade to allow mowing beneath it.
11. Facility perimeters should be sized and stabilized to allow movement
and operation of maintenance and mosquito-control equipment. A minimum
perimeter width of 25 feet between the facility and adjacent structures
is required along at least one side of the facility. This portion
of the perimeter shall be readily accessible from a street or other
public or private right-of-way. Gates shall be equipped with a double-lock
system in cooperation with the Ocean County Mosquito Commission to
permit same access to the basins.
12. The top of bank for facilities constructed in cut and the toe of
slope for facilities constructed in fill shall be located no closer
than 10 feet to an existing or proposed property line.
13. Detention basins shall be attractively buffered and landscaped, and
designed as to minimize propagation of insects, particularly mosquitoes.
All landscaping and buffering shall be approved by the Board Engineer.
14. For safe movement of personnel and safe operation of equipment, side
slopes greater than five feet in height shall not be steeper than
four horizontal to one vertical. Side slopes less than five feet high
shall not exceed three horizontal to one vertical. Flatter side slopes
shall be constructed wherever possible.
15. For safe movement of personnel and safe operation of equipment, side
slopes steeper than five to one and higher than 15 feet shall be terraced
at their midpoints. The terrace shall have a minimum width of three
feet and shall be graded at 2% towards the lower 1/2 of the slope.
16. Suitable access to and along side slopes shall be provided for maintenance
personnel and equipment.
r. Detention Facilities in Flood Hazard Areas.
1. Whenever practicable, developments and their stormwater detention
facilities should be beyond the extent of the flood hazard area of
a stream. When that is not possible and detention facilities are proposed
to be located partially or wholly within the flood hazard area (as
defined by the New Jersey Division of Water Resources, Bureau of Floodplain
Management), or other areas which are frequently flooded, some storm
conditions will make the facility ineffective at providing retention
of site runoff. This will happen if the stream is already overflowing
its banks and the detention basin, causing the basin to be filled
prior to the time it is needed. In such cases the standards established
in these regulations will be modified in order to give only partial
credit to detention capacities located within a flood hazard area.
The credit will vary in a ratio intended to reflect the probability
that storage in a detention basin will be available at the time a
storm occurs at the site.
2. Detension Storage.
(a)
Detention storage provided below the elevation of the edge of
the 100-year floodplain will be credited as effective storage at a
reduced proportion as indicted in the table below:
Size of Drainage Area in Square Miles*
|
---|
Elevation
|
Less than 5
|
5 to 100
|
Greater than 100
|
---|
Less than 2 feet below
|
40%
|
65%
|
90%
|
Between 2 feet and 4 feet below
|
25%
|
50%
|
75%
|
Over 4 feet below
|
10%
|
25%
|
50%
|
*Area contributing floodwaters to the flood hazard area
at the site in question.
(b)
This effective detention storage will be required to provide
for drainage of the developed land in accordance with the criteria
already established in these regulations. However, the gross storage
considered for crediting will not exceed that which would be filled
by runoff of a 100-year storm from the site.
3. As an alternative to the approach in Subsection
r2 above, if the developer can demonstrate that the detention provided would be effective, during runoff from the 100-year, twenty-four-hour, Type II storm, peaking simultaneously at the site and on the flood hazard area, his plan will be accepted as complying with provisions of Subsection
r2 above.
4. In making computations under Subsection
r2 or
3 above, the volume of net fill added to the flood hazard area portion of the project's site will be subtracted from the capacity of effective detention storage provided. (Net fill is defined as the total amount of fill created incidental to the completion of the project less the amount of excavated material removed during the completion of the project, both measured below the elevation of the edge of the flood hazard area.)
5. Where detention basins are proposed to be located in areas which are frequently flooded but have not been mapped as flood hazard areas, the provisions of either Subsection
r2 or
3 will be applied, utilizing the elevation of a computed 100-year flood.
6. Developers are also required to show compliance with the flood hazard
area regulations of the Department of Environmental Protection.
s. Division of Coastal Resources.
1. All projects containing stream encroachments within the flood hazard
area and 100-year floodplain, at locations having a drainage area
of over 50 acres and all "projects of special concern" as defined
in N.J.A.C. 7:13-5, are subject to the approval of NJDEP, Division
of Coastal Resources.
2. All projects containing a drainage area over 50 acres must establish
the 100-year floodplain zone in accordance with N.J.A.C. 7:13-1.8,
the Technical Manual for Stream Encroachment prepared by the NJDEP,
Bureau of Floodplain Management.
t. Standards for Stream Corridor Protection. To the extent practicable
and consistent with other site planning criteria, and with appropriate
beneficial use of the site as a whole, it is recommended that no alteration
of the natural terrain should occur, and no impervious surfaces should
be located, within a stream corridor. The corridor should include
all floodplain areas, adjacent slopes of 12% or greater, and contiguous
areas where the depth of the seasonal high-water table is one foot
or less.
a. In addition to the plans, calculations, test results and reports
necessary for compliance with the various sections of this chapter,
the following submissions shall be required for each proposed project
subject to review under this chapter. The applicant is free to combine
exhibits or otherwise consolidate the required information, so long
as all required information is clearly presented.
1. Topographic Base Map. Topographic base map of the site, and extending
a minimum of 200 feet beyond the limits of the proposed development
at a scale of one inch equals 100 feet or greater, showing two-foot
contour intervals. The map shall indicate at least the following:
existing surface water drainage, marshlands, outlines of woodland
cover, existing man-made structures, roads, utilities, bearing and
distances of property lines, and significant natural and man-made
features not otherwise shown.
2. Vicinity Map. The applicant must prepare a map at a scale of one
inch equals 400 feet or greater, on a paper/print of the latest air
photographs available, updated in the field to reflect current conditions,
showing the relationship of the proposed development to significant
features in the general surroundings. The map must indicate at least
the following: roads, pedestrian ways, access to the site, adjacent
land uses, existing open space, public facilities, landmarks, places
of architectural and historic significance, utilities, drainage (including,
specifically, streams and other surface water shown on USGS and soils
maps), and other significant features not otherwise shown.
3. Environmental Site Analysis. A written and graphic description of
the natural and man-made features of the site and its environs. This
description should include a discussion of soil condition, slopes,
wetlands, vegetation and animal life on the site. Particular attention
should be given to unique, unusual or environmentally sensitive features
and to those that provide particular opportunities or constraints
for development.
4. Project Description and Site Plan(s). A map (or maps) at the scale
of the topographical base map indicating the location of proposed
buildings, roads, parking areas, utilities, structural facilities
for detaining or recharging stormwater and sediment control, and other
permanent structures. The map(s) shall also clearly show areas where
alterations in the natural terrain, cover and grade are proposed,
and changes in natural cover, including lawns and other landscaping.
A written description of the site plan and justification of proposed
changes in natural conditions may also be provided.
5. Water Detention Facilities Map. The following information, illustrated
on a map of the same scale as the topographic base map, shall be included:
(a)
Total area to be paved or built upon, estimated land area to
be occupied by water-detention facilities and the type of vegetation
thereon, and details of the proposed plan to control and dispose of
surface water.
(b)
Details of all water detention plans, during and after construction,
including discharge provisions, discharge capacity for each outlet
at different levels of detention and emergency spillway provisions
with maximum discharge capacity of each spillway.
(c)
Maximum discharge and total volume of runoff which would occur
from the project area before and after development for the following
storms:
(1)
One and one-quarter inch of rainfall occurring within two hours,
or a one-year frequency Type III, twenty-four-hour storm.
(2)
The specified design storms (two-year, ten-year and 100-year).
b. The Municipal Board reviewing an application under this chapter may,
in consultation with the Board Engineer, waive submission of any of
the above requirements when the information requested cannot feasibly
be obtained, when it would create a hardship on the applicant to obtain
or where its absence will not materially affect the review process.
a. Responsibility for operation and maintenance of stormwater management
facilities, including periodic removal and disposal of accumulated
particulate material and debris, shall remain with the owner or owners
of the property with permanent arrangements that it shall pass to
any successive owner, unless assumed by a government agency. Such
permanent arrangements may be by deed restriction or covenant, and
shall also be noted on the filed map. If portions of the land are
to be sold, legally binding arrangements shall be made to pass the
basic responsibility to successors in title. These arrangements shall
designate for each project the property owner, governmental agency
or other legally established entity to be permanently responsible
for maintenance, hereinafter in this section referred to as the "responsible
person."
b. Prior to granting approval to any project subject to review under
this chapter, the applicant shall submit a maintenance plan and enter
into an agreement with the Township to ensure the continued operation
and maintenance of the stormwater management facility. This agreement
shall be in a form satisfactory to the Board Attorney, and may include,
but not necessarily be limited to, personal guarantees, deed restrictions,
covenants, and bonds. In cases where property is subdivided and sold
separately, a homeowner's association or similar permanent entity
shall be established as the responsible entity, absent an agreement
by a governmental agency to assume responsibility.
c. In the event that the stormwater management facility becomes a danger
to public safety or public health, or if it is in need of maintenance,
the Township shall so notify in writing the responsible person. From
the notice, the responsible person shall have 14 days to effect such
maintenance and repair of the facility in a manner that is approved
by the Township Engineer or his designee. If the responsible person
fails or refuses to perform such maintenance and repair, the Township
may immediately proceed to do so and shall bill the cost thereof to
the responsible person. In each instance where the Township performs
such maintenance or repair, the Township Engineer shall certify the
cost of same to the governing body, which shall examine the certificate,
and if found to be correct shall cause the cost as shown thereon to
be charged against such land. The amount so charged shall forthwith
become a lien upon such lands and shall be added to and become and
form a part of the taxes next to be assessed and levied upon such
lands, the same to bear interest at the same rate as taxes and to
be collected and enforced by the same officers and in the same manner
as taxes.
The Department of Engineering shall ascertain, in each drainage
instance, the drainage area of which the specific subdivision or site
is a part, and apportion the fair costs of adequate drainage for the
whole drainage area among the landowners who contribute to or who
will contribute to, the stormwater runoff if the subdivision or site
plan is approved. Each subdivision or site plan requiring provisions
for drainage of stormwater runoff shall install an adequate drainage
system for the specific development and shall also pay in cash or
check to the Township Drainage Trust Fund for the ultimate disposal
of the stormwater runoff to an adequate outlet. Each payment made
to the Township shall be nonrefundable and held by it in trust until
the overall ultimate disposal system is constructed for the drainage
area in question, at which time the trust funds raised for that drainage
area shall be used for such construction in and for that area.
[Ord. No. 94-29 § 118-14.28]
The arrangement of streets within a development shall provide
for the extension and/or realignment of existing streets, except that
local and local collector streets should only be extended when such
extension is necessary and the Board concurs that such extension will
promote safety and conform to the street standards contained elsewhere
in this chapter.
[Ord. No. 94-29 § 118-14.28B]
Where developments abut existing roadways, sufficient rights-of-way
shall be reserved to provide the width proposed for the functional
classification of the street in question.
[Ord. No. 94-29 § 118-14.28C]
Local streets shall be designed in accordance with the Schedule
of Street Design Standards and the following requirements:
a. Local streets shall be arranged so that there exists a minimum possibility
of their use by traffic which does not have its origin or destination
at the lots to which the local streets provide access.
b. Culs-de-sac (dead-end streets) should have centerline length, from
the intersecting street center line to the center point of the turnaround
of the cul-de-sac, of not less than 100 feet nor longer than 2,000
feet and should not provide access to more than 25 lots. They shall
provide an end turnaround with a pavement radius of not less than
40 feet and a property line radius of not less than 50 feet, which
shall have its center point at or to the left of the centerline of
the street, when viewed toward the closed end. In the event that it
is contemplated that a dead-end street shall be extended in the future,
a temporary turnaround, meeting the aforementioned design criteria,
shall be required.
c. Loop streets should provide access to not more than 45 lots, except
that where access is provided by a combination of a short loop street
and cul-de-sacs, the maximum shall be 60 lots, provided that the length
of the loop street alone will not exceed 3,000 feet. Loop streets
shall have both of their termini located on the same street.
d. P-loops, which are loop streets with a single access point, should
have an entrance not exceeding 700 feet in distance from the loop
intersection. There should also be provided an emergency vehicular
and pedestrian right-of-way of 15 feet minimum width from the loop
and providing access to a street which is not a part of the P-loop.
The loop of a P-loop should have a street length not exceeding 3,000
feet. P-loops should provide access to no more than 60 lots, and the
entrance street should be designed in accordance with the design standards
for minor collector streets.
e. Artificial modifications in street rights-of-way for the purpose
of increasing lot frontage shall be prohibited. Such prohibited modification
shall include but shall not be limited to widening the rights-of-way
of a continuous street through the use of semicircular projections.
f. Reduced Paving Width. When a cul-de-sac or loop street provides access
to 25 or fewer lots, the Planning Board may consider the use of reduced
paving width where, by reason of topography, physical features or
other conditions, the reduced paving width would substantially reduce
disruption of the development's environment. In no case shall the
paving width of a two-way cul-de-sac or loop street be reduced to
less than 28 feet. The Board may consider the use of one-way loop
streets with a minimum paving width of 22 feet. Such one-way streets
with reduced paving width are subject to the review and approval of
the Traffic Bureau of the New Jersey Department of Transportation.
Such review and approval must be obtained by the developer before
approval of a final plat will be granted.
[Ord. No. 94-29 § 118-14.28D]
In any development it shall be the duty of the Board to approve
classification of proposed streets according to their use. In making
its decisions, the Board shall refer to the Master Plan and shall
consider conditions within the development and the surrounding areas
and shall use as a guide the following street classifications and
criteria:
a. Local Street. A local street is a street serving only single-family
residences and where feasible should be either a cul-de-sac or a loop
street meeting the requirements hereinabove set forth. A street which
serves traffic having origins and destinations other than within the
lots which abut the street shall not be considered a local street.
The maximum traffic normally expected on a local street shall be 500
vehicles per day.
b. Local Collector or Minor Collector Street. A local collector or minor
collector is generally a street gathering traffic from local streets
and feeding it into a system of major collectors, minor arterial and
major arterial highways. Even if laid out as a local street, a street
should be considered a local or minor collector street if it provides
access or could provide access to more than 60 lots or, in the case
of a cul-de-sac, more than 25 lots, or could be utilized by traffic
other than residential in nature. Local or minor collector streets
should generally not be expected to carry traffic exceeding 1,000
vehicles per day. The design speed of local or minor collectors, for
alignment and sight distance purposes, should be 40 miles per hour.
c. Major Collector Streets. A major collector street is generally a
street gathering traffic from local streets or minor collector streets
and feeding it into a system of arterial highways. Even if laid out
as a local or minor collector street, a street should be considered
a major collector street if it provides access or could provide access
to more than 150 lots or would be utilized by traffic other than residential
in nature. Major collector streets would generally not be expected
to carry traffic exceeding 2,500 vehicles per day. The design speed
of major collector streets, for alignment and sight distance purposes,
should be 50 miles per hour.
d. Minor Arterials. Minor arterials are streets gathering traffic from
more than one local, minor or major collector street and leading it
to a system of other minor arterials or principal arterial streets.
Minor arterials shall have a design speed, for alignment and sight
distance purposes, of 60 miles per hour and should generally be designed
to carry traffic volume approaching 10,000 vehicles per day.
e. Principal Arterial Highways. Principal arterials are any Federal,
State or County highways or municipal streets or roads intended to
carry traffic between other major arterials and minor arterials and
between the various neighborhoods of the Township or from the Township's
neighborhoods to destinations outside the Township. Principal arterial
highways should have a design speed of 60 miles per hour and should
be designed to carry traffic exceeding 10,000 vehicles per day.
f. Classification Criteria. Street classifications will be approved
by the Board in accordance with the foregoing definitions, in accordance
with the provisions of the Master Plan and Official Map if such are
adopted, in accordance with the provisions of applicable County and
State regulations or plans or, in the absence of specific information
from the above, in accordance with its own best judgment concerning
the use to which the various streets in any development will be put.
[Ord. No. 94-29 § 118-14.28E]
In any subdivision abutting or being traversed by a major collector
street, minor arterial or principal arterial highway, one of the following
conditions shall be required by the Board:
a. A marginal street meeting the classification herein for a local street
shall be provided along each major collector, minor arterial or principal
arterial highway and shall be separated from the major collector,
minor arterial or principal arterial highway by a landscaped strip
at least 25 feet in width.
b. The frontage of all lots abutting the major collector, minor arterial
or principal arterial highway shall be reversed so that the lots will
front on an internal local street; a natural wooded or landscaped
buffer strip at least 50 feet in width will be provided on the abutting
lots along the right-of-way of the major collector, minor arterial
or principal arterial highway. The area of such buffer strip shall
not be considered part of the required minimum lot size.
c. All lots abutting major collector streets may, in lieu of the above,
be provided with suitable driveway turnarounds eliminating any necessity
for vehicles to back into the collector street.
d. Other means of providing a satisfactory buffer separating through
and local traffic shall be provided as may be deemed proper by the
Board.
e. Dwellings on corner lots shall have their driveway access on the
roadway designed and intended to carry the lesser amount of traffic.
[Ord. No. 94-29 § 118-14.28F]
Street design standards shall be appropriate to the expected
use of the street, soil, topographical and other physical conditions
and to the maintenance of the purpose of this chapter but shall not
be less than those set forth in the Schedule of Street Design Standards.
[Ord. No. 94-29 § 118-14.28G]
Street intersections shall be designed according to the following
standards:
a. No more than two streets shall cross the same point. Street intersections
shall be at right angles wherever possible, and intersections of less
than 70°, measured at the centerline of streets, shall not be
permitted.
b. Streets should not enter the same side of local, minor or major collector
streets at intervals of less than 500 feet, minor arterials at intervals
of less than 1,200 feet or principal arterials at intervals of less
than 2,500 feet. Streets which enter collectors, minor arterials or
principal arterials from opposite sides shall be directly opposite
to each other or must be separated by at least 300 feet between their
center lines measured along the center line of an intersected collector
or 500 feet along the center line of a minor arterial or 800 feet
along the center line of a principal arterial.
c. Approaches of any major collector, minor arterial or principal arterial
street to any intersection of another major collector, minor arterial
or principal arterial street shall be tangent or have a center line
radius greater than 5,000 feet for at least 500 feet from the intersection.
d. Where a minor or major collector, major thoroughfare or major arterial
street intersects with a major collector, major thoroughfare or major
arterial street, the right-of-way of each minor collector shall be
widened by 10 feet [five feet for each side] for a distance of 300
feet in all directions from the intersection of the center lines,
and the right-of-way of each major collector, minor arterial and principal
arterial shall be widened by 20 feet [10 feet for each side] for 500
feet in all directions from the intersection of the center lines.
e. Approaches of any local, local collector or minor collector street
to any other street shall:
1. Be tangent (straight) for a distance of at least 50 feet from the
intersection; or
2. Have a center-line radius greater than 1,000 feet for at least 150
feet from the intersection; and
3. Have a clear sight of a point three feet high in the intersection
for a distance of not less than 400 feet.
[Ord. No. 94-29 § 118-14.28H]
a. Curved local, local collector and minor collector streets are preferred
to discourage speed and monotony. The maximum straight-line distance
should not exceed 1,000 feet.
b. The Board in all cases may, and in the case of subdivisions having
100 or more lots shall, require provisions for continuing circulation
patterns onto adjacent properties and, for this purpose, may require
the provision of stub streets abutting adjacent properties.
c. Subdivisions containing more than 150 lots should have two access
points from collector streets or arterial highways.
[Ord. No. 94-29 § 118-14.28I]
Street names shall not duplicate, nearly duplicate or be phonetically
similar to the names of any existing streets or development in Berkeley
Township. Any continuation of an existing street shall have the same
street name.
[Ord. No. 94-29 § 118-14.28J]
The developer shall complete all improvements to the limits
of the development, unless other provisions have been made and approved
by the Board. In those instances where completion of certain improvements
would not be possible until the development of adjacent land takes
place, alternate temporary improvements may be constructed subject
to the approval of the Board, and cash or a certified check representing
the difference between the value of the temporary improvements and
the required improvements may be accepted by the Township Council
to be credited toward the completion of such improvements at such
time as the adjacent land develops.
[Ord. No. 94-29 § 118-14.28K]
The right-of-way width and other standards for internal roads
and alleys in multifamily, commercial and industrial developments
shall be as set forth herein by ordinance or determined by the Board
on an individual basis and shall in all cases be of sufficient width
and design to safely accommodate maximum traffic, parking and loading
needs and maximum access for firefighting equipment and shall generally
conform to the requirements herein.
[Ord. No. 94-29 § 118-14.28L]
There shall be no reserve strips or areas controlling access
to streets except where control and disposal of the land comprising
such strips or areas have been placed in the hands of the Governing
Body under conditions approved by the Board.
SCHEDULE OF STREET DESIGN STANDARDS
|
---|
|
Local
|
Local Collector
|
Minor Collector Streets
|
Major Collector Streets
|
Minor Arterial Highways
|
---|
Normal traffic Capacity (ADT)
|
500
|
1,000
|
1,000
|
2,500
|
10,000
|
Minimum right-of-way width
|
50 feet
|
60 feet
|
60 feet
|
70 feet
|
100 feet
|
Paving width:
|
|
|
|
|
|
Two-way
|
30 feet
|
30 feet
|
40 feet
|
50 feet
|
60 feet
|
One-way
|
22 feet
|
—
|
—
|
—
|
—
|
Shoulder (or parking area width)1
|
—
|
—
|
—
|
—
|
2 @ 8 feet
|
Sidewalk width
|
4 feet
|
4 feet
|
4 feet
|
4 feet
|
4 feet
|
Design speed (mph)2
|
40
|
40
|
40
|
50
|
60
|
Minimum radius of horizontal curvature at centerline
|
150 feet
|
300 feet
|
500 feet
|
750 feet
|
2,000 feet
|
Minimum tangent between reverse curbs
|
100 feet
|
100 feet
|
200 feet
|
400 feet3
|
600 feet3
|
Maximum longitudinal grade
|
10%
|
8%
|
8%
|
6%
|
4%
|
Minimum longitudinal grade
|
|
|
|
|
|
Desirable
|
0.75%
|
0.75%
|
0.75%
|
0.75%
|
0.75%
|
Absolute
|
0.50%
|
0.50%
|
0.50%
|
0.50%
|
0.50%
|
Maximum longitudinal grade for 200 feet from each side of an
intersection
|
3.50%
|
3.00%
|
3.00%
|
2.50%
|
—
|
Minimum curb return radius at intersection8
|
25 feet
|
25 feet
|
25 feet
|
35 feet
|
45 feet
|
Vertical curb4
|
|
|
|
|
|
Crest: Minimum length equals 100 feet, based on
stopping sight distance at design speed
|
Sag: Minimum length equals 100 feet, based on headlight
illumination and stopping sight distance at design speed
|
Maximum super-elevation
|
Not Required
|
6%
|
6%
|
Pavement cross-slope minimum
|
3.33%6
|
3.33%6
|
3.35%7
|
2%
|
1.50%7
|
Pavement cross-slope maximum
|
3.33%6
|
3.33%6
|
3.35%7
|
4%
|
3%
|
Curb face required5
|
6 in.
|
6 in.
|
8 in.
|
8 in.
|
8 in.
|
Minimum property line corner radius8
|
15 feet
|
15 feet
|
15 feet
|
25 feet
|
30 feet
|
Notes:
|
---|
1
|
Shoulders or parking areas as required may be reduced structural
design.
|
2
|
For site distance and vertical curve calculation only.
|
3
|
Or as required to run off superelevation [1% per second of travel
at design speed].
|
4
|
Not required if algebraic difference of intersecting grades
does not exceed 1.
|
5
|
Except in superelevation areas.
|
6
|
6-inch crown.
|
7
|
8-inch crown.
|
8
|
When dissimilar streets intersect, the larger radius will be
used.
|
[Ord. No. 06-09-OAB §§ 1
through 14; amended 12-21-2020 by Ord. No. 20-45-OAB; 3-22-2021 by Ord. No. 21-09-OAB]
a. Policy Statement. Flood control, groundwater recharge, and pollutant
reduction shall be achieved through the use of stormwater management
measures, including green infrastructure best management practices
(GI BMPs) and nonstructural stormwater management strategies. GI BMPs
or low-impact development (LID) should be utilized to meet the goal
of maintaining natural hydrology to reduce the stormwater runoff volume,
reduce erosion, encourage infiltration and groundwater recharge, and
reduce pollution. GI BMPs and nonstructural or low-impact techniques
shall be explored before relying on structural BMPs. Structural BMPs
should be integrated with nonstructural stormwater management strategies
and proper maintenance plans. Nonstructural strategies include both
environmentally sensitive site design and source controls that prevent
pollutants from being placed on the site or from being exposed to
stormwater. Source control plans should be developed based upon physical
site conditions and the origin, nature, and the anticipated quantity
or amount of potential pollutants. Multiple stormwater management
BMPs may be necessary to achieve the established performance standards
for water quality, quantity, and groundwater recharge.
b. Purpose. It is the purpose of this section to establish minimum stormwater management requirements and controls for "major development," as defined in Subsection
35-74.2, for certain lands of the Township of Berkeley that do not lie within the Pinelands Area.
c. Applicability.
1. This section shall be applicable to all site plans, subdivisions,
and road improvement plans for the following major developments outside
of the Pinelands Area that require preliminary or final site plan
or subdivision review, or road improvement plan review:
(a)
Nonresidential major developments; and
(b)
Aspects of residential major developments that are not preempted
by the residential site improvement standards at N.J.A.C. 5:21.
2. This section shall also be applicable to all major developments undertaken
by the Township of Berkeley that lie outside of the Pinelands Area.
d. Compatibility with Other Permit and Ordinance Requirements. Development
approvals issued for subdivisions and site plans pursuant to this
section are to be considered an integral part of development approvals
under the subdivision and site plan review process and do not relieve
the applicant of the responsibility to secure required permits or
approvals for activities regulated by any other applicable code, rule,
act, or ordinance. In their interpretation and application, the provisions
of this section shall be held to be the minimum requirements for the
promotion of the public health, safety, and general welfare. This
section is not intended to interfere with, abrogate, or annul any
other ordinance, rule or regulation, statute, or other provision of
law except that, where any provision of this section imposes restrictions
different from those imposed by any other ordinance, rule or regulation,
or other provision of law, the more restrictive provisions or higher
standards shall control.
Unless specifically defined below, words or phrases used in
this section shall be interpreted so as to give them the meaning they
have in common usage and to give this section its most reasonable
application. The definitions below are the same as or based on the
corresponding definitions in the stormwater management rules at N.J.A.C.
7:8-1.2.
CAFRA PLANNING MAP
The map used by the Department to identify the locations
for coastal planning areas, CAFRA centers, CAFRA cores and CAFRA nodes.
The CAFRA Planning Map is available on the Department's Geographic
Information System (GIS).
COMMUNITY BASIN
An infiltration system, sand filter designed to infiltrate,
standard constructed wetland, or wet pond, established in accordance
with N.J.A.C. 7:8-4.2(c)14, that is designed and constructed in accordance
with the New Jersey Stormwater Best Management Practices Manual, or
an alternate design, approved in accordance with N.J.A.C. 7:8-5.2(g),
for an infiltration system, sand filter designed to infiltrate, standard
constructed wetland, or wet pond and that complies with the requirements
of this section.
CONTRIBUTORY DRAINAGE AREA
The area from which stormwater runoff drains to a stormwater
management measure, not including the area of the stormwater management
measure itself.
CORE
A pedestrian-oriented area of commercial and civic uses serving
the surrounding municipality, generally including housing and access
to public transportation.
COUNTY REVIEW AGENCY
An agency designated by the County Board of Chosen Freeholders to review municipal stormwater management plans and implementing
ordinance(s). The county review agency may either be:
a.
A county planning agency; or
b.
A county water resource association created under N.J.S.A. 58:16A-55.5,
if the ordinance or resolution delegates authority to approve, conditionally
approve, or disapprove municipal stormwater management plans and implementing
ordinances.
DEPARTMENT
The New Jersey Department of Environmental Protection.
DESIGN ENGINEER
A person professionally qualified and duly licensed in New
Jersey to perform engineering services that may include, but not necessarily
be limited to, development of project requirements, creation and development
of project design and preparation of drawings and specifications.
DESIGNATED CENTER
A state development and redevelopment plan center as designated
by the State Planning Commission such as urban, regional, town, village,
or hamlet.
DEVELOPMENT
The division of a parcel of land into two or more parcels,
the construction, reconstruction, conversion, structural alteration,
relocation or enlargement of any building or structure, any mining
excavation or landfill, and any use or change in the use of any building
or other structure, or land or extension of use of land, by any person,
for which permission is required under the Municipal Land Use Law,
N.J.S.A. 40:55D-1 et seq. In the case of development of agricultural
lands, development means any activity that requires a state permit;
any activity reviewed by the County Agricultural Board (CAB) and the
State Agricultural Development Committee (SADC), and municipal review
of any activity not exempted by the Right to Farm Act, N.J.S.A. 4:1C-1
et seq.
DISTURBANCE
The placement or reconstruction of impervious surface or
motor vehicle surface, or exposure and/or movement of soil or bedrock
or clearing, cutting, or removing of vegetation. Milling and repaving
is not considered disturbance for the purposes of this definition.
DRAINAGE AREA
A geographic area within which stormwater, sediments, or
dissolved materials drain to a particular receiving water body or
to a particular point along a receiving water body.
EMPOWERMENT NEIGHBORHOOD
A neighborhood designated by the Urban Coordinating Council
"in consultation and conjunction with" the New Jersey Redevelopment
Authority pursuant to N.J.S.A. 55:19-69.
ENVIRONMENTALLY CONSTRAINED AREA
The following areas where the physical alteration of the
land is in some way restricted, either through regulation, easement,
deed restriction or ownership such as wetlands, floodplains, threatened
and endangered species sites or designated habitats, and parks and
preserves. Habitats of endangered or threatened species are identified
using the Department's Landscape Project as approved by the Department's
Endangered and Nongame Species Program.
ENVIRONMENTALLY CRITICAL AREAS
An area or feature which is of significant environmental
value, including, but not limited to, stream corridors; natural heritage
priority sites; habitat of endangered or threatened species; large
areas of contiguous open space or upland forest; steep slopes; and
wellhead protection and groundwater recharge areas. Habitats of endangered
or threatened species are identified using the Department's Landscape
Project as approved by the Department's Endangered and Nongame Species
Program.
EROSION
The detachment and movement of soil or rock fragments by
water, wind, ice or gravity.
GREEN INFRASTRUCTURE
A stormwater management measure that manages stormwater close
to its source by:
a.
Treating stormwater runoff through infiltration into subsoil;
b.
Treating stormwater runoff through filtration by vegetation
or soil; or
c.
Storing stormwater runoff for reuse.
HUC 14 or HYDROLOGIC UNIT CODE 14
An area within which water drains to a particular receiving
surface water body, also known as a subwatershed, which is identified
by a fourteen-digit hydrologic unit boundary designation, delineated
within New Jersey by the United States Geological Survey.
IMPERVIOUS SURFACE
A surface that has been covered with a layer of material
so that it is highly resistant to infiltration by water.
INFILTRATION
The process by which water seeps into the soil from precipitation.
LEAD PLANNING AGENCY
One or more public entities having stormwater management
planning authority designated by the regional stormwater management
planning committee pursuant to N.J.A.C. 7:8-3.2, that serves as the
primary representative of the committee.
MAJOR DEVELOPMENT
a.
An individual development, as well as multiple developments
that individually or collectively result in:
1.
The disturbance of one or more acres of land since February
2, 2004;
2.
The creation of 1/4 acre or more of regulated impervious surface
since February 2, 2004;
3.
The creation of 1/4 acre or more of regulated motor vehicle
surface since March 2, 2021 (or the effective date of this section,
whichever is earlier); or
4.
A combination of Subsection a2 and 3 above that totals an area
of 1/4 acre or more. The same surface shall not be counted twice when
determining if the combination area equals 1/4 acre or more.
b.
Major development includes all developments that are part of
a common plan of development or sale (for example, phased residential
development) that collectively or individually meet any one or more
of Subsection a1, 2, 3, or 4 above. Projects undertaken by any government
agency that otherwise meet the definition of "major development" but
which do not require approval under the Municipal Land Use Law, N.J.S.A.
40:55D-1 et seq., are also considered major development.
MOTOR VEHICLE
Land vehicles propelled other than by muscular power, such
as automobiles, motorcycles, autocycles, and low-speed vehicles. For
the purposes of this definition, motor vehicle does not include farm
equipment, snowmobiles, all-terrain vehicles, motorized wheelchairs,
go-carts, gas buggies, golf carts, ski-slope grooming machines, or
vehicles that run only on rails or tracks.
MOTOR VEHICLE SURFACE
Any pervious or impervious surface that is intended to be
used by "motor vehicles" and/or aircraft, and is directly exposed
to precipitations, including, but not limited to, driveways, parking
areas, parking garages, roads, racetracks, and runways.
NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES (BMP) MANUAL
or BMP MANUAL
The manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this section. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already-included practice reflecting the best available current information regarding the particular practice and the Department's determination as to the ability of that best management practice to contribute to compliance with the standards contained in this section. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Subsection
35-74.4g of this section and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this section.
NODE
An area designated by the State Planning Commission concentrating
facilities and activities which are not organized in a compact form.
NUTRIENT
A chemical element or compound, such as nitrogen or phosphorus,
which is essential to and promotes the development of organisms.
PERSON
Any individual, corporation, company, partnership, firm,
association, Township of Berkeley, or political subdivision of this
state subject to municipal jurisdiction pursuant to the Municipal
Land Use Law, N.J.S.A. 40:55D-1 et seq. Person shall also mean any
state, interstate, or federal agency.
POLLUTANT
Any dredged spoil, solid waste, incinerator residue, filter
backwash, sewage, garbage, refuse, oil, grease, sewage sludge, munitions,
chemical wastes, biological materials, medical wastes, radioactive
substance [except those regulated under the Atomic Energy Act of 1954,
as amended (42 U.S.C. 2011 et seq.)], thermal waste, wrecked or discarded
equipment, rock, sand, cellar dirt, industrial, municipal, agricultural,
and construction waste or runoff, or other residue discharged directly
or indirectly to the land, groundwaters or surface waters of the state,
or to a domestic treatment works. Pollutant includes both hazardous
and nonhazardous pollutants.
RECHARGE
The amount of water from precipitation that infiltrates into
the ground and is not evapotranspired.
REGULATED IMPERVIOUS SURFACE
Any of the following, alone or in combinations:
a.
A net increase of impervious surface;
b.
The total area of impervious surface collected by a new stormwater
conveyance system (for the purpose of this definition, a "new stormwater
conveyance system" is a stormwater conveyance system that is constructed
where one did not exist immediately prior to its construction or an
existing system for which a new discharge location is created);
c.
The total area of impervious surface proposed to be newly collected
by an existing stormwater conveyance system; and/or
d.
The total area of impervious surface collected by an existing
stormwater conveyance system where the capacity of that conveyance
system is increased.
REGULATED MOTOR VEHICLE SURFACE
Any of the following, alone or in combination:
a.
The total area of motor vehicle surface that is currently receiving
water;
b.
A net increase in motor vehicle surface; and/or
c.
Quality treatment either by vegetation or soil, by an existing
stormwater management measure, or by treatment at a wastewater treatment
plant, where the water quality treatment will be modified or removed.
SEDIMENT
Solid material, mineral or organic, that is in suspension,
is being transported, or has been moved from its site of origin by
air, water or gravity as a product of erosion.
SITE
The lot or lots upon which a major development is to occur
or has occurred.
SOIL
All unconsolidated mineral and organic material of any origin.
STATE PLAN POLICY MAP
The geographic application of the State Development and Redevelopment
Plan's goals and statewide policies, and the official map of these
goals and policies.
STORMWATER
Water resulting from precipitation (including rain and snow)
that runs off the land's surface, is transmitted to the subsurface,
or is captured by separate storm sewers or other sewage or drainage
facilities, or conveyed by snow-removal equipment.
STORMWATER MANAGEMENT BMP
An excavation or embankment and related areas designed to
retain stormwater runoff. A stormwater management BMP may either be
normally dry (that is, a detention basin or infiltration basin), retain
water in a permanent pool (a retention basin), or be planted mainly
with wetland vegetation (most constructed stormwater wetlands).
STORMWATER MANAGEMENT MEASURE
Any structural or nonstructural strategy, practice, technology,
process, program, or other method intended to control or reduce stormwater
runoff and associated pollutants, or to induce or control the infiltration
or groundwater recharge of stormwater or to eliminate illicit or illegal
nonstormwater discharges into stormwater conveyances.
STORMWATER MANAGEMENT PLANNING AREA
The geographic area for which a stormwater management planning
agency is authorized to prepare stormwater management plans, or a
specific portion of that area identified in a stormwater management
plan prepared by that agency.
STORMWATER RUNOFF
Water flow on the surface of the ground or in storm sewers,
resulting from precipitation.
TIDAL FLOOD HAZARD AREA
A flood hazard area in which the flood elevation, resulting
from the two-, ten- or 100-year storm, as applicable, is governed
by tidal flooding from the Atlantic Ocean. Flooding in a tidal flood
hazard area may be contributed to, or influenced by, stormwater runoff
from inland areas, but the depth of flooding generated by the tidal
rise and fall of the Atlantic Ocean is greater than flooding from
any fluvial sources. In some situations, depending upon the extent
of the storm surface from a particular storm event, a flood hazard
area may be tidal in the 100-year storm, but fluvial in more-frequent
storm events.
URBAN ENTERPRISE ZONE
A zone designated by the New Jersey Enterprise Zone Authority
pursuant to the New Jersey Urban Enterprise Zones Act, N.J.S.A. 52:27H-60
et seq.
URBAN REDEVELOPMENT AREA
Previously developed portions of areas:
a.
Delineated on the State Plan Policy Map (SPPM) as the Metropolitan
Planning Area (PA1), designated centers, cores or nodes;
b.
Designated as CAFRA centers, cores or nodes;
c.
Designated as Urban Enterprise Zones; and
d.
Designated as Urban Coordinating Council Empowerment Neighborhoods.
WATER-CONTROL STRUCTURE
A structure within, or adjacent to, a water, which intentionally
or coincidentally alters the hydraulic capacity, the flood elevation
resulting from the two-, ten-, or 100-year storm, flood hazard area
limit, and/or floodway limit of the water. Examples of a water-control
structure may include a bridge, culvert, dam, embankment, ford (if
above grade), retaining wall, and weir.
WATERS OF THE STATE
The ocean and its estuaries, all springs, streams, wetlands,
and bodies of surface water or groundwater, whether natural or artificial,
within the boundaries of the State of New Jersey or subject to its
jurisdiction.
WETLANDS or WETLAND
An area that is inundated or saturated by surface water or
groundwater at a frequency and duration sufficient to support, and
that under normal circumstances does support, a prevalence of vegetation
typically adapted for life in saturated soil conditions, commonly
known as "hydrophytic vegetation."
a. Design and Performance Standards for Stormwater Management Measures.
1. Stormwater management measures for major development shall be designed
to provide the erosion control, groundwater recharge, stormwater runoff
quantity control, and stormwater runoff quality treatment as follows:
(a)
The minimum standards for erosion control are those established
under the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39
et seq., and implementing rules at N.J.A.C. 2:90.
(b)
The minimum standards for groundwater recharge, stormwater quality
and stormwater quantity shall be met by incorporating green infrastructure.
2. The standards in this section apply only to new major development
and are intended to minimize the impact of stormwater runoff on water
quality and water quantity in receiving water bodies and maintain
groundwater recharge. The standards do not apply to new major development
to the extent that alternative design and performance standards are
applicable under a regional stormwater management plan or water quality
management plan adopted in accordance with Department rules.
a. The development shall incorporate a maintenance plan for the stormwater management measures incorporated into the design of a major development in accordance with Subsection
35-74.10.
b. Stormwater management measures shall avoid adverse impacts of concentrated
flow on habitats for threatened and endangered species as documented
in the Department's Landscape Project or Natural Heritage Database
established under N.J.S.A. 13:1 B-15.147 through 15.150, particularly
Helonias bullata (swamp pink) and/or Clemmys muhlnebergii (bog turtle).
c. The following linear development projects are exempt from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements of Subsection
35-74.4p,
q and
r.
1. The construction of an underground utility line, provided that the
disturbed areas are revegetated upon completion;
2. The construction of an aboveground utility line, provided that the
existing conditions are maintained to the maximum extent practicable;
and
3. The construction of a public pedestrian access, such as a sidewalk
or trail with a maximum width of 14 feet, provided that the access
is made of permeable material.
d. A waiver from strict compliance with the green infrastructure, groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements of Subsection
35-74.4o,
p,
q and
r may be obtained for the enlargement of an existing public roadway or railroad; or the construction or enlargement of a public pedestrian access, provided that the following conditions are met:
1. The applicant demonstrates that there is a public need for the project
that cannot be accomplished by any other means;
2. The applicant demonstrates, through an alternatives analysis, that through the use of nonstructural and structural stormwater management strategies and measures, the option selected complies with the requirements of Subsection
35-74.4o,
p,
q and
r to the maximum extent practicable;
3. The applicant demonstrates that, in order to meet the requirements of Subsection
35-74.4o,
p,
q and
r, existing structures currently in use, such as homes and buildings, would need to be condemned; and
4. The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands not falling under Subsection
35-74.4d3 above within the upstream drainage area of the receiving stream, that would provide additional opportunities to mitigate the requirements of Subsection
35-74.4o,
p,
q and
r that were not achievable on-site.
e. Tables 1 through 3 below summarize the ability of stormwater best management practices identified and described in the New Jersey Stormwater Best Management Practices Manual to satisfy the green infrastructure, groundwater recharge, stormwater runoff quality and stormwater runoff quantity standards specified in Section
35-74.4o,
p,
q and
r. When designed in accordance with the most current version of the New Jersey Stormwater Best Management Practices Manual, the stormwater management measures found at N.J.A.C. 7:8-5.2 (f) Tables 5-1, 5-2 and 5-3 and listed below in Tables 1, 2 and 3 are presumed to be capable of providing stormwater controls for the design and performance standards as outlined in the tables below. Upon amendments of the New Jersey Stormwater Best Management Practices to reflect additions or deletions of BMPs meeting these standards, or changes in the presumed performance of BMPs designed in accordance with the New Jersey Stormwater BMP Manual, the Department shall publish in the New Jersey Registers a notice of administrative change revising the applicable table. The most current version of the BMP Manual can be found on the Department's website at https://njstormwater.org/bmp_manual2.htm.
f. Where the BMP tables in the New Jersey stormwater management rule
are different due to updates or amendments with the tables in this
section, the BMP tables in the stormwater management rule at N.J.A.C.
7:8-5.2(f) shall take precedence.
Table 1
Green Infrastructure BMPs for Groundwater Recharge, Stormwater
Runoff Quality, and/or Stormwater Runoff Quantity
|
---|
Best Management Practice
|
Stormwater Runoff Quality TSS Removal Rate
(percent)
|
Stormwater Runoff Quantity
|
Groundwater Recharge
|
Minimum Separation from Seasonal High-Water Table
(feet)
|
---|
Cistern
|
0%
|
Yes
|
No
|
—
|
Dry well(a)
|
0%
|
No
|
Yes
|
2
|
Grass swale
|
50% or less
|
No
|
No
|
2(e)
1(f)
|
Green roof
|
0%
|
Yes
|
No
|
—
|
Manufactured treatment device(a)(g)
|
50% or 80%
|
No
|
No
|
Dependent upon the device
|
Pervious paving system(a)
|
80%
|
Yes
|
Yes(b)
No(c)
|
2(b)
1(c)
|
Small-scale bioretention basin(a)
|
80% or 90%
|
Yes
|
Yes(b)
No(c)
|
2(b)
1(c)
|
Small-scale infiltration basin(a)
|
80%
|
Yes
|
Yes
|
2
|
Small-scale sand filter
|
80%
|
Yes
|
Yes
|
2
|
Vegetative filter strip
|
60% to 80%
|
No
|
No
|
—
|
Table 2
Green Infrastructure BMPs for Stormwater Runoff Quantity
(or for Groundwater Recharge and/or Stormwater Runoff Quality
with a Waiver or Variance from N.J.A.C. 7:8-5.3)
|
---|
Best Management Practice
|
Stormwater Runoff Quality TSS Removal Rate
(percent)
|
Stormwater Runoff Quantity
|
Groundwater Recharge
|
Minimum Separation from Seasonal High-Water Table
(feet)
|
---|
Bioretention system
|
80% or 90%
|
Yes
|
Yes(b)
No(c)
|
2(b)
1(c)
|
Infiltration basin
|
80%
|
Yes
|
Yes
|
2
|
Sand filter(b)
|
80%
|
Yes
|
Yes
|
2
|
Standard constructed wetland
|
90%
|
Yes
|
No
|
N/A
|
Wet pond(d)
|
50% to 90%
|
Yes
|
No
|
N/A
|
Table 3
BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or
Stormwater Runoff Quantity
only with a Waiver or Variance from N.J.A.C. 7:8-5.3
|
---|
Best Management Practice
|
Stormwater Runoff Quality TSS Removal Rate
(percent)
|
Stormwater Runoff Quantity
|
Groundwater Recharge
|
Minimum Separation from Seasonal High-Water Table
(feet)
|
---|
Blue roof
|
0%
|
Yes
|
No
|
N/A
|
Extended detention basin
|
40% to 60%
|
Yes
|
No
|
1
|
Manufactured treatment device(h)
|
50% or 80%
|
No
|
No
|
Dependent upon the device
|
Sand filter(c)
|
80%
|
Yes
|
No
|
1
|
Subsurface gravel wetland
|
90%
|
No
|
No
|
1
|
Wet pond
|
50% to 90%
|
Yes
|
No
|
N/A
|
Notes to Tables 1, 2, and 3:
|
---|
(a)
|
Subject to the applicable contributory drainage area limitation specified at Subsection 35-74.4o2;
|
(b)
|
Designed to infiltrate into the subsoil;
|
(c)
|
Designed with underdrains;
|
(d)
|
Designed to maintain at least a ten-foot-wide area of native
vegetation along at least 50% of the shoreline and to include a stormwater
runoff retention component designed to capture stormwater runoff for
beneficial reuse, such as irrigation;
|
(e)
|
Designed with a slope of less than 2%;
|
(f)
|
Designed with a slope of equal to or greater than 2%;
|
(g)
|
Manufactured treatment devices that meet the definition of green infrastructure at Subsection 35-74.2;
|
(h)
|
Manufactured treatment devices that do not meet the definition of green infrastructure at Subsection 35-74.2.
|
g. An alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate may be used if the design engineer demonstrates the capability of the proposed alternative stormwater management measure and/or the validity of the alternative rate or method to the municipality. A copy of any approved alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate shall be provided to the Department in accordance with Subsection
35-74.6b. Alternative stormwater management measures may be used to satisfy the requirements at Subsection
35-74.4o only if the measures meet the definition of green infrastructure at Subsection
35-74.2. Alternative stormwater management measures that function in a similar manner to a BMP listed at Subsection
35-74.4o2 are subject to the contributory drainage area limitation specified at Subsection
35-74.4o2 for that similarly functioning BMP. Alternative stormwater management measures approved in accordance with this subsection that do not function in a similar manner to any BMP listed at Subsection
35-74.4o2 shall have a contributory drainage area less than or equal to 2.5 acres, except for alternative stormwater management measures that function similarly to cisterns, grass swales, green roofs, standard constructed wetlands, vegetative filter strips, and wet ponds, which are not subject to a contributory drainage area limitation. Alternative measures that function similarly to standard constructed wetlands or wet ponds shall not be used for compliance with the stormwater runoff quality standard unless a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with Subsection
35-74.4d is granted from Section
35-74.4o.
h. Whenever the stormwater management design includes one or more BMPs
that will infiltrate stormwater into subsoil, the design engineer
shall assess the hydraulic impact on the groundwater table and design
the site so as to avoid adverse hydraulic impacts. Potential adverse
hydraulic impacts include, but are not limited to, exacerbating a
naturally or seasonally high-water table, so as to cause surficial
ponding, flooding of basements, or interference with the proper operation
of subsurface sewage disposal systems or other subsurface structures
within the zone of influence of the groundwater mound, or interference
with the proper functioning of the stormwater management measure itself.
i. Design standards for stormwater management measures are as follows:
1. Stormwater management measures shall be designed to take into account
the existing site conditions, including, but not limited to, environmentally
critical areas; wetlands; flood-prone areas; slopes; depth to seasonal
high-water table; soil type, permeability, and texture; drainage area
and drainage patterns; and the presence of solution-prone carbonate
rocks (limestone);
2. Stormwater management measures shall be designed to minimize maintenance, facilitate maintenance and repairs, and ensure proper functioning. Trash racks shall be installed at the intake to the outlet structure, as appropriate, and shall have parallel bars with one-inch spacing between the bars to the elevation of the water quality design storm. For elevations higher than the water quality design storm, the parallel bars at the outlet structure shall be spaced no greater than 1/3 the width of the diameter of the orifice or 1/3 the width of the weir, with a minimum spacing between bars of one inch and a maximum spacing between bars of six inches. In addition, the design of trash racks must comply with the requirements of Subsection
35-74.8c;
3. Stormwater management measures shall be designed, constructed, and
installed to be strong, durable, and corrosion resistant. Measures
that are consistent with the relevant portions of the residential
site improvement standards at N.J.A.C. 5:21-7.3, 5:21-7.4 and 5:21-7.5
shall be deemed to meet this requirement;
4. Stormwater management BMPs shall be designed to meet the minimum safety standards for stormwater management BMPs at Subsection
35-74.8; and
5. The size of the orifice at the intake to the outlet from the stormwater
management BMP shall be a minimum of 2 1/2 inches in diameter.
j. Manufactured treatment devices may be used to meet the requirements of this subsection, provided the pollutant removal rates are verified by the New Jersey Corporation for Advanced Technology and certified by the Department. Manufactured treatment devices that do not meet the definition of green infrastructure at Subsection
35-74.2 may be used only under the circumstances described at Subsection
35-74.4o4.
k. Any application for a new agricultural development that meets the definition of major development at Subsection
35-74.2 shall be submitted to the Soil Conservation District for review and approval in accordance with the requirements at Subsection
35-74.4o,
p,
q, and
r and any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For purposes of this subsection, "agricultural development" means land uses normally associated with the production of food, fiber, and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacture of agriculturally related products.
l. If there is more than one drainage area, the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at Subsection
35-74.4p,
q and
r shall be met in each drainage area, unless the runoff from the drainage areas converge on-site and no adverse environmental impact would occur as a result of compliance with any one or more of the individual standards being determined utilizing a weighted average of the results achieved for that individual standard across the affected drainage areas.
m. Any stormwater management measure authorized under the municipal stormwater management plan or ordinance shall be reflected in a deed notice recorded in the office of the Ocean County Clerk. A form of deed notice shall be submitted to the municipality for approval prior to filing. The deed notice shall contain a description of the stormwater management measure(s) used to meet the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at Subsection
35-74.4o,
p,
q, and
r and shall identify the location of the stormwater management measure(s) in NAD 1983 State Plane New Jersey FIPS 2900 US Feet or Latitude and Longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to Subsection
35-74.10b5. Prior to the commencement of construction, proof that the above-required deed notice has been filed shall be submitted to the municipality. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the Clerk or other proof of recordation provided by the recording office. However, if the initial proof provided to the municipality is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the municipality within 180 calendar days of the authorization granted by the municipality.
n. A stormwater management measure approved under the municipal stormwater management plan or ordinance may be altered or replaced with the approval of the municipality, if the municipality determines that the proposed alteration or replacement meets the design and performance standards pursuant to Subsection
35-74.4 of this section and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. If an alteration or replacement is approved, a revised deed notice shall be submitted to the municipality for approval and subsequently recorded with the office of the Ocean County Clerk and shall contain a description and location of the stormwater management measure, as well as reference to the maintenance plan, in accordance with Subsection
m above. Prior to the commencement of construction, proof that the above-required deed notice has been filed shall be submitted to the municipality in accordance with Subsection
m above.
o. Green Infrastructure Standards.
1. This subsection specifies the types of green infrastructure BMPs
that may be used to satisfy the groundwater recharge, stormwater runoff
quality, and stormwater runoff quantity standards.
2. To satisfy the groundwater recharge and stormwater runoff quality standards at Subsection
35-74.4p and
q, the design engineer shall utilize green infrastructure BMPs identified in Table 1 at Subsection
35-74.4f and/or an alternative stormwater management measure approved in accordance with Subsection
35-74.4g. The following green infrastructure BMPs are subject to the following maximum contributory drainage area limitations:
Best Management Practice
|
Maximum Contributory Drainage Area
|
---|
Dry well
|
1 acre
|
Manufactured treatment device
|
2.5 acres
|
Pervious pavement systems
|
Area of additional inflow cannot exceed three times the area
occupied by the BMP
|
Small-scale bioretention systems
|
2.5 acres
|
Small-scale infiltration basin
|
2.5 acres
|
Small-scale sand filter
|
2.5 acres
|
3. To satisfy the stormwater runoff quantity standards at Subsection
35-74.4r, the design engineer shall utilize BMPs from Table 1 or from Table 2 and/or an alternative stormwater management measure approved in accordance with Subsection
35-74.4g.
4. If a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with Subsection
35-74.4d is granted from the requirements of this subsection, then BMPs from Table 1, 2, or 3, and/or an alternative stormwater management measure approved in accordance with Subsection
35-74.4g may be used to meet the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at Subsection
35-74.4p,
q and
r.
5. For separate or combined storm sewer improvement projects, such as sewer separation, undertaken by a government agency or public utility (for example, a sewerage company), the requirements of this subsection shall only apply to areas owned in fee simple by the government agency or utility, and areas within a right-of-way or easement held or controlled by the government agency or utility; the entity shall not be required to obtain additional property or property rights to fully satisfy the requirements of this subsection. Regardless of the amount of area of a separate or combined storm sewer improvement project subject to the green infrastructure requirements of this subsection, each project shall fully comply with the applicable groundwater recharge, stormwater runoff quality control, and stormwater runoff quantity standards at Subsection
35-74.4p,
q and
r, unless the project is granted a waiver from strict compliance in accordance with Subsection
35-74.4d.
p. Groundwater Recharge Standards.
1. This subsection contains the minimum design and performance standards
for groundwater recharge as follows:
2. The design engineer shall, using the assumptions and factors for stormwater runoff and groundwater recharge calculations at Subsection
35-74.5, either:
(a)
Demonstrate through hydrologic and hydraulic analysis that the
site and its stormwater management measures maintain 100% of the average
annual preconstruction groundwater recharge volume for the site; or
(b)
Demonstrate through hydrologic and hydraulic analysis that the
increase of stormwater runoff volume from preconstruction to post-construction
for the two-year storm is infiltrated.
3. This groundwater recharge requirement does not apply to projects within the "urban redevelopment area," or to projects subject to Subsection
p4 below.
4. The following types of stormwater shall not be recharged:
(a)
Stormwater from areas of high pollutant loading. High-pollutant-loading
areas are areas in industrial and commercial developments where solvents
and/or petroleum products are loaded/unloaded, stored, or applied,
areas where pesticides are loaded/unloaded or stored; areas where
hazardous materials are expected to be present in greater than "reportable
quantities" as defined by the United States Environmental Protection
Agency (EPA) at 40 CFR 302.4; areas where recharge would be inconsistent
with Department-approved remedial action work plan or landfill closure
plan and areas with high risks for spills of toxic materials, such
as gas stations and vehicle maintenance facilities; and
(b)
Industrial stormwater exposed to source material. "Source material"
means any material(s) or machinery, located at an industrial facility,
that is directly or indirectly related to process, manufacturing or
other industrial activities, which could be a source of pollutants
in any industrial stormwater discharge to groundwater. Source materials
include, but are not limited to, raw materials; intermediate products;
final products; waste materials; by-products; industrial machinery
and fuels, and lubricants, solvents, and detergents that are related
to process, manufacturing, or other industrial activities that are
exposed to stormwater.
q. Stormwater Runoff Quality Standards.
1. This subsection contains the minimum design and performance standards
to control stormwater runoff quality impacts of major development.
Stormwater runoff quality standards are applicable when the major
development results in an increase of 1/4 acre or more of regulated
motor vehicle surface.
2. Stormwater management measures shall be designed to reduce the post-construction
load of total suspended solids (TSS) in stormwater runoff generated
from the water quality design storm as follows:
(a)
80% TSS removal of the anticipated load, expressed as an annual
average, shall be achieved for the stormwater runoff from the net
increase of motor vehicle surface.
(b)
If the surface is considered regulated motor vehicle surface
because the water quality treatment for an area of motor vehicle surface
that is currently receiving water quality treatment either by vegetation
or soil, by an existing stormwater management measure, or by treatment
at a wastewater treatment plant is to be modified or removed, the
project shall maintain or increase the existing TSS removal of the
anticipated load expressed as an annual average.
3. The requirement to reduce TSS does not apply to any stormwater runoff in a discharge regulated under a numeric effluent limitation for TSS imposed under the New Jersey Pollutant Discharge Elimination System (NJPDES) rules, N.J.A.C. 7:14A, or in a discharge specifically exempt under an NJPDES permit from this requirement. Every major development, including any that discharge into a combined sewer system, shall comply with Subsection
q2, above, unless the major development is itself subject to an NJPDES permit with a numeric effluent limitation for TSS or the NJPDES permit to which the major development is subject exempts the development from a numeric effluent limitation for TSS.
4. The water quality design storm is 1.25 inches of rainfall in two
hours. Water quality calculations shall take into account the distribution
of rain from the water quality design storm, as reflected in Table
4, below. The calculation of the volume of runoff may take into account
the implementation of stormwater management measures.
Table 4 - Water Quality Design Storm Distribution
|
---|
Time
(Minutes)
|
Cumulative Rainfall
(Inches)
|
Time
(Minutes)
|
Cumulative Rainfall
(Inches)
|
Time
(Minutes)
|
Cumulative Rainfall
(Inches)
|
---|
1
|
0.00166
|
41
|
0.1728
|
81
|
1.0906
|
2
|
0.00332
|
42
|
0.1796
|
82
|
1.0972
|
3
|
0.00498
|
43
|
0.1864
|
83
|
1.1038
|
4
|
0.00664
|
44
|
0.1932
|
84
|
1.1104
|
5
|
0.00830
|
45
|
0.2000
|
85
|
1.1170
|
6
|
0.00996
|
46
|
0.2117
|
86
|
1.1236
|
7
|
0.01162
|
47
|
0.2233
|
87
|
1.1302
|
8
|
0.01328
|
48
|
0.2350
|
88
|
1.1368
|
9
|
0.01494
|
49
|
0.2466
|
89
|
1.1434
|
10
|
0.01660
|
50
|
0.2583
|
90
|
1.1500
|
11
|
0.01828
|
51
|
0.2783
|
91
|
1.1550
|
12
|
0.01996
|
52
|
0.2983
|
92
|
1.1600
|
13
|
0.02164
|
53
|
0.3183
|
93
|
1.1650
|
14
|
0.02332
|
54
|
0.3383
|
94
|
1.1700
|
15
|
0.02500
|
55
|
0.3583
|
95
|
1.1750
|
16
|
0.03000
|
56
|
0.4116
|
96
|
1.1800
|
17
|
0.03500
|
57
|
0.4650
|
97
|
1.1850
|
18
|
0.04000
|
58
|
0.5183
|
98
|
1.1900
|
19
|
0.04500
|
59
|
0.5717
|
99
|
1.1950
|
20
|
0.05000
|
60
|
0.6250
|
100
|
1.2000
|
21
|
0.05500
|
61
|
0.6783
|
101
|
1.2050
|
22
|
0.06000
|
62
|
0.7317
|
102
|
1.2100
|
23
|
0.06500
|
63
|
0.7850
|
103
|
1.2150
|
24
|
0.07000
|
64
|
0.8384
|
104
|
1.2200
|
25
|
0.07500
|
65
|
0.8917
|
105
|
1.2250
|
26
|
0.08000
|
66
|
0.9117
|
106
|
1.2267
|
27
|
0.08500
|
67
|
0.9317
|
107
|
1.2284
|
28
|
0.09000
|
68
|
0.9517
|
108
|
1.2300
|
29
|
0.09500
|
69
|
0.9717
|
109
|
1.2317
|
30
|
0.10000
|
70
|
0.9917
|
110
|
1.2334
|
31
|
0.10660
|
71
|
1.0034
|
111
|
1.2351
|
32
|
0.11320
|
72
|
1.0150
|
112
|
1.2367
|
33
|
0.11980
|
73
|
1.0267
|
113
|
1.2384
|
34
|
0.12640
|
74
|
1.0383
|
114
|
1.2400
|
35
|
0.13300
|
75
|
1.0500
|
115
|
1.2417
|
36
|
0.13960
|
76
|
1.0568
|
116
|
1.2434
|
37
|
0.14620
|
77
|
1.0636
|
117
|
1.2450
|
38
|
0.15280
|
78
|
1.0704
|
118
|
1.2467
|
39
|
0.15940
|
79
|
1.0772
|
119
|
1.2483
|
40
|
0.16600
|
80
|
1.0840
|
120
|
1.2500
|
5. If more than one BMP in series is necessary to achieve the required
80% TSS reduction for a site, the applicant shall utilize the following
formula to calculate TSS reduction:
Where:
|
R
|
=
|
Total TSS percent load removal from application of both BMPs
|
A
|
=
|
The TSS percent removal rate applicable to the first BMP
|
B
|
=
|
The TSS percent removal rate applicable to the second BMP
|
6. Stormwater management measures shall also be designed to reduce, to the maximum extent feasible, the post-construction nutrient load of the anticipated load from the developed site in stormwater runoff generated from the water quality design storm. In achieving reduction of nutrients to the maximum extent feasible, the design of the site shall include green infrastructure BMPs that optimize nutrient removal while still achieving the performance standards in Subsection
35-74.4p,
q and
r.
7. In accordance with the definition of FW1 at N.J.A.C. 7:9B-1.4, stormwater
management measures shall be designed to prevent any increase in stormwater
runoff to waters classified as FW1.
8. The Flood Hazard Area Control Act Rules at N.J.A.C. 7:13-4.1(c)1
establish 300-foot riparian zones along Category One waters, as designated
in the Surface Water Quality Standards at N.J.A.C. 7:9B, and certain
upstream tributaries to Category One waters. A person shall not undertake
a major development that is located within or discharges into a 300-foot
riparian zone without prior authorization from the Department under
N.J.A.C. 7:13.
9. Pursuant to the Flood Hazard Area Control Act Rules at N.J.A.C. 7:13-11.2(j)3.i,
runoff from the water quality design storm that is discharged within
a 300-foot riparian zone shall be treated in accordance with this
subsection to reduce the post-construction load of total suspended
solids by 95% of the anticipated load from the developed site, expressed
as an annual average.
10. These stormwater runoff quality standards do not apply to the construction
of one individual single-family dwelling, provided that it is not
part of a larger development or subdivision that has received preliminary
or final site plan approval prior to December 3, 2018, and that the
motor vehicle surfaces are made of permeable material(s) such as gravel,
dirt, and/or shells.
r. Stormwater Runoff Quantity Standards.
1. This subsection contains the minimum design and performance standards
to control stormwater runoff quantity impacts of major development.
2. In order to control stormwater runoff quantity impacts, the design engineer shall, using the assumptions and factors for stormwater runoff calculations at Subsection
35-74.5, complete one of the following:
(a)
Demonstrate through hydrologic and hydraulic analysis that for
stormwater leaving the site, post-construction runoff hydrographs
for the two-, ten-, and 100-year storm events do not exceed, at any
point in time, the preconstruction runoff hydrographs for the same
storm events;
(b)
Demonstrate through hydrologic and hydraulic analysis that there
is no increase, as compared to the preconstruction condition, in the
peak runoff rates of stormwater leaving the site for the two-, ten-
and 100-year storm events and that the increased volume or change
in timing of stormwater runoff will not increase flood damage at or
downstream of the site. This analysis shall include the analysis of
impacts of existing land uses and projected land uses assuming full
development under existing zoning and land use ordinances in the drainage
area;
(c)
Design stormwater management measures so that the post-construction
peak runoff rates for the two-, ten- and 100-year storm events are
50%, 75% and 80%, respectively, of the preconstruction peak runoff
rates. The percentages apply only to the post-construction stormwater
runoff that is attributable to the portion of the site on which the
proposed development or project is to be constructed; or
(d)
In tidal flood hazard areas, stormwater runoff quantity analysis in accordance with Subsection
r2(a),
(b) and
(c) above is required unless the design engineer demonstrates through hydrologic and hydraulic analysis that the increased volume, change in timing, or increased rate of the stormwater runoff, or any combination of the three will not result in additional flood damage below the point of discharge of the major development. No analysis is required if the stormwater is discharged directly into any ocean, bay, inlet, or the reach of any watercourse between its confluence with an ocean, bay, or inlet and downstream of the first water-control structure.
3. The stormwater runoff quantity standards shall be applied at the
site's boundary to each abutting lot, roadway, watercourse, or receiving
storm sewer system.
a. Stormwater runoff shall be calculated in accordance with the following:
1. The design engineer shall calculate runoff using one of the following
methods:
(a)
The USDA Natural Resources Conservation Service (NRCS) methodology, including the NRCS Runoff Equation and Dimensionless Unit Hydrograph, as described in Chapters
7,
9,
10,
15, 16, Part 630, Hydrology National Engineering Handbook, incorporated herein by reference as amended and supplemented. This methodology is additionally described in Technical Release 55 - Urban Hydrology for Small Watersheds (TR-55), dated June 1986, incorporated herein by reference as amended and supplemented. Information regarding the methodology is available at https://www.nrcs.usda.gov/Internet/FSE DOCUMENTS/stelprdb1044171.pdf or at United States Department of Agriculture Natural Resources Conservation Service, 220 Davison Avenue, Somerset, New Jersey 08873; or
(b)
The Rational Method for peak flow and the Modified Rational
Method for hydrograph computations. The Rational and Modified Rational
Methods are described in "Appendix A-9 Modified Rational Method" in
the Standards for Soil Erosion and Sediment Control in New Jersey,
January 2014. This document is available from the State Soil Conservation
Committee or any of the Soil Conservation Districts listed at N.J.A.C.
2:90-1.3(a)3. The location, address, and telephone number for each
Soil Conservation District is available from the State Soil Conservation
Committee, PO Box 330, Trenton, New Jersey 08625. The document is
also available at http://www.nj.gov/agriculture/divisions/anr/pdf/2014NJSoilErosionContr
olStandardsComplete.pdf.
2. For the purpose of calculating runoff coefficients and groundwater recharge, there is a presumption that the preconstruction condition of a site or portion thereof is a wooded land use with good hydrologic condition. The term "runoff coefficient" applies to both the NRCS methodology at Subsection
35-74.5a1(a) and the Rational and Modified Rational Methods at Subsection
35-74.5a1(b). A runoff coefficient or a groundwater recharge land cover for an existing condition may be used on all or a portion of the site if the design engineer verifies that the hydrologic condition has existed on the site or portion of the site for at least five years without interruption prior to the time of application. If more than one land cover has existed on the site during the five years immediately prior to the time of application, the land cover with the lowest runoff potential shall be used for the computations. In addition, there is the presumption that the site is in good hydrologic condition (if the land use type is pasture, lawn, or park), with good cover (if the land use type is woods), or with good hydrologic condition and conservation treatment (if the land use type is cultivation).
3. In computing preconstruction stormwater runoff, the design engineer
shall account for all significant land features and structures, such
as ponds, wetlands, depressions, hedgerows, or culverts, that may
reduce preconstruction stormwater runoff rates and volumes.
4. In computing stormwater runoff from all design storms, the design
engineer shall consider the relative stormwater runoff rates and/or
volumes of pervious and impervious surfaces separately to accurately
compute the rates and volume of stormwater runoff from the site. To
calculate runoff from unconnected impervious cover, urban impervious
area modifications as described in the NRCS Technical Release 55 —
Urban Hydrology for Small Watersheds, and other methods may be employed.
5. If the invert of the outlet structure of a stormwater management
measure is below the flood hazard design flood elevation as defined
at N.J.A.C. 7:13, the design engineer shall take into account the
effects of tailwater in the design of structural stormwater management
measures.
b. Groundwater recharge may be calculated in accordance with the following:
1. The New Jersey Geological Survey Report GSR-32 A Method for Evaluating
Ground-Water Recharge Areas in New Jersey, incorporated herein by
reference, as amended and supplemented. Information regarding the
methodology is available from the New Jersey Stormwater Best Management
Practices Manual; at the New Jersey Geological Survey website at https:www.nj.gov/dep/njgs/pricelst/gsreport/gsr32.pdf
or at New Jersey Geological and Water Survey, 29 Arctic Parkway, P.O.
Box 427, Trenton, New Jersey, 08625-0420; (609) 984-6587.
a. Technical guidance for stormwater management measures can be found
in the documents listed below, which are available to download from
the Department's website at http://www.nj.gov/dep/stormwater/bmp manual2.htm.
1. Guidelines for stormwater management measures are contained in the
New Jersey Stormwater Best Management Practices Manual, as amended
and supplemented. Information is provided on stormwater management
measures such as, but not limited to, those listed in Tables 1, 2
and 3.
2. Additional maintenance guidance is available on the Department's
website at https://www.njstormwater.org/maintenance guidance.htm.
b. Submissions required for review by the Department should be mailed
to The Division of Water Quality, New Jersey Department of Environmental
Protection, Mail Code 401-02B, PO Box 420, Trenton, New Jersey 08625-0420.
a. Site design features identified under Subsection
35-74.4f above or alternative designs in accordance with Subsection
35-74.4g above, to prevent discharge of trash and debris from drainage systems, shall comply with the following standard to control passage of solid and floatable materials through storm drain inlets. For purposes of this paragraph, "solid and floatable materials" means sediment, debris, trash, and other floating, suspended, settleable solids. For exemptions to this standard see Subsection
35-74.7a2 below.
1. Design engineers shall use one of the following grates whenever they
use a grate in pavement or another ground surface to collect stormwater
from that surface into a storm drain or surface water body under that
grate:
(a)
The New Jersey Department of Transportation (NJDOT) bicycle-safe
grate, which is described in Chapter 2.4 of the NJDOT Bicycle Compatible
Roadways and Bikeways Planning and Design Guidelines; or
(b)
A different grate, if each individual clear space in that grate
has an area of no more than 7.0 square inches, or is no greater than
0.5 inch across the smallest dimension.
(1)
Examples of grates subject to this standard include grates in
grate inlets, the grate portion (non-curbing portion) of combination
inlets, grates on storm sewer manholes, ditch grates, trench grates,
and grates of spacer bars in slotted drains. Examples of ground surfaces
include surfaces of roads (including bridges), driveways, parking
areas, bikeways, plazas, sidewalks, lawns, fields, open channels,
and stormwater system floors used to collect stormwater from the surface
into a storm drain or surface water body.
(c)
For curb-opening inlets, including curb-opening inlets in combination
inlets, the clear space in that curb opening, or each individual clear
space if the curb opening has two or more clear spaces, shall have
an area of no more than 7.0 square inches, or be no greater than 2.0
inches across the smallest dimension.
2. The standard in Subsection
35-74.7a1 above does not apply:
(a)
Where each individual clear space in the curb opening in existing
curb-opening inlet does not have an area of more than 9.0 square inches;
(b)
Where the municipality agrees that the standards would cause
inadequate hydraulic performance that could not practicably be overcome
by using additional or larger storm drain inlets;
(c)
Where flows from the water quality design storm as specified
in N.J.A.C. 7:8 are conveyed through any device (e.g., end-of-pipe
netting facility, manufactured treatment device, or a catch basin
hood) that is designed at a minimum, to prevent delivery of all solid
and floatable materials that could not pass through one of the following:
(1)
A rectangular space 4 5/8 inches long and 1 1/2 inches
wide (this option does not apply for outfall netting facilities);
or
(2)
A bar screen having a bar spacing of 1/2 inch.
Note that these exemptions do not authorize any infringement
of requirements in the residential site improvement standards for
bicycle-safe grates in new residential development [N.J.A.C. 5:21-4.18(b)2
and 7.4(b)1].
(d)
Where flows are conveyed through a trash rack that has parallel
bars with one-inch spacing between the bars, to the elevation of the
water quality design storm as specified in N.J.A.C. 7:8; or
(e)
Where the New Jersey Department of Environmental Protection
determines, pursuant to the New Jersey Register of Historic Places
Rules at N.J.A.C. 7:4-7.2(c), that action to meet this standard is
an undertaking that constitutes an encroachment or will damage or
destroy the New Jersey Register-listed historic property.
a. This subsection sets forth requirements to protect public safety
through the proper design and operation of stormwater management BMPs.
This subsection applies to any new stormwater management BMPs.
b. The provisions of this subsection are not intended to preempt more-stringent municipal or county safety requirements for new or existing stormwater management BMPs. Municipal and county stormwater management plans and ordinances may, pursuant to their authority, require existing stormwater management BMPs to be retrofitted to meet one or more of the safety standards in Subsection
35-74.8c1,
2 and
3 for trash racks, overflow grates, and escape provisions at outlet structures.
c. Requirements for Trash Racks, Overflow Grates and Escape Provisions.
1. A trash rack is a device designed to catch trash and debris and prevent
the clogging of outlet structures. Trash racks shall be installed
at the intake to the outlet from the stormwater management BMP to
ensure proper functioning of the BMP outlets in accordance with the
following:
(a)
The trash rack shall have parallel bars, with no greater than
six-inch spacing between the bars.
(b)
The trash rack shall be designed so as not to adversely affect
the hydraulic performance of the outlet pipe or structure.
(c)
The average velocity of flow through a clean trash rack is not
to exceed 2.5 feet per second under the full range of stage and discharge.
Velocity is to be computed on the basis of the net area of opening
through the rack.
(d)
The trash rack shall be constructed and installed to be rigid,
durable, and corrosion resistant, and shall be designed to withstand
a perpendicular live loading of 300 pounds per square foot.
2. An overflow grate is designed to prevent obstruction of the overflow
structure. If an outlet structure has an overflow grate, such grate
shall meet the following requirements:
(a)
The overflow grate shall be secured to the outlet structure
but removable for emergencies and maintenance.
(b)
The overflow grate spacing shall be no less than two inches
across the smallest dimension.
(c)
The overflow grate shall be constructed and installed to be
rigid, durable, and corrosion resistant, and shall be be designed
to withstand a perpendicular live loading of 300 pounds per square
foot.
3. Stormwater management BMPs shall include escape provisions as follows:
(a)
If a stormwater management BMP has an outlet structure, escape provisions shall be incorporated in or on the structure. Escape provisions include the installation of permanent ladders, steps, rungs, or other features that provide easily accessible means of egress from stormwater management BMPs. With the prior approval of the reviewing agency identified in Subsection
35-74.8d,
a freestanding outlet structure may be exempted from this requirement.
(b)
Safety ledges shall be constructed on the slopes of all new stormwater management BMPs having a permanent pool of water deeper than 2 1/2 feet. Such safety ledges shall be comprised of two steps. Each step shall be four feet to six feet in width. One step shall be located approximately 2 1/2 feet below the permanent water surface, and the second step shall be located one foot to 1 1/2 feet above the permanent water surface. See Subsection
35-74.8e for an illustration of safety ledges in a stormwater management basin.
(c)
In new stormwater management BMPs, the maximum interior slope
for an earthen dam, embankment, or berm shall not be steeper than
three horizontal to one vertical.
d. Variance or Exemption from Safety Standards.
1. A variance or exemption from the safety standards for stormwater
management basins may be granted only upon a written finding by the
appropriate reviewing agency (municipality, county or Department)
that the variance or exemption will not constitute a threat to public
safety.
e. Safety Ledge Illustration:
a. Submission of Site Development Stormwater Plan.
1. Whenever an applicant seeks municipal approval of a development subject to this subsection, the applicant shall submit all of the required components of the checklist for the site development stormwater plan at Subsection
35-74.9c below as part of the submission of the applicant's application for subdivision or site plan approval. In addition, the applicant shall refer to the Revised General Ordinances of the Township of Berkeley, Chapter
35, Article
XVII, Checklists, for additional submission requirements for subdivision or site plan approval.
2. The applicant shall demonstrate that the project meets the standards
set forth in this subsection.
3. The applicant shall submit 12 copies of the materials listed in the checklist for site development stormwater plans in accordance with Subsection
35-74.9c of this section.
b. Site Development Stormwater Plan Approval. The applicant's site development
project shall be reviewed as a part of the subdivision or site plan
review process by the municipal board or official from which municipal
approval is sought. That municipal board or official shall consult
the review engineer retained by the Planning and/or Zoning Board (as
appropriate) to determine if all of the checklist requirements have
been satisfied and to determine if the project meets the standards
set forth in this subsection.
c. Checklist Requirements. The following information shall be required:
1. Topographic Base Map. The reviewing engineer may require upstream
tributary drainage system information as necessary. It is recommended
that the topographic base map of the site be submitted which extends
a minimum of 200 feet beyond the limits of the proposed development,
at a scale of one inch equals 200 feet or greater, showing two-foot
contour intervals. The map as appropriate may indicate the following:
existing surface water drainage, shorelines, steep slopes, soils,
erodible soils, perennial or intermittent streams that drain into
or upstream of the Category One waters, wetlands and floodplains along
with their appropriate buffer strips, marshlands and other wetlands,
pervious or vegetative surfaces, existing man-made structures, roads,
bearing and distances of property lines, and significant natural and
man-made features not otherwise shown.
2. Environmental Site Assessment and Environmental Impact Statement.
A written and graphic description of the natural and man-made features
of the site and its surroundings should be submitted. This description
should include a discussion of soil conditions, slopes, wetlands,
waterways and vegetation on the site. Particular attention should
be given to unique, unusual, or environmentally sensitive features
and to those that provide particular opportunities or constraints
for development.
Refer to the Revised General Ordinances of the Township of Berkeley, Chapter
35, Article
X, §
35-56, for other requirements of the environmental impact statement.
3. Project Description and Site Plan(s). A map (or maps) at the scale
of the topographical base map indicating the location of existing
and proposed buildings, roads, parking areas, utilities, structural
facilities for stormwater management and sediment control, and other
permanent structures. The map(s) shall also clearly show areas where
alterations occur in the natural terrain and cover, including lawns
and other landscaping, and seasonal high-groundwater elevations. A
written description of the site plan and justification of proposed
changes in natural conditions shall also be provided.
Additional requirements are listed in the Revised General Ordinances of the Township of Berkeley, Chapter
35, Article
VIII, Development Applications.
4. Land Use Planning and Source Control Plan. This plan shall provide a demonstration of how the goals and standards of Subsection
35-74.3 through
35-74.5 are being met. The focus of this plan shall be to describe how the site is being developed to meet the objective of controlling groundwater recharge, stormwater quality and stormwater quantity problems at the source by land management and source controls whenever possible.
5. Stormwater Management Facilities Map. The following information,
illustrated on a map of the same scale as the topographic base map,
shall be included:
(a)
Total area to be disturbed, paved or built upon, proposed surface
contours, land area to be occupied by the stormwater management facilities
and the type of vegetation thereon, and details of the proposed plan
to control and dispose of stormwater.
(b)
Details of all stormwater management facility designs, during
and after construction, including discharge provisions, discharge
capacity for each outlet at different levels of detention and emergency
spillway provisions with maximum discharge capacity of each spillway.
6. Calculations.
(a)
Comprehensive hydrologic and hydraulic design calculations for the pre-development and post-development conditions for the design storms specified in Subsection
35-74.4 of this section.
(b)
When the proposed stormwater management control measures depend
on the hydrologic properties of soils or require certain separation
from the seasonal high-water table, then a soils report shall be submitted.
The soils report shall be based on on-site boring logs or soil pit
profiles. The number and location of required soil borings or soil
pits shall be determined based on what is needed to determine the
suitability and distribution of soils present at the location of the
control measure.
7. Maintenance and Repair Plan. The design and planning of the stormwater management facility shall meet the maintenance requirements of Subsection
35-74.10.
8. Waiver from Submission Requirements. The municipal official or board reviewing an application under this section may, in consultation with the municipal engineer, waive submission of any of the requirements in Subsection
35-74.9c1 through
6 of this section when it can be demonstrated that the information requested is impossible to obtain or it would create a hardship on the applicant to obtain and its absence will not materially affect the review process.
9. Stormwater Review Fee. In addition to the development review fees listed in the Revised General Ordinances of the Township of Berkeley, §
35-8, subdivisions and site plans requiring preliminary or final approval, and road improvement plans, that all meet the latest definition of "major development" per N.J.A.C. 7:8-1.2, shall pay the following additional nonrefundable fee to the Township of Berkeley by cash, check or bank money order:
(a)
Subdivision Fees.
(1)
Preliminary Approval, Major Subdivision.
Number of Lots
|
Fee
|
---|
0 to 10
|
$1,500
|
11 to 24
|
$1,500 + $50 per lot
|
25 to 100
|
$2,500 + $25 per lot
|
101+
|
$3,500 + $15 per lot
|
(2)
Final Approval, Major Subdivision: 1/2 of the preliminary major
subdivision stormwater review fee, with a minimum fee of $1,500 for
each submission.
(3)
Minor subdivisions: $1,000.
(b)
Site Plan Fee Schedule.
(1)
Preliminary Site Plan Application.
(i) New nonresidential development, including any alterations;
additions or changes of use:
Acreage
|
Fee
|
---|
Up to 2 acres
|
$2,000
|
Over 2.0 acres
|
$2,000 + $250 per acre or portion thereof for each additional
acre
|
(ii) Public, quasi-public and nonprofit institutions
and agencies not subject to approval of other governmental agencies,
churches and other similar uses:
Acreage
|
Fee
|
---|
Up to 2 acres
|
$500
|
Over 2.0 acres
|
$1,000
|
(iii) Residential dwelling units, such as multifamily
development and condominium development: $100 per dwelling unit; minimum
fee of $1,500.
(2)
Final Site Plan Application.
(i) New Construction.
Acreage
|
Fee
|
---|
Up to 2 acres
|
$1,000
|
Over 2.0 acres
|
$1,000 + $125 per acre or portion thereof for each additional
acre
|
(ii) Public and quasi-public.
Acreage
|
Fee
|
---|
Up to 2 acres
|
$250
|
Over 2.0 acres
|
$500 + $125 per acre or portion thereof for each additional
acre
|
(iii) Residential dwelling units: $75 per unit; minimum
fee of $1,500.
(3)
Minor Site Plan Application.
(i) All uses and construction: $1,000.
The above checklist is to be in addition to the submission requirements listed in the Revised General Ordinances of the Township of Berkeley, Chapter
35, Article
XVII, and plat requirements listed in Chapter
35, Article
VIII.
a. Applicability.
1. Projects subject to review as in Subsection
35-74.10c of this section shall comply with the requirements of Subsection
35-74.10b and
c. In addition, refer to Revised General Ordinances of the Township of Berkeley, Chapter
35, Article
X, Design Standards, for additional maintenance provisions.
b. General Maintenance.
1. The design engineer shall prepare a maintenance plan for the stormwater
management measures incorporated into the design of a major development.
2. The maintenance plan shall contain specific preventative maintenance tasks and schedules; cost estimates, including estimated cost of sediment, debris, or trash removal; and the name, address, and telephone number of the person or persons responsible for preventative and corrective maintenance (including replacement). The plan shall contain information on BMP location, design, ownership, maintenance tasks and frequencies, and other details as specified in Chapter
8 of the New Jersey BMP Manual, as well as the tasks specific to the type of BMP, as described in the applicable chapter containing design specifics.
3. If the maintenance plan identifies a person other than the property
owner (for example, a developer, a public agency or homeowners' association)
as having the responsibility for maintenance, the plan shall include
documentation of such person's or entity's agreement to assume this
responsibility, or of the owner's obligation to dedicate a stormwater
management facility to such person under an applicable ordinance or
regulation.
4. Responsibility for maintenance shall not be assigned or transferred
to the owner or tenant of an individual property in a residential
development or project, unless such owner or tenant owns or leases
the entire residential development or project. The individual property
owner may be assigned incidental tasks, such as weeding of a green
infrastructure BMP, provided the individual agrees to assume these
tasks; however, the individual cannot be legally responsible for all
of the maintenance required.
5. If the person responsible for maintenance identified under Subsection
35-74.10b3 above is not a public agency, the maintenance plan and any future revisions based on Subsection
35-74.10b7 below shall be recorded upon the deed of record for each property on which the maintenance described in the maintenance plan must be undertaken.
6. Preventative and corrective maintenance shall be performed to maintain
the functional parameters (storage volume, infiltration rates, inflow/outflow
capacity, etc.) of the stormwater management measure, including, but
not limited to, repairs or replacement to the structure; removal of
sediment, debris, or trash; restoration of eroded areas; snow and
ice removal; fence repair or replacement; restoration of vegetation;
and repair or replacement of nonvegetated linings.
7. The person responsible for maintenance identified under Subsection
35-74.10b3 above shall perform all of the following requirements:
(a)
Maintain a detailed log of all preventative and corrective maintenance
for the structural stormwater management measures incorporated into
the design of the development, including a record of all inspections
and copies of all maintenance-related work orders.
(b)
Evaluate the effectiveness of the maintenance plan at least
once per year and adjust the plan and the deed as needed; and
(c)
Retain and make available, upon request by any public entity with administrative, health, environmental, or safety authority over the site, the maintenance plan and the documentation required by Subsection
35-74.10b6 and
7 above.
8. The requirements of Subsection
35-74.10b3 and
4 do not apply to stormwater management facilities that are dedicated to and accepted by the municipality or another governmental agency, subject to all applicable municipal stormwater general permit conditions, as issued by the Department.
9. In the event that the stormwater management facility becomes a danger
to public safety or public health, or if it is in need of maintenance
or repair, the municipality shall so notify the responsible person
in writing. Upon receipt of that notice, the responsible person shall
have 14 days to effect maintenance and repair of the facility in a
manner that is approved by the Municipal Engineer or his designee.
The municipality, in its discretion, may extend the time allowed for
effecting maintenance and repair for good cause. If the responsible
person fails or refuses to perform such maintenance and repair, the
municipality or county may immediately proceed to do so and shall
bill the cost thereof to the responsible person. Nonpayment of such
bill may result in a lien on the property.
c. Nothing in this section shall preclude the municipality in which
the major development is located from requiring the posting of a performance
or maintenance guarantee in accordance with N.J.S.A. 40:55D-53.
Any person(s) who erects, constructs, alters, repairs, converts, maintains, or uses any building, structure or land in violation of this section shall, upon conviction, be liable to the penalty(ies) stated in Chapter
1, §
1-5, of the Revised General Ordinances of the Township of Berkeley.
This section shall take effect immediately upon the approval
by the county review agency and 20 days after its passage by the Township
Council and approval by the Mayor, where such approval is required
by law.
All ordinances or resolutions or parts of ordinances or resolutions
inconsistent herewith are hereby repealed to the extent of such inconsistency.
If the provisions of any section, subsection, sentence, paragraph,
subdivision, or clause and phrase of this section is declared to be
an independent section, subsection, sentence, paragraph, subdivision,
or clause and phase, and the finding or holding of any such portion
of this section is judged to be unconstitutional, void, or ineffective
for any cause or reason by a court of competent jurisdiction, such
order of judgment shall not affect or invalidate the remainder of
any other portion of this section.
[Ord. No. 94-29 § 118-14.31; Ord. No. 98-40 § 1]
a. Street lights shall be of a type approved by the Township of Berkeley
and GPU Energy. They shall be located to provide the minimum average
maintained levels of illumination as recommended by the Illuminating
Engineering Society of North America for each specific application.
The developer shall pay the full cost for initial installation of
any street lights. After final acceptance, operation and maintenance
costs shall be the responsibility of the Township.
b. Street lights shall be installed in accordance with GPU Energy and
Berkeley Township standards and requirements. The Developer shall
be responsible for payment of all costs associated with the initial
installation of street lights as determined by GPU Energy's Contributory
Street Lighting Program.
c. All street lights shall be installed with underground wiring. They
shall be of a style and design compatible with the nature and design
of the development and shall be approved by the Board.
[Ord. No. 94-29 § 118-14.32]
a. Street signs shall be made of extruded aluminum and of a size, color
and quality to be approved, in writing, by the Berkeley Township Road
Department prior to installation. They shall be erected on steel posts
with stabilizing pins and set in Class C concrete in a workmanlike
manner. At street intersections, one post shall carry two signs at
right angles to denote the name of each street. Posts shall be 10
feet overall, with three feet in the ground, surrounded with concrete.
b. All traffic signals shall conform to standards required by the State
Department of Transportation, as well as to any additional requirements
imposed by the Chief of the Traffic Safety Bureau and the Township
Engineer that are not inconsistent with the requirements imposed by
the State Department of Transportation. The foregoing shall be a bondable
item.
c. The developer shall, prior to final acceptance, install all traffic
control devices required within any development. Traffic control devices
shall include but are not limited to signs, traffic lines, lights,
reflectors and channelizing markers. The number, type, legend, placement
and size of all traffic control devices shall be in accordance with
the Manual on Uniform Traffic Control Devices by the United States
Department of Transportation and the requirements of municipal, County
and State regulations and shall be according to an approved plan submitted
at the time of final plat approval. Construction details of all proposed
traffic control devices shall be in accordance with standards prepared
by the Township Engineer and approved by the Township Committee.
d. At least one of the corners of each intersection of streets, roads,
avenues or other highways in each development shall be marked by a
new 50 grade metal street sign, properly lettered to indicate the
highways at the intersection. Each of the signs shall be furnished
and erected by the developer. Each of the signs shall be erected on
a substantial metal signpost furnished by the developer and erected
in a manner and location approved by the Township Engineer. The type,
quality and size of the signs and signposts shall be comparable to
those in common use in and by the municipality.
[Ord. No. 94-29 § 118-14.33]
All utility lines and necessary appurtenances, including but
not limited to electric transmission and electric, gas and water distribution,
communications, streetlighting and cable television, shall be installed
underground within easements or dedicated public rights-of-way. The
developer shall arrange with the serving utility for the underground
installation of the utility's supply lines and service connections
in accordance with the provisions of the applicable standard terms
and conditions of its tariff, as the same are then on file with the
State of New Jersey Board of Public Utility Commissioners, and shall
submit to the Planning Board, prior to the granting of approval, a
written instrument from each serving utility which shall evidence
full compliance with the provisions of this section; provided, however,
that lots which abut existing easements or public rights-of-way where
overhead utility lines have theretofore been installed may be supplied
with service from such overhead lines if no new utility poles are
required. In any event, new building service connections for all multifamily
developments, shopping centers, industrial parks and planned retirement
communities, and for any industrial, commercial or office development
containing a floor area of 10,000 square feet or more, shall be installed
underground. All other new building service connections shall also
be installed underground unless specific waiver is granted by the
Board. Wherever the utility is not installed in the public right-of-way,
an appropriate utility easement shall be provided in accordance with
the requirements of the respective utility authority.
[Ord. No. 94-29 § 118-14.34]
a. The design, construction and approval of all public and individual
water supply systems, or extensions of existing systems, shall be
under the jurisdiction of the owner of the utility, the Berkeley M.U.A.
or Township Board of Health (and the State of New Jersey), respectively.
Prior to the approval of any final plat, the full approval of any
public water system must have been obtained from the appropriate agency
and filed with the Board, or the final approval will be conditioned
upon full approval from the appropriate agency.
[Ord. No. 94-29 § 118-14.35]
a. Where on-site grading plans of a proposed development are required,
such plan shall show existing contours and proposed finished-surface
elevations for the grading of all lots in the development. Elevations
shall be indicated at all lot corners and intermedial points as required
to adequately provide for the surface water runoff to the streets
or storm sewer inlets. Where necessary, off-site storm sewers shall
be provided.
b. Lot grading shall be in compliance with Subsection
11-1.5 of the Code of the Township of Berkeley.
c. Applications for individual building permits for new construction shall meet the submission requirements and shall comply with Chapter
11 entitled, Buildings, of the Code of the Township of Berkeley.
[Ord. No. 94-29 § 118-14.36]
All applications by developers for municipal acceptance of streets
shall be accompanied by a plan showing as-built surface elevations,
prepared and certified to by a licensed professional engineer or land
surveyor. This plan shall indicate existing finished-surface elevations
at all lot corners, house corners and all other locations necessary
to show that surface water will run off without causing flooding of
the land or buildings and that positive surface drainage is provided
away from all buildings constructed within the development.