Inadequate management of accelerated stormwater runoff resulting from development throughout a watershed increases flood flows and velocities, contributes to erosion and sedimentation, overtaxes the carrying capacity of existing streams and storm sewers, greatly increases the cost of public facilities to convey and manage stormwater, undermines floodplain management and flood reduction efforts in upstream and downstream communities, reduces groundwater recharge, and threatens public health and safety.
B. 
A comprehensive program of stormwater management, including reasonable regulation of development and activities causing accelerated erosion, is fundamental to the public health, safety, welfare, and the protection of the people of the Township and all the people of the commonwealth, their resources, and the environment.
C. 
Stormwater is an important water resource, which provides groundwater recharge for water supplies and base flow of streams, which also protects and maintains surface water quality.
D. 
Federal and state regulations require certain municipalities to implement a program of stormwater controls. These municipalities are required to obtain a permit for stormwater discharges from their separate storm sewer systems under the National Pollutant Discharge Elimination System (NPDES).
E. 
Public education on the control of pollution from stormwater is an essential component in successfully addressing stormwater issues.
F. 
Nonstormwater discharges to municipal separate storm sewer systems (MS4) can contribute to pollution of waters of this commonwealth.
G. 
Inadequate maintenance of stormwater best management practices (BMPs) causes loss of water quality, flooding, and other problems.
H. 
A program of reasonable regulation of connections and discharges to municipal stormwater management facilities will be beneficial.
[Ord. No. 129, 9/3/2015]
1. 
The purpose of this chapter is to promote health, safety, and welfare within West Cocalico Township by minimizing the damages described in § 23-102 of this chapter through provisions designed to:
A. 
Meet legal water quality requirements under state law to protect, maintain, reclaim, and restore the existing and designated uses of the waters of this commonwealth.
B. 
Manage accelerated runoff and erosion and sedimentation problems at their source by regulating activities that cause these problems.
C. 
Utilize and preserve the existing natural drainage systems.
D. 
Maintain recharge of groundwater to minimize degradation of surface water and groundwater quality and protect water resources.
E. 
Maintain existing flows and quality of streams and watercourses in the Township.
F. 
Preserve the flood-carrying capacity of streams.
G. 
Require proper operations and maintenance of all temporary and permanent stormwater management facilities and best management practices (BMPs) that are constructed and implemented.
H. 
Require consistency and compliance with the requirements of the "Countywide Act 167 Plan" dated April 2013, revised August 16, 2013, that are found in "Blueprints: An Integrated Water Resources Plan for Lancaster County."
I. 
Provide procedures, performance standards, and design criteria for stormwater planning and management.
J. 
Implement an illegal discharge detection and elimination program within MS4 permitted urbanized areas to address nonstormwater discharges into a municipal separate storm sewer system.
K. 
Promote stormwater runoff prevention through the use of nonstructural BMPs.
L. 
Provide a regulatory environment that supports the proportion, density and intensity of development called for in the comprehensive plan; allow for creative methods of improving water quality and managing stormwater runoff; and promote a regional approach to water resource management.
M. 
Encourage the preservation, protection, conservation, and restoration of natural resource systems.
N. 
Promote stormwater management practices that emphasize infiltration, evaporation, and transpiration.
[Ord. No. 129, 9/3/2015]
The Supervisors of the Township of West Cocalico, pursuant to the Pennsylvania Storm Water Management Act, Act No. 167 of October 4, 1978, (P.L. 864) (Act 167), Section 680.1 et seq., as amended,[1] the Second Class Township Code, Act of May 1, 1933 (P.L. 103, No. 69), as reenacted and amended by the November 9, 1995 (P.L. 350, No. 60), as amended,[2] and the Pennsylvania Flood Plain Management Act, Act No. 166 of October 4, 1978 (P.L. 851),[3] and 35 P.S. § 691.1 et seq., the Pennsylvania Clean Streams Law, hereby enacts and ordains this chapter as the West Cocalico Township Stormwater Management Ordinance.
[1]
Editor's Note: See 32 P.S. § 680.1 et seq.
[2]
Editor's Note: See 53 P.S. § 65101 et seq.
[3]
Editor's Note: See 32 P.S. § 679.101 et seq.
[Ord. No. 129, 9/3/2015]
1. 
With the exception of activities exempted under § 23-401, the provisions, regulations, limitations, and restrictions of this chapter shall apply to all regulated activities as defined in this chapter within West Cocalico Township.
2. 
This chapter shall apply to temporary and permanent stormwater management facilities constructed as part of any of the regulated activities listed in this section. Temporary stormwater management and erosion and sedimentation control regulated by PADEP under Chapter 102 during construction activities are not specifically regulated by this chapter, but shall continue to be regulated by PADEP under Chapter 102 and the Pennsylvania Clean Streams Law.[1]
[1]
Editor's Note: See 35 P.S. § 691.1 et seq.
3. 
The following activities are defined as "regulated activities" and shall be regulated by this chapter:
A. 
All subdivisions or land developments.
B. 
Major or minor land disturbances.
C. 
Construction of new or additional impervious or semipervious surfaces (driveways, parking lots, etc.).
D. 
Construction of new buildings or additions to existing buildings.
E. 
Diversion or piping of any natural or man-made stream channel.
F. 
Installation or modification of stormwater management facilities or BMPs or appurtenances thereto.
G. 
Any other activities where the Township determines that said activities may affect any existing stormwater management facilities or stormwater drainage patterns.
[Ord. No. 129, 9/3/2015]
For any of the activities regulated by this chapter, the final approval of subdivision and/or land development plans, the issuance of any zoning permit authorizing land disturbance or additional impervious area, or the commencement of any land disturbance activity may not proceed until the property owner or developer or his/her agent has received written approval of a stormwater management site plan from the Township or its designee.
[Ord. No. 129, 9/3/2015]
1. 
Except as otherwise required by law, this chapter is intended as a continuation of, and not a repeal of, existing regulations governing the subject matter. To the extent that this chapter restates regulations contained in ordinances previously enacted by the Township, this chapter shall be considered a restatement and not a repeal of such regulations. It is the specific intent of the Township that all provisions of this chapter shall be considered in full force and effect as of the date such regulations were initially enacted. All ordinances or parts of ordinances inconsistent with the provisions of this chapter are hereby repealed. It is expressly provided that the provisions of this chapter shall not affect any act done, contract executed or liability incurred prior to its effective date, or affect any suit or prosecution pending or to be instituted to enforce any rights, rule, regulation or ordinance, or part thereof, or to punish any violation which occurred under any prior stormwater regulation or ordinance. In the event any violation has occurred under any prior stormwater regulation or ordinance of the Township, prosecution may be initiated against the alleged offender pursuant to the provisions of said prior stormwater regulation or ordinance, and the provisions and penalties provided in said prior stormwater regulation or ordinance shall remain effective as to said violation.
2. 
Any stormwater management site plan pending at the time of the effective date of this chapter shall be allowed to proceed with revisions, finalization, and implementation in accordance with any ordinance in effect prior hereto.
[Ord. No. 129, 9/3/2015]
Should any section, provision or part thereof of this chapter be declared invalid by a court of competent jurisdiction, such decision shall not affect the validity of any of the remaining provisions of this chapter.
[Ord. No. 129, 9/3/2015]
It is not intended by this chapter to repeal, abrogate, annul, or interfere with any existing ordinances or enactment, or with any rule, regulation, or permit adopted or issued thereunder, except insofar as the same may be inconsistent or in conflict with any of the provisions of this chapter, provided that where this chapter imposes greater restrictions upon the use of land, or prescribed larger open spaces than are required by the provisions of other such ordinance, enactment, rule, regulation or permit, then the provisions of this chapter shall control. Furthermore, if a discrepancy exists between any regulations contained within this chapter, that regulation which imposes the greater restriction shall apply.
[Ord. No. 129, 9/3/2015]
Except as specifically provided by the Pennsylvania Storm Water Management Act, Act of October 4, 1978, P.L. 864, No. 167, as amended, 32 P.S. § 680.1 et seq., the making of any administrative decision by the Township or any of its officials or employees shall not constitute a representation, guarantee or warranty of any kind by the Township of the practicability or safety of any proposed structure or use with respect to damage from erosion, sedimentation, stormwater runoff, flood, or any other matter, and shall create no liability upon or give rise to any cause of action against the Township and its officials and employees of the Township, by enacting and amending this chapter, does not waive or limit any immunity granted to the Township and its officials and employees by the Governmental Immunity Act, 42 Pa.C.S.A. § 8541 et seq., and does not assume any liabilities or obligations.
[Ord. No. 129, 9/3/2015]
Any permit or authorization issued or approved based on false, misleading or erroneous information provided by an applicant is void without the necessity of any proceedings for revocation. Any work undertaken or use established pursuant to such permit or other authorization is unlawful. No action may be taken by a board, agency or employee of the Township purporting to validate such a violation.