All construction materials, equipment, procedures and methods
shall conform to the requirements of the Pennsylvania Department of
Transportation Specifications, Publication 408, or latest publication,
unless specifically stated otherwise in this chapter.
Plain cement concrete curb and plain cement concrete curb gutter.
A. For plain cement concrete curb and plain cement concrete curb gutter,
refer to PennDOT Specifications, Sections 630 and 641, as amended.
B. Material. Material shall conform to PennDOT Specifications, Section
630.2, as amended, for plain cement concrete curb, and Section 641.2,
as amended, for plain cement concrete curb gutter.
C. Construction. Construction shall conform to PennDOT Specifications,
Section 630.3, as amended, for plain cement concrete curb, and Section
641.3, as amended, for plain cement concrete curb gutter. Backfill
(compacted) shall be placed within seven days of placement of curb.