The satisfactory installation of the improvements required herein or the posting of a bond securing the improvements shall be a prerequisite to approval of a final plat by the Planning Commission. Prior to starting construction of any proposed improvements for a subdivision, construction plans and specifications shall be prepared by an engineer.
A. 
All streets shall be graded to their full width, including side slopes.
B. 
A standard curb and gutter, with not less than a six-inch face, shall be constructed on both sides of the street.
C. 
Streets shall be surfaced to a width stated herein and with a type of pavement conforming to paving standards of SCDOT.
(1) 
Marginal access streets: minimum 24-foot width between curb faces.
(2) 
Minor collector streets: 40-foot width between curb faces.
(3) 
Minor streets: 28-foot width between curb faces.
D. 
Alleys, wherever platted, shall be surfaced to their full width with a pavement conforming to paving standards of SCDOT.
E. 
Except as hereinafter provided, those portions of thoroughfares included within the subdivision shall be paved by the subdivider to widths and in accordance with paving standards of SCDOT. Whenever the property abutting both sides of a major street is zoned for residential purposes, the subdivider shall be responsible for only that portion of the cost equal to the installation of minor street improvements.
A. 
Storm drainage and sanitary sewers shall be provided by the subdivider. All underground utilities, including water, gas, electrical and telephone service, shall be installed prior to the installation of paving. Sufficient taps shall extend to lot lines to ensure against subsequent cutting of pavement. When sanitary sewers are not reasonably accessible to the subdivision, septic tanks conforming to the standards and requirements of the County Health Department shall be installed. Fire hydrants shall be installed in accordance with specifications of Fire Underwriters.
B. 
No water or sewer tap will be approved with a service line crossing a property line.
Sidewalks shall be constructed along both sides of a thoroughfare and in such other locations where they are deemed necessary for public safety by the Planning Commission. Such sidewalks shall conform to the width requirements and specifications of SCDOT.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II)]
Street name signs shall be installed for payment of a fee as set forth in Appendix A of the current fiscal year's budget document.
Permanent monuments shall be placed at the tangent points of curves and at all corners in the exterior boundary of the subdivision (except at such corners that are inaccessible due to topography) and at such other points as may be designated by the City Engineer. All monuments shall be set flush with the surface of the ground or finished grade. Monuments shall be of reinforced concrete, 30 inches or more in length and six inches or more in diameter with a metal pin at the point of intersection, or an iron rod (5/8-inch or more in diameter and 30 or more inches long) completely embedded in concrete.