[Adopted 6-14-2021 by Ord. No. 381-2021]
[Amended 4-11-2022 by Ord. No. 395-2022]
No siting permit issued under this article shall be valid for
a period longer than 24 months unless construction has actually begun
and continuously and diligently is pursued to completion. Upon written
request from the applicant, the Mayor, upon consultation with the
Construction Official, may extend the siting permit for a period of
up to 12 months so long as construction has begun at the time that
the applicant's request for an extension is made.
A small wireless facility siting permit shall not be required
for:
A. Routine maintenance of a small wireless facility.
B. The replacement of a small wireless facility with another small wireless
facility that is substantially similar or smaller in size, weight
and height to the small wireless facility that is being replaced.
C. Provided, however, that on a location where the Township and/or another
provider has placed equipment or facilities, any routine maintenance
or replacement that is done shall not occur until written authorization
from the Township and/or the other provider, as the case may be, to
proceed is provided to the Township, which authorization to proceed
shall not unreasonably be withheld by the Township and/or the other
provider.
D. Provided further that if the replacement of a small wireless facility
with another small wireless facility includes replacement of the structure
to which the small wireless facility is attached, then an application
for a siting permit shall be required.
All applications for approval and issuance of a small wireless
facility siting permit pursuant to this article shall be accompanied
by a fee as follows:
A. For applications that do not include the installation of any new
structures within a right-of-way, the application fee shall be $500
for up to five small wireless facilities with an additional $100 for
each small wireless facility beyond five.
B. For applications that include the installation of a new structure
within a right-of-way, the application fee shall be $1,000 for up
to five small wireless facilities with an additional $100 for each
small wireless facility beyond five.
An applicant whose siting permit includes the installation of
any new smart pole structure of any of the types that are included
in Appendix A to this article shall provide the Township with access
to any of the technological features that are a component of the new
smart pole structure such as, for example, public access Wi-Fi, 911
call service or security cameras, before the applicant offers such
access to any other person or entity. Should the Township decide to
utilize any such technological features, then the Township, on an
annual basis, shall reimburse the applicant or the subsequent owner
of the structure, the costs, on a dollar-for-dollar basis, of providing
the Township with such access. Such costs shall be limited to the
costs of providing electricity to the components used by the Township
and the costs of any repairs required to be made to the components
used by the Township, unless the repair costs are necessitated by
the acts of the applicant or subsequent owner of the structure, without
regard to whether such acts are negligent or intentional.
All ordinances or parts of ordinances inconsistent with this
article, to the extent of such inconsistencies only, be and the same
hereby are repealed.
This article shall take effective immediately upon final passage
and publication as provided by law.