[Added 12-13-2021 by Ord. No. 2021-35; amended 6-28-2022 by Ord. No. 2022-13]
(a) 
In accordance with N.J.S.A. 40A:26A-11 et seq., as may be amended, the owner of real property within Princeton shall be obligated to pay a sewer connection fee whenever a new physical connection is made to the sanitary sewer system.
(b) 
For property with an existing connection to the sanitary sewer system:
(1) 
If connected to the sanitary sewer system for less than 20 years, any addition, alteration, or change in use that materially increases the level of use and imposes a greater demand on the system shall be subject to payment of a connection fee, even if the addition, alteration, or change in use does not involve a new physical connection of the property to the system.
(2) 
A connection fee shall be owed for any new or additional connection of a property to the sanitary sewer system, for any increase in the size of an existing connection, or for any new construction of additional service units connected to the system that materially increases the level of use or demand on the system.
(3) 
The connection fee shall be based upon the amount by which the increased use and demand on the sanitary system exceeds the use and demand that existed prior to such addition, alternation, or change in use.
(4) 
As used in this section, "materially increases" means any increase in the number of service units; or any other change which increases the level of use or demand on the sanitary sewer system by 15% or more over the highest actual annual use and demand that existed during the prior 10-year period immediately preceding the addition, alteration, or change in use; provided, however, that, if the property has been connected to the sanitary sewer system for less than 10 years, the average level of use and demand shall be calculated based on the actual period of connection.
(c) 
The calculation of anticipated volume of wastewater shall be made by the sewer engineer in accordance with the provisions and standards established by and set forth in N.J.A.C. 7:14A-23.3, as may be supplemented and amended from time to time, based on the establishment type and number of measurement units thereof. The sewer engineer's calculation shall be final.
[Added 12-13-2021 by Ord. No. 2021-35; amended 6-28-2022 by Ord. No. 2022-13]
In accordance with N.J.S.A. 40A:26A-11 et seq., the sewer connection fee charged to an owner (in dollars) shall be the cost incurred by Princeton for the physical connection, including administrative and inspection costs, plus an amount representing a fair payment towards the cost of the sanitary sewer system, calculated as follows:
(a) 
The sewer connection fee shall be $12,110.87 per each residential (3+ bedroom) dwelling unit.
(b) 
For uses other than residential (3+ bedroom) dwelling unit(s), the connection fee shall be calculated by multiplying the anticipated daily volume of wastewater for the use, in gallons per day, by the sewer connection fee rate of $40.37 per gallon per day, with said rate calculated and established by dividing the sewer connection fee for each residential (3+ bedroom) unit (subparagraph (a) of this section) by the NJDEP projected flow of 300 gallons per day as set forth at N.J.A.C. 7:14A-23.3.
(c) 
The sewer connection fee shall be recomputed at the end of each fiscal year by the municipal chief financial officer, in consultation with the sewer engineer and municipal engineer, as necessary. Any changes in the connection fee and connection fee rate shall be adopted by the Council via ordinance following a public hearing thereon.
[Added 6-28-2022 by Ord. No. 2022-13]
For affordable housing units created by public housing authorities, non-profit organizations building affordable housing projects, and any other affordable housing units, including affordable housing units in inclusionary projects in accordance with N.J.S.A. 40A:26A-11.3:
(a) 
The sewer connection fee shall be reduced by 50% for new connections to the sanitary sewer system.
(b) 
For units previously connected to the sanitary sewer system that were demolished or refurbished to allow for new affordable housing units and for which a connection fee was previously paid, a credit against the connection fee shall be provided in an amount equal to the connection fee previously assessed and paid for the units previously connected to the system.
(c) 
The connection fee for units previously connected to the sanitary sewer system that were demolished or refurbished to allow for new affordable housing units shall be the lesser of:
(1) 
The reduced rate provided for in subsection (a) of this section, or
(2) 
The assessment under subsection (b) of this section for units for which a connection fee was previously paid, provided that the public housing authority, non-profit organization, or other affordable housing owner can establish the connection fee was previously assessed and paid for connection with the system. If such previous assessment and payment cannot be established, the reduced rate provided for in subsection (a) of this section shall be assessed.
[Added 6-28-2022 by Ord. No. 2022-13]
(a) 
In accordance with N.J.S.A. 40A:26A-11.2, a credit shall be provided toward the connection fee to be charged for a reconnection of a disconnected property that was previously connected to the sanitary sewer system, provided that:
(1) 
The property has been connected to the sanitary sewer system for at least 20 years; and
(2) 
Service charges have been paid for the property in at least one of the last five years.
(b) 
The credit required under subsection (a) of this section shall be calculated as follows:
(1) 
If the reconnection does not require any new physical connection or does not increase the nature or size of the service or the number of service units, or does not expand the use of the sanitary sewer system, the credit shall be equal to the new connection fee.
(2) 
If the reconnection requires a new physical connection, increases the nature or size of the service or the number of service units, or expands the use of the sanitary sewer system, the credit shall be equal in amount to any connection fee previously paid for the property, and the amount charged shall be the difference between the credit and the connection fee for the new use or class.
(3) 
If no connection fee was ever paid for the property, but all service charges due and owing on the property have been paid for at least 20 years, the credit shall be equal in amount to the new connection fee, provided, however, that any charge due and owing pursuant to paragraph (2) of this subsection shall be paid.
(c) 
If no connection fee was ever paid for a disconnected property that is to be reconnected and which was previously connected to the sanitary sewer system for at least 20 years, in addition to any amount due and owing after application of a credit pursuant to this section, a connection fee shall be charged that is equal to the lesser of:
(1) 
Twenty (20%) percent of the service charges that would have been paid based upon the usage for the last full year that the property was connected to the sanitary sewer system for the period from the date of the disconnection from the system to the date of the new connection; or
(2) 
The new connection fee.
(d) 
A credit shall not be allowed under this section for a property that has been disconnected from the sanitary sewer system for more than five years.
(e) 
As used in this section, "disconnected property" means a property that has been physically disconnected from the sanitary sewer system or a property not physically disconnected but to which service has been discontinued without payments being made. A "disconnected property" shall not include a property that has been temporarily disconnected from the system or to which service has been discontinued without payments being made for less than 12 consecutive months and is being reconnected as it existed, prior to the temporary disconnection or discontinuance of service.
[Added 6-28-2022 by Ord. No. 2022-13]
For Laundromats, as listed and included within N.J.A.C. 7:14A-23.3, the sewer connection fee shall be reduced by 50%.