A. 
Consolidated water rates shall be charged in accordance with Appendix A.[1] Meters will be read quarterly during the period immediately preceding the expiration of the quarter and billed accordingly.
[1]
Editor's Note: Appendix A is included as an attachment to this chapter.
B. 
Water fees shall be charged in accordance Appendix B[2] and billed accordingly.
[2]
Editor's Note: Appendix B is included as an attachment to this chapter.
For users outside of the Water District, the charges will be 1.25 times the charges as set forth in Appendix A.
New subscribers coming in during a quarter need pay only the consumption charge.
A. 
Water for building construction will be charged for at a flat rate. The minimum charge for any building shall be as set forth in the fee schedule duly adopted by the Town Board.[1]
[1]
Editor's Note: The Water District Fee Schedule is included as an attachment to this chapter.
B. 
The Town Board reserves the right to regulate the purpose for which the water may be used during construction and may at its option require the water to be metered.
C. 
No water shall be obtained from the mains of the Water District for any purpose, except properly authorized building construction, except through a metered service.
D. 
When meters are furnished for temporary service, a deposit will be required, to be fixed by the Town Engineer in each case.