The Town Board acknowledges that prior to construction of a
WECS or a small WECS, an assessment is typically needed to determine
local wind speeds and the feasibility of using particular sites. Installation
of wind measurement towers, also known as anemometer ("met") towers,
shall be permitted as special uses, but shall not be limited to those
areas delineated as Wind Overlay Districts.
An application for a wind measurement tower shall include:
A. Name, address, and telephone number of the applicant, owner, contractors
and project sponsor. If the applicant is represented by an agent,
the application shall include the name, address and telephone number
of the agent as well as an original signature of the applicant authorizing
the representation.
B. Name, address, and telephone number of the property owner. If the
property owner is not the applicant, the application shall include
a letter or other written permission signed by the property owner
i) confirming that the property owner is familiar with the proposed
applications and ii) authorizing the submission of the application.
C. Address of each proposed tower site, including Tax Map section, block
and lot number.
E. Decommissioning plan, including a security bond, irrevocable line
of credit, or cash for removal.