(A) Grading
and drainage plans for other than one- to two-family residential developments
shall be provided to the City by the developer prior to building permit
issuance on all projects.
(B) No person
shall alter, change, modify, excavate or fill any lot, subdivision
or development except in compliance with the GDC and the Technical
Standards Manual issued by the City of Garland Department of Engineering.
When any lot, development or subdivision has been altered, changed
or modified without compliance with the GDC and the Technical Standards
Manual issued by the City of Garland Department of Engineering, the
Director of Engineering or Building Official may require the developer,
at its own expense, to submit of proof of compliance, certified by
a licensed engineer.
(Ordinance 7052, sec. 8, adopted 5/7/19)
Any paving or drainage improvements shall be subject to Article
VIII of this Chapter.
(Ordinance 7052, sec. 9, adopted 5/7/19)
(A) New
pavement which does not meet the minimum requirements as outlined
in the City of Garland Technical Standards Manual and Standard Construction
Details shall be replaced at the discretion of the Director of Engineering.
The Director of Engineering may establish an allowable penalty policy
in lieu of requiring total removal and replacement.
(B) The
contractor shall be responsible for furnishing all laboratory tests
necessary for testing new pavement. The testing laboratory used shall
be under the management of a registered professional engineer.
(Ordinance 7052, sec. 10, adopted 5/7/19)