An erosion and sediment control plan is required at the time of application
for all projects, unless the requirement has been waived. Plan approval
by the Planning Board or its agent is required prior to any site-altering
activity. The plan shall be designed to ensure compliance with these
regulations, the Small MS4 General Permit, the Massachusetts Soil
Erosion and Sediment Control Guidelines for Urban and Suburban Areas,
as amended, and, if applicable, the NPDES General Permit for Stormwater
Discharges from Construction Activities. In addition, the plan shall
ensure that the Massachusetts Surface Water Quality Standards (314
CMR 4.00) are met in all seasons.