The following special studies or reports to be developed by qualified professionals may be required to support and justify subdivision and land development proposals as required by this chapter and Chapter
500, Zoning, of the Borough Code.
The stormwater management report shall be a self-contained report that includes all required calculations and design elements. All plans showing the proposed storm sewer construction shall be accompanied by a complete design prepared by a registered engineer currently licensed in the Commonwealth of Pennsylvania. The reports and hydrologic calculations shall be based upon Chapter
441, Stormwater Management, of the Borough Code, as applicable.