No siting permit issued under this chapter shall be valid for
a period longer than twelve (24) months unless construction has actually
begun and continuously and diligently is pursued to completion. Upon
written request from the applicant, the Mayor, upon consultation with
the Construction Official, may extend the siting permit for a period
of up to 12 months so long as construction has begun at the time that
the applicant's request for an extension is made.
A small wireless facility siting permit shall not be required
for:
A. Routine maintenance of a small wireless facility.
B. The replacement of a small wireless facility with another small wireless
facility that is substantially similar or smaller in size, weight
and height to the small wireless facility that is being replaced.
C. Provided, however, that on a location where Dover and/or another
provider has placed equipment or facilities, any routine maintenance
or replacement that is done shall not occur until written authorization
from Dover and/or the other provider, as the case may be, to proceed
is provided to Dover, which authorization to proceed shall not unreasonably
be withheld by Dover and/or the other provider.
D. Provided further that if the replacement of a small wireless facility
with another small wireless facility includes replacement of the structure
to which the small wireless facility is attached then an application
for a siting permit shall be required.
An applicant whose siting permit includes the installation of
any new smart pole structure of any of the types that are included
in Appendix "A" to this chapter shall provide Dover with access to any of the technological
features that are a component the new smart pole structure such as,
for example, public access Wi-Fi, 911 call service or security cameras,
before the applicant offers such access to any other person or entity.
Should Dover decide to utilize any such technological features then
Dover, on an annual basis, shall reimburse the applicant or the subsequent
owner of the structure, the costs, on a dollar-for-dollar basis, of
providing Dover with such access. Such costs shall be limited to the
costs of providing electricity to the components used by Dover and
the costs of any repairs required to be made to the components used
by Dover, unless the repair costs are necessitated by the acts of
the applicant or subsequent owner of the structure, without regard
to whether such acts are negligent or intentional.