Upon presentation of proper credentials, duly authorized representatives
of the Borough may enter at reasonable times upon any property within
the Borough to inspect the condition of the stormwater structures
and facilities in regard to any aspect regulated by this chapter.
In the event that a person fails to comply with the requirements
of this chapter, or fails to conform to the requirements of any permit
issued hereunder, the Borough shall provide written notification of
the violation. Such notification shall set forth the nature of the
violation(s) and establish a time limit for correction of the violation(s).
Failure to comply within the time specified shall subject such person
to the penalty provision of this chapter. All such penalties shall
be deemed cumulative. In addition, the Borough may pursue any and
all other remedies. It shall be the responsibility of the owner of
the real property on which any regulated activity is proposed to occur,
is occurring, or has occurred, to comply with the terms and conditions
of this chapter.
The municipal governing body is hereby authorized and directed
to enforce all of the provisions of this chapter. All inspections
regarding compliance with the stormwater management site plan shall
be the responsibility of the Municipal Engineer or other qualified
persons designated by the Borough.
A. A set of design plans approved by the Borough shall be on file at
the site throughout the duration of the construction activity. Periodic
inspections may be made by the Borough or designee during construction.
B. Adherence to approved plan. It shall be unlawful for any person, firm, or corporation to undertake any activity under §
377-4 on any property except as provided for in the approved stormwater management site plan and pursuant to the requirements of this chapter. It shall be unlawful to alter or remove any control structure required by the stormwater management site plan pursuant to this chapter or to allow the property to remain in a condition which does not conform to the approved stormwater management site plan.
C. At the completion of the project, and as a prerequisite for the release
of the performance guarantee, the owner or his representative shall:
(1) Provide a certification of completion from an engineer, architect,
surveyor or other qualified persons verifying that all permanent facilities
have been constructed according to the plans and specifications and
approved revisions thereto.
(2) Provide a set of as-built drawings.
D. After receipt of the certification by the Borough, a final inspection
shall be conducted by the governing body or its designee to certify
compliance with this chapter.