[Amended 3-24-1981 by Ord. No. 12-1981; 12-10-1984 by Ord. No. 19-1984; 12-28-1989 by Ord. No. 28-1989; 8-27-1991 by Ord. No. 19-1991; 6-7-1993 by Ord. No. 20-1993; 1-23-1996 by Ord. No.
3-1996; 9-13-2005 by Ord. No. 26-2005; 2-11-2014 by Ord. No. 04-2014; 9-27-2016 by Ord. No. 23-2016; 3-16-2017 by Ord. No. 02-2017; 2-22-2022 by Ord. No. 3-2022; 6-14-2022 by Ord. No. 13-2022]
A. Construction Department fees.
(1) Plan review fee. The fee for plan review shall be 20% of the amount
to be charged for a new construction permit.
(2) The basic construction fee shall be the sum of the parts computed
on the basis of the volume or cost of construction, the number of
plumbing fixtures and pieces of equipment, the number of electrical
fixtures and devices, the number of sprinklers, standpipes and detectors
(smoke and heat), at the unit rates provided herein, plus any special
fees. The minimum fee for a basic construction permit covering any
or all of the building, plumbing, electrical or fire protection work
shall be $100.
(3) Building volume or cost. The fees for new construction or alteration
are as follows:
(a)
Fees for new construction shall be based upon the volume of
the structure. Volume shall be computed in accordance with N.J.A.C.
5:23-2.28. The new construction fee shall be in the amount of $0.035
per cubic foot of volume for buildings and structures of Use Group
R5, except that the fee shall be $0.043 per cubic foot of volume for
all other Use Groups. The minimum fee for new construction shall be
$175.
(b)
The unit rate for large, open-volume, single story spaces in
buildings, such as barns, silos, greenhouses, warehouses, distribution
centers, and other agricultural, and storage-use occupancies, shall
be the amount of $0.033 per cubic foot of volume. For the purpose
of calculating the volume to determine the fee for these spaces, the
height shall be limited to 20 fee not withstanding the fact that the
actual height of the space may be greater than 20 feet.
(c)
Fees for renovations, alterations and repairs.
[1]
Fees for renovations, alterations and repairs of Use Group Type
R5 shall be based upon the estimated cost of the work.
[a] The fee shall be in the amount of $35 per $1,000.
[b] From $50,001 to and including $100,000, the additional
fee shall be in the amount of $30 per $1,000 of the estimated cost
above $50,000.
[c] Above $100,000, the additional fee shall be in
the amount of $25 per $1,000 of the estimated cost above $100,000.
[2]
Fees for renovations, alterations and repairs of all other Use
Group types shall be based upon the estimated cost of the work.
[a] The fee shall be in the amount of $40 per $1,000.
[b] From $50,001 to and including $100,000, the additional
fee shall be in the amount of $35 per $1,000 of the estimated cost
above $50,000.
[c] Above $100,000, the additional fee shall be in
the amount of $30 per $1,000 of the estimated cost above $100,000.
[4]
The Construction Official shall make the final decision regarding
estimated cost.
[a] Fees for additions shall be computed on the same
basis as for new construction for the added portion, except that the
minimum fee for an addition shall be $175.
[b] Fees for combination renovations and additions shall be computed as the sum of the fees computed separately in accordance with Subsection
A(3)(a) and
(b) above.
[c] In order to provide for the training and certification
and technical support programs required by the Act, the enforcing
agency shall collect a surcharge fee to be based upon the volume of
new construction within the municipality. Said fee shall be accounted
for and forwarded to the Bureau of Housing Inspection. This fee shall
be in the amount as set forth in N.J.A.C. 5:23-4.19(b). For the purpose
of calculating this fee, volume shall be computed in accordance with
N.J.A.C. 5:23-2.28.
(d)
The fee for the installation or replacement of roofing, siding
or radon in Use Group R5 shall be $100.
(e)
The fee for the installation of an above-ground pool in Use
Group R5 shall be $100.
(f)
The fee for the installation of an in-ground pool in Use Group
R5 shall be $150.
(g)
The fee for the installation of asbestos or lead abatement in
Use Group R5 shall be $100.
(h)
The minimum fee for any permit issued for the building subcode
shall be $100.
(4) Plumbing fixtures and equipment.
(a)
For the purpose of computing fees:
[1]
Plumbing fixtures shall include, but not be limited to, stacks,
lavatories, kitchen sinks, slop sinks, sinks, urinals, water closets,
bathtubs, shower stalls, laundry tubs, floor drains, washing machine
connections and similar fixtures.
[2]
Plumbing appurtenances shall include, but not be limited to,
devices, a manufactured device or an on-the-job assembly of component
parts, which is adjunct to the basic piping system and plumbing fixtures,
pressure-reducing valves, backflow prevention devices, backwater valves,
vacuum breakers, grease traps, interceptors and similar devices.
[3]
Plumbing appliances shall include, but not be limited to, hot-water
heaters, tankless heaters, heat exchangers, water storage tanks, solar
panels, water pressure booster systems, sump pumps, dishwashers, ice
makers, instant hot-water coils, sewerage ejectors, garbage disposal
units, sterilizers, aspirators, water-cooled air-conditioning units,
condensation piping, water conditioners and similar equipment.
(b)
The fee for the installation or replacement of a plumbing fixture
shall be $100 for the first fixture and $2 for each additional plumbing
fixture.
(c)
The fee for the installation or replacement of a plumbing appurtenance
and/or special device shall be $100 for the first appurtenance and
$2 for each additional plumbing appurtenance and/or special device.
(d)
For cross connections and backflow preventers that are subject
to testing, requiring reinspection annually, the fee shall be $50
for each device when tested (twice annually) and $100 for each device
when broken down and tested (once annually).
(e)
The fee for the installation or replacement of a plumbing appliance
shall be $100 for the first $2 for each additional device.
(f)
The fee for the installation of a house or building sewer and/or
water service pipe is $100.
(g)
The fee for the installation of a lawn sprinkler system shall
be $100 the first head and $2 for each additional sprinkler head.
(h)
The fee for the installation or replacement of subsoil drains
shall be $100.
(i)
The fee for the removal or abandonment in place of a sewage
disposal system and/or septic tank shall be $100.
(j)
The fee for the installation or replacement of roof drains and/or
area drains shall be $100 for the first drain $2 per additional drain.
(k)
The fee for gas piping is $100 for the first appliance $2 per
each additional gas appliance connection.
(l)
The fee for the installation or replacement of LP tanks, oil
lines and/or oil tank piping shall be $100 for the first tank/line
$2 per additional line.
(m)
The minimum fee for any permit issued for the plumbing subcode
shall be $100.
(5) Electrical fixtures and devices.
(a)
The fees shall be as follows:
[1]
For any receptacles or fixtures, the fee shall be in the amount
of $100 for the first receptacle/fixture $2 Per additional receptacle
fixture.
For the purpose of computing this fee, receptacles or fixtures
shall include lighting outlets, wall switches, fluorescent fixtures,
convenience receptacles or similar fixtures and motors or devices
of less than one horsepower or one kilowatt.
[2]
For each motor or electric device greater than one horsepower
and less than or equal to 10 horsepower and for the transformers and
generators greater than one kilowatt and less than or equal to 10
kilowatts, the fee shall be 125.
[3]
For each motor or electrical device greater than 10 horsepower
and less than or equal to 50 horsepower, for each service panel, service
entrance or subpanel less than or equal to 200 amperes and for all
transformers and generators greater than 10 kilowatts and less than
or equal to 50 kilowatts, the fee shall be $150.
[4]
For each motor or electrical device greater than 50 horsepower
and less than 100 horsepower, for each service panel, service entrance
or sub panel greater than 200 amperes and less than 1,000 amperes
and for transformers and generators greater than 50 kilowatts and
less than or equal to 112.5 kilowatts, the fee shall be $175.
[5]
For each motor or electrical device greater than or equal to
100 horsepower, for each service panel, service entrance or subpanel
equal to or greater than 1,000 amperes and for each transformer or
generator equal to or greater than 112.5 kilowatts, the fee shall
be $375.
[6]
For each photovoltaic system the fee shall be: Up to 50 kilowatts
$100, greater than 50 kilowatts up to 100 kilowatts $300, greater
than 100 kilowatts $600.
[7]
For each radon system, the fee shall be $100.
(b)
For the purpose of computing these fees, all motors except those
in plug-in appliances shall be counted, including control equipment,
generators, transformers and all heating, cooking or other devices
consuming or generating electrical current.
(c)
The minimum fee for any permit issued for the electrical subcode
shall be $100.
(6) Fire protection and other hazardous equipment. Fees for sprinklers,
standpipes, detectors (smoke and heat), pre-engineered suppression
systems, gas- and oil-fired appliances not connected to the plumbing
system, kitchen exhaust systems, incinerators and crematoriums shall
be as follows:
(a)
The fee for heads or alarm devices shall be $100 for the first
head or alarm and $2 per additional device(s) shall be charged.
(b)
The fee for each standpipe shall be $300.
(c)
The fee for each pre-engineered system shall be $125.
(d)
The fee for each gas or oil-fired appliance not connected to
the plumbing system shall be $100.
(e)
The fee for each kitchen exhaust system shall be $150.
(f)
The fee for each incinerator shall be $400.
(g)
The fee for each crematorium shall be $400.
(h)
The fee for fireplace venting or metal chimney shall be $100.
(i)
The fee for a smoke control system shall be $125.
(j)
The fee for a fire pump shall be $200.
(k)
The fee for fire extinguishers shall be a flat rate of $100.
(l)
The fee for a fuel storage tank shall be $100 for R-5 and $300
for all other use groups.
(m)
The fee for a sprinkler control valve shall be $100.
(n)
The fee for solar installation shall be $100.
(o)
The minimum fee for any permit issued for the fire Subcode shall
be $100.
(7) Elevator devices. In accordance with Department of Community Affairs
fee structure.
(8) Mechanical subcode fees:
(a)
Any replacements and or installations with regards to one- and
two-family dwellings where appliances such as water heaters, boilers,
etc. . . which fall under the mechanical subcode, shall be charged
$100 for the first appliance and $2 per additional fixture or device.
(b)
The minimum fee for any permit issued for the mechanical subcode
shall be $100.
(9) Certificates and other permits. The fees are as follows:
(a)
The fee for a demolition or removal permit shall be $200 for
one- or two-family residences (Use Group R-5 of the Building Subcode);
$100 for other structures in Use Group R-5 lots, and $300 per story
for all other use groups.
(b)
The fee for a permit to construct a sign shall be in the amount
of $5 per square foot surface area of the sign, computed on one side
only for double-faced signs. The minimum fee shall be $100.
(c)
The fee for a certificate of occupancy shall be in the amount
of 10% of the new construction permit would be charged by the enforcing
agency pursuant to these regulations fee which, the minimum fee shall
be $125.
(d)
The fee for a certificate of occupancy granted pursuant to a
change of use group shall be $125.
(e)
The fee for a certificate of continued occupancy shall be $100.
(f)
There shall be no fee for first temporary certificate of occupancy,
subsequent extensions temporary certificates of occupancy $30 each
extension.
(g)
There shall be no fee for a certificate of compliance issued
for each elevator device inspected on a routine periodic basis. The
certificate of compliance for a new elevator device shall be $85.
(h)
The fee for a plan review of a building for compliance under-the
alternate systems and nondepletable energy source provisions of the
energy subcode shall be $200 for one- and two-family homes and for
light commercial structures having the indoor temperature controlled
from a single point; and $500 for all other structures.
(i)
The fee for an application for a variation In accordance with
N.J.A.C. 5:23-2.10 shall be $350 for Class 1 structures and $85 for
Class 2 and Class 3 structures. The fee for the resubmitting of an
application for a variation shall be $200 for Class 1 structures and
$50 for Class 2 and Class 3 structures.
(j)
Periodic inspections. Fees for the periodic reinspection of
equipment and facilities granted a certificate of approval for a specified
duration in accordance with N.J.A.C. 5:23-2.23 shall be as follows:
For cross connections and backflow preventers that are subject to
testing, requiring reinspection every three months, the fee shall
be $50 for each device when tested (twice annually) and $100 for each
device when broken down and tested (once annually).
(k)
The fee to be charged for an annual construction permit shall
be charged annually. This fee shall be a flat fee based upon the number
of maintenance workers employed by the facility and who are primarily
engaged in work that is governed by a subcode. Managers, engineers
and clerks shall not be considered maintenance workers for the purpose
of establishing the annual construction permit fee. Annual permits
may be issued for building/fire protection, electrical and plumbing.
Fees shall be as follows:
[1]
One to 25 workers (including foreman): $600; and each additional
worker over 25: $200.
[2]
Prior to the issuance of the annual permit, a training registration
fee of $100 per subcode shall be submitted by the applicant to the
Department of Community Affairs, Construction Code Element, Training
Section, along with a copy of the construction permit (Form F-170).
Checks shall be made payable to "Treasurer, State of New Jersey."
(l)
For each public pool (other than one- and two-family dwellings),
the fee shall be $100 for an annual certification.
(m)
The fee for a change of contractor shall be $35.
(n)
There shall be an additional fee of $65 per hour for review
of any amendment or change to a plan that has already been released.
(10)
All fees collected pursuant to this section are nonrefundable.
B. Report of the Construction Official. On or before February 10 of
each year, the Construction Official shall, with the advice of the
subcode officials and in consultation with the Municipal Finance Officer,
prepare and submit to the governing body a report detailing the receipts
and expenditures of the enforcing agency as required by N.J.A. C.
5:23-4.17(b) and indicating his recommendations for a fee schedule,
based on the operating expense of the agency.
C. State surcharge. In order to provide for the training, certification
and technical support programs required by the Uniform Construction
Code Act and the regulations, the enforcing agency shall collect,
in addition to the fees specified above, a surcharge fee per cubic
foot of volume of new construction as mandated by the Department of
Community Affairs. Said surcharge fee shall be remitted to the Bureau
of Housing Inspection, Department of Community Affairs, on a quarterly
basis for the fiscal quarters ending September 30, December 31, March
31 and June 30, and not later than one month next succeeding the end
of the quarter for which it is due. In the fiscal year in which the
regulations first become effective, said fee shall be collected and
remitted for the third and fourth quarters only. The enforcing agency
shall report annually at the end of each fiscal year to the Bureau
of Housing Inspection, and not later than July 31, the total amount
of the surcharge fee collected in the fiscal year. In the fiscal year
in which the regulations first become effective, said report shall
be for the third and fourth quarters.
[Amended 6-24-1980 by Ord. No. 21-1980]
The construction official shall prepare and
submit to the Mayor and Board of Aldermen biannually a report reevaluating
the delineation of the fire limits. This report shall indicate the
recommendations of the construction official, the building subcode
official and the fire subcode official regarding those areas which
should be designated as within fire limits, with the reasons therefor.
The following fire limits are established pursuant to N.J.A.C. 5:23:
Beginning at a point in the center line of the Erie Lackawanna Railroad
(formerly the D.L. & W.R.R.) where said center line is intersected
by the municipal boundary between the Town of Dover and the Borough
of Wharton, said point also being in the center of the Rockaway River;
and running thence (1) northerly along said boundary and along said
river to a point in the center line of Edison Street extended; thence
(2) easterly along said center line of Edison Street to a point in
the center line of Bowlby Avenue extended; thence (3) southerly along
said center line of Bowlby Avenue to a point in the center line of
Richboynton Road; thence (4) easterly along said center line of Richboynton
Road to a point in the center line of N.J. State Highway Route 15
(West Clinton Street); thence (5) southerly and southeasterly to a
point in a line parallel to and 100 feet northwesterly of the northwesterly
line of U.S. Route 46 (West Mcfarlan Street); thence (6) northwesterly
and easterly along said line parallel to and distant 100 feet from
Route 46 to a point in the center line of Searing Street; thence (7)
northwesterly along said center line of Searing Street to a point
in the center line of Oak Street; thence (8) northeasterly along said
center line of Oak Street to a point in the center line of Berry Street;
thence (9) southeasterly along said center line of Berry Street to
a point in the center line of Elm Street; thence (10) southwesterly
along said center line of Elm Street to a point in the center line
of King Street; thence (11) southeasterly along said center line of
King Street to a point in the aforementioned line parallel to and
distant 100 feet from Route 46; thence (12) easterly along said line
to a point in the municipal boundary between the Township of Rockaway
and the Town of Dover; thence (13) southeasterly and southwesterly
along said boundary to a point in a line parallel to and distant 100
feet northwesterly from the northeasterly side line of Harding Avenue;
thence (14) northwesterly along said line to a point in the center
line of Wilson Street; thence (15) southwesterly along said center
line of Wilson Street to a point in the center line of Harding Avenue;
thence (16) northwesterly along said center line of Harding Avenue
to a point in the dividing line extended between Lots 1 and 16 on
the northwest and Lots 2 and 15 on the southeast in Block 22-05 as
shown on the Tax Maps of the Town of Dover; thence (17) southwesterly
along said dividing line to a point in the center line of South Salem
Street; thence (18) northwesterly along said center line of Salem
Street (original location) to a point in the center line of the above-mentioned
Erie Lackawanna Railroad; thence (19) westerly and northerly to the
municipal boundary and the point and place of beginning.